Loading...
HomeMy WebLinkAboutMINUTES - 10282008 - C.91 i1 sE..L TO: BOARD OF SUPERVISORS AS GOVERNING Contra BOARD OF THE FLOOD CONTROL & WATER CONSERVATION DISTRICT T Costa un a z FROM: JULIA R. BUEREN, CHIEF ENGINEER County ST'9 COUtz� DATE: October 28, 2008 SUBJECT: CONTINUE the emergency action originally taken by the Board of Supervisors on April 10, 2007, regarding the Lower Walnut Creek Interim Protection Measures project, Pacheco area. (Flood Control Zone 313 Funds) (Districts II & IV) Project No. 7520-6138345 SPECIFIC REQUEST(S)OR RECOMMENDATION(S)&BACKGROUND AND JUSTIFICATION RECOMMENDED ACTION: DETERMINE that there is a need to continue the emergency action taken by the Board of Supervisors on April 10,2007,pursuant to Public Contract Code Sections 22035 and 22050,to implement the Lower Walnut Creek Interim Protection Measures project, Pacheco area. FISCAL IMPACT: The total estimated contract cost is $8,500,000, funded by Flood Control Zone 313 Funds. CCtNIINUED ON ATTACHMENT: ❑D SIGNATURE• RECOMMENDATION OF COUNTY ADMINISTRATOR OMMENDA 'ION BOARD COM E APPROVE OTHER SIGNATURE(S): �J ACTION OF BOARD ON � «/, APPROVED AS RECOMMENDED y VOTE OF SUPERVISORS: I HEREBY CERTIFY THAT THIS IS A TRUE AND CORRECT COPY OF AN ACTION TAKEN AND ENTERED ON UNANIMOUS(ABSENT lay ) MINUTES OF THE BOARD OF SUPERVISORS ON THE AYES: NOES: DATE SHOWN. ABSENT: ABSTAIN: Contact: Greg Connaughton(925)313-2271 /� Q� GC:PD:cw W-rOX�� 9,01` �J✓O G:\FldCtl\Board Orders 2005 Onward\2008 BO\Lower Walnut Creek Emergency ATTESTED lel/ BO 10-28-08.doe DAVID TWA,CLERK OF THE BOARD OF SUPERVISORS AND COUNTY ADMINISTRATOR cc: County Administrator Auditor—Controller Public Works: Julia R.Bueren,Chief Engineer. BY: DEPUTY R.Mitch Avalon,Deputy Chief Engineer Kevin Emigh,Construction Greg Connaughton,Flood Control Paul Detjens,Flood Control SUBJECT: CONTINUE the emergency action originally taken by the Board of Supervisors on April 10,2007, regarding the Lower Walnut Creek Interim Protection Measures project, Pacheco area. (Flood Control Zone 3B Funds) (Districts II & IV) Project No. 7520-6138345 DATE: October 28, 2008 PAGE: 2 of 2 REASONS FOR RECOMMENDATIONS AND BACKGROUND: A. On April 10, 2007, the Board of Supervisors declared an emergency and authorized the Chief Engineer to proceed in the most expeditious manner to repair or replace the Lower Walnut Creek flood control facility as directed by the US Army Corps of Engineers. B. Repair status: The Contra Costa County Flood Control and Water Conservation District(District)prepared the Lower Walnut Creek Corrective Action Plan and presented it to the US Army Corps of Engineers for consideration on June I I 2007. A status report,including this Corrective Action Plan(CAP),was presented to the Transportation,Water and Infrastructure Committee on June 25, 2007. Project plans were prepared and the District contracted with Pacific States Environmental Consultants to construct the first phase of the Lower Walnut Creek Interim Protection Measures project pursuant to the CAP. This first phase of the project was completed in early December 2007. However, additional work is required to fully implement the CAP. The CAP is currently under review by US Army Corps of Engineers Headquarters. The full scope and schedule of the CAP will not be known until completion of the federal review. CONSEQUENCES OF NEGATIVE ACTION: Nonconcurrence with the above recommendation may significantly delay implementation of the remaining CAP work in Lower Walnut Creek flood control facility and prevent the District from meeting the correction schedule required by the US Army Corps of Engineers.