Loading...
HomeMy WebLinkAboutMINUTES - 01222008 - C.2 TO: BOARD OF SUPERVISORS �E"`8E L'°� Contra FROM: MAURICE M. SHIU, PUBLIC WORKS DIRECTOR `s Costa o' a 11ogY- , `oa, - c�~,ko DATE: January 22, 2008 Sr—Coax County SUBJECT: Accepting and Giving Notice of Completion of Contract for the Pacifica Avenue Improvements project, Bay Point area(District V), Project No. 0662-6R4106-07 SPECIFIC REQUEST(S)OR RECOMMENDATION(S)&BACKGROUND AND JUSTIFICATION RECOMMENDED ACTION: ADOPT Resolution No. 2008/***accepting as complete the contracted work performed by W.R. Forde Associates, for the Pacifica Avenue Improvements project, as recommended by the Public Works Director, Bay Point area. FISCAL IMPACT: Project was funded by 27.8%Bicycle Transportation Account(BTA),6.25%Local Gas Tax,28.46% Safe Route to School (SR2S) & 37.49% Transportation Development Act (TDA) Funds. REASONS FOR RECOMMENDATIONS AND BACKGROUND: The Public Works Director reports that said work has been inspected and complies with the approved plans,special provisions and standard specifications and recommends its acceptance as complete as of January 8, 2008. CONSEQUENCES OF NEGATIVE ACTION: Contractor will not be paid and acceptance notification will npt_,bt recorded.__. Continued on Attachment: SIGNATURE: RECOMMENDATION OF COUNTY ADMINISTRATOR ❑ RECO N OF BOARD CO ITTEE APPROVE OTHER SIGNATURE(S): ACTION OF BO ON APPROVED AS COMMENDED OX k4ftHER VOA OF SUPERVISORS �/ UNANIMOUS(ABSENT d r��) I hereby certify that this is a true and correct copy of an action AYES: NOES: taken and entered on the minutes of the Board of Supervisors on ABSENT: ABSTAIN: the date shown. KE:kg �� G:\Const\BO\2008\1-22-08 Acceptance Pacifica Avenue Improvements.doc ATTESTED: �/a7^l ��Y Orig.Div:Public Works Construction Division JOHN CULLEN,Clerk of the 1366 of Supervisors and County Contact: Kevin Emigh(925/313-2233) Administrator c: L.Costa,Design J.Dowling,Construction C.Raynolds/P.Denison,Accounting MCK Services,Inc. By Deputy Western Surety Company Recording Requested By: Contra Costa County Public Works Dept. CONTRA COSTA Co Recorder Office Recording Requested By: STEPHEN L. WEIR, Clerk-Recorder Contra Costa County Public Works Dept. � C_ 2008-0013501—00 Construction Division,255 Glacier Drive,Martinez,CA 94553 Return to: Wednesday, JAN 23, 2008 10:07:50 PUBLIC WORKS DEPARTMENT FRE $0.00: : Tt 1 Pd $0.00 Nbr-0003974936 lrc/R9/1-2 THE BOARD OF SUPERVISORS OF CONTR, Adopted this Resolution on January 22, 2008 by the following vote: AYES: Gioia, Uilkema, Piepho, Bonilla, and Glover NOES: None ABSENT: None ABSTAIN: None RESOLUTION NO. 2008/,8 SUBJECT: In the Matter of Accepting and Giving Notice of Completion of Contract for the Pacifica Avenue Improvements project, Bay Point area (District V), Project No. 0662-6R4106-07 The Board of Supervisors of Contra Costa County RESOLVES that: The County of Contra Costa on May 22, 2007, contracted with W.R. Forde Associates, for constructing concrete curb/gutter, sidewalk, and curb ramps along both sides of Pacifica Avenue between Driftwood Drive and Warf Drive including installation of storm drains and inlets, asphalt concrete pavement, driveway conforms,base failure repair and bicycle lane striping and such other items or details in the Bay Point area, with Western Surety Company as surety, for work to be performed on the grounds of the County; and The Public Works Director reports that said work has been inspected and complies with the approved plans,special provisions and standard specifications and recommends its acceptance as complete as of January 8, 2008. Therefore, said work is ACCEPTED as complete on said date, and the Clerk shall file with the County Recorder a copy of this Resolution and Notice as a Notice of Completion for said contract. I hereby certify that this is a true and correct copy of an action taken and entered on the minutes of the Board of KE.kg Supervisors on the date shown. G:\Const\BO\2008\1-22-08 Acceptance Pacifica Avenue Improvements.doc Orig.Dept.:Public Works(Construction Division) RECORDING TO BE COMPLETED BY COB ATTESTED: d� c: Auditor JOHN CULLETvktlerk of the Bqofd of Supervisors and L.Costa.Design J.Dowling,Construction County Administrator M.Carlson,Traffic MCK Services,Inc. Fidelity and Deposit Company of Maryland By Deputy RESOLUTION NO. 200816-S