Loading...
HomeMy WebLinkAboutMINUTES - 10142008 - C.64 s - L TO: REDEVELOPMENT AGENCY/ Contra BOARD OF SUPERVISORS I,±�o Costa FROM: DAVID TWA EXECUTIVE DIRECTOR/ County COUNTY ADMINISTRATOR as, 7 ra idsUK DATE: October 14, 2008 SUBJECT: Montalvin Manor— San Pablo Avenue and Kay Road Pedestrian Improvements SPECIFIC REQUEST($)OR RECOMMENDATION(S)&BACKGROUND AND JUSTIFICATION RECOMMENDATION: As the Governing Board of the Redevelopment Agency, APPROVE and AUTHORIZE the Redevelopment Director to execute a Project Agreement and Work Program with Contra Costa County, in the amount of $1,300,000 for the pedestrian improvements along San Pablo Avenue and Kay Road in the Montalvin Manor Redevelopment Project Area, with a term of July 1, 2008 to June 30, 2009. As the Board of Supervisors, APPROVE and AUTHORIZE the Public Works Director, or her designee, to execute a Project Agreement and Work'Program with the Contra Costa County Redevelopment Agency, in the amount of$1,300,000 for the pedestrian improvements along San Pablo Avenue and Kay Road in the Montalvin Manor Redevelopment Project Area, with a term of July 1, 2008 to June 30, 2009. FINANCIAL IMPACT: No General Funds would be utilized. Redevelopment Agency funds and Transportation for Livable Communities funds will be used for the improvements. CONTINUED ON ATTACHMENT: ® YES SIGNATURE: JK RECOMMENDATION OF EXECUTIVE DIRECTOR ❑ RECO ENC ATION OF tENCY COM TEE APPROVE ❑ OTHER SIGNATURE(S): ACTION OF AGENCY ON APPROVED AS RECOMMENDED /OTHER. ❑ VOTE OF COMMISSIONERS: I HEREBY CERTIFY THAT THIS IS A TRUE AND CORRECT COPY OF AN ACTION TAKEN AND UNANIMOUS(ABSENT ENTERED ON THE MINUTES OF THE AYES: NOES: REDEVELOPMENT AGENCY ON THE DATE SHOWN. ABSENT: ABSTAIN: `'/141"Iv Contact: Gabriel Lemus (335-7229) ATTESTED VG/Od7 DAVID TWA,AGENCY SECRETARY Orig: Redevelopment Agency cc: CAO County Counsel By: Z -Deputy Conservation&Development Department Redevelopment Agency Public Works Department BACKGROUND: The Montalvin Manor Pedestrian and Transit Access Improvement Strategy document, accepted by the Agency on July 13, 2004, identified the goal of strengthening pedestrian and bike access, and safety for the overall neighborhood. Creating sidewalks and improving bicycle access along San Pablo Avenue and Kay Road were identified as top priority actions by the Montalvin Manor community that would improve the overall pedestrian safety for the neighborhood. The development and improvement of sidewalks and bicycle access along San Pablo Avenue and Kay Road would create a safe and pleasant pedestrian environment by connecting the residents to' important community amenities and other transit stops. The scope of the project will include engineering and design plans, environmental review, construction engineering, and installation of the sidewalk/streetscape improvements. Improvements will include, but not limited to re-grading, installation of approximately 3,000 feet of sidewalk, bus shelter installation, and improvement of the drainage system. The improvements along San Pablo Avenue and Kay Road, when completed, will improve the overall pedestrian safety and create a pleasant streetscape along San Pablo Avenue and Kay Road, which would benefit all the residents in the community.