SUBJECT: Amendment No. 1 to an existing Consulting Services Agreement with Nolte Associates Inc.
(District III) (Road Funds)
SPECIFIC REQUEST(S)OR RECOMMENDATION(S)&BACKGROUND AND JUSTIFICATION
RECOMMENDED ACTION: APPROVE and AUTHORIZE the Public Works Director,or designee,to execute
Amendment No. I to an existing Consulting Services Agreement with Nolte Associates Inc. effective February 27,
2007,update Appendix B for the new wage rates for 2007,and to increase the payment limit by$1,235,000 to a new
payment limit of$1,335,000 in order to provide engineering services for the Vasco Road Safety Project,Brentwood
area.
FISCAL IMPACT: This contract amendment allows for an additional$1,235,000(100%Road Funds)above the
previously approved contract for $100,000. There is no impact to the General Fund.
Continued on Attachment:
® SIGNATURE:
[RECOMMENDATION OF COUNTY ADMINISTRATOR ❑ RECOMMENDATION OF ARD COMMITTEE
[APPROVE OTHER
SIGNATURE(S):
ACTION OF BO D ON �GLC�iT y 0&"O?APPROVED AS RECOMMENDED OTHER ❑
VOA OF SUPERVISORS
1/ UNANIMOUS(ABSENT �T>t� ) I hereby certify that this is a true and correct copy of an action
AYES: NOES: taken and entered on the minutes of the Board of Supervisors on
ABSENT: ABSTAIN: the date shown.
Contact: Mike Hollingsworth(313-2231)
ATTESTED:
MH:gh:kp JOHN CULLE , Ierk of the Board of Supervisors
G:\Design\BOARD ORDERS\2007\Nolte On-call I st Amendment BO.doc and County Adrninistrator
cc: E.Kuevor,CAO
Auditor-Controller By. Deputy
PW Accounting �
1
1
SUBJECT: Amendment No. 1 to the On-Call Consulting Services Agreement with Nolte Associates Inc.
(District III) (Road Funds)
DATE: February 27, 2007
PAGE: 2 of 2
REASONS FOR RECOMMENDATIONS AND BACKGROUND:
Public Works Department staff has been working with the Vasco Road Task Force in reviewing safety alternatives
to improve Vasco Road over the last several years. The task force was formed due to concern for the public's safety
while driving through the Vasco Road corridor. The Vasco Road Task Force developed a number of alternatives,
one being the concept of a median barrier on Vasco Road. The Public Works Department had previously contracted
with Nolte Associates Inc. (Nolte)for preliminary safety studies in support of the Vasco Road Task Force. Nolte's
report titled"Contra Costa County Vasco Road Safety Improvement Study"dated March 17,2005 describes various
alternatives for improving safety on Vasco Road.
Meanwhile,Public Works had also entered into a consulting services agreement with Nolte for design services and
specific engineering expertise in order to meet the design schedules for various County projects on an as needed
basis. Staff selected Nolte through the standard consultant selection process of requesting proposals, selecting the
top proposals for interviews,interviewing the top candidates,and then entering into an agreement. Considering the
fact that Nolte has good knowledge of Vasco Road's existing design through the work on the preliminary studies for
the Vasco Road Task Force and that it is important to move forward as quickly as possible, the Public Works
Department is recommending that Nolte perform the design work under their existing consulting services agreement.
The existing consulting services agreement with Nolte was established in July of 2006. As a part of this amendment
we are also updated the rate schedule(Appendix B of the contract)to reflect current 2007 rates. We are also adding
a provision in the amendment to the agreement that allows subsequent updates of hourly rates on a once-annual basis
in the event that this project extends into 2008.
CONSEQUENCES OF NEGATIVE ACTION:
If the amendment is not approved, the design of the Vasco Road Safety Project will be delayed.
AMENDMENT No. 1
ON-CALL CONSULTING SERVICES AGREEMENT
NOLTE ASSOCIATES, INC.
1. Parties:
Effective on February 27, 2007, the County of Contra Costa, a political subdivision of the State of
California, hereinafter referred to as "Public Agency," and Nolte Associates Inc., hereinafter
referred to as "Consultant," mutually agree and promise as follows:
A. To increase contract payment limits by $1,235,000.
$1,235,000 for the Vasco Road Safety Project, Phase I
2. Purpose:
The parties desire to amend the agreement they entered into effective July 11, 2006 entitled "On-
Call Civil Engineering Consulting Services Agreement," hereinafter referred to as the
"Agreement." The Agreement is to provide design services, engineering analysis and
recommendations on an on-call basis for Public Works Design staff. This amendment is
necessary to reimburse the Consultant for expected work beyond the original limits of the existing
on-call consulting services agreement.
3. Amendment(s) to Agreement:
Amend Section 1(e):
Agreement Payment Limits to $1,335,000:
Design Support Payment Limits to $1,235,000 (Vasco Road Safety Project)
Amend Section 8: Allowing Appendix B (wage rates) to be adjusted by Consultant once annually
in September (for next fiscal year) to reflect staff rate adjustments to .individual
compensation. Such changes shall be equal to consultant's actual changes in
hourly rates. Consultant shall provide Public Agency with at least 30 days advanced
written notice of the changes.
Amend Appendix B: New Wage Rate Schedule for 2007 (attached and valid until Sept: 27, 2007)
4. Remaining Provisions:
Except for the changes made by this Amendment, all provisions of the Agreement shall remain in
full force and effect.
5. Signatures:
These signatures attest the parties' agreement to this Amendment.
PUBLIC AGENCY CONSULTANT
By: ZBy:
Maurice M. S iu (Designate official capacity in the bu iness)
Public Works Director
By: By: a4 Q,&
(De gnate official c acity in the
business) �-
.Note to Consultant: For corporations, the contract must be signed by two officers. The first signature
must be that of the chairman of the board, president or vice-president; the second signature must be that
of the secretary, assistant secretary, chief financial officer or assistant treasure. (Civ. Code, Sec. 1190
and Corps. Code, Sec. 313). The acknowledgement below must be signed by a Notary Public.
CERTIFICATE OF ACKNOWLEDGEMENT
State of California, )
)ss.
County of Sr, )
On this date written below, before me, the undersigned Notary Public, personally appeared the person(s)
signing above for Consultant, personally known to me (or proved to me on the basis of satisfactory
evidence) to be the person(s) whose name(s) is/are subscribed to the within instrument and
acknowledged to me that he/she/they executed the same in his/her/their authorized capacity(ies), and
that by his/her/their signature(s) on the instrument the person(s) or the entity upon behalf of which the
person(s) acted, executed the instrument.
Witness my hand and official seal.
Dated: 219 10M_+ RICK GARCES e
Comm # 1632575 ttrny
NOTARY PUBLIC.CALIFORNIA Ut
[Notary's Seal] SACRAMENTO COUNTY
OMY Comm.EXP.DEC.22,2009
NOTARY PUBLIC .
APPROVED AS TO FORM:
SILVANO B. MARCHESI
County Counsel
GADesignSOARD ORDERS\2007\Nolte On-Call 1st Amendment.doc
V NOLTE ASSOCIATES, INC.
Exhibit B
Northern California
2007 Prevailing Wage Charge Rates Schedule
Office:
Technical Services
Engineering Aide/Planning Aide................................................................................................. $66.00/hour
ProjectAssistant............................................................................................................................. $90.00/hour
Project Administrator.............................................................................:.................................... $113.00/hour
CADD Technician I.............................................:.........................................................I............... $99.00/hour
CADD Technician I1................................................................................................................... $122.00/hour
CADD Technician III................................................................................................................. $129.00/hour
Senior CADD Technician/Designer........................................................................................ $136.00/hour
Design Supervisor........................................................................................................................ $160.00/hour
Professional
Junior Engineer/Planner/Surveyor..................................................:........................................ $113.00/hour
Assistant Engineer/Planner/Surveyor...................................................................................... $132.00/hour
Associate Engineer/Planner/Surveyor................................ $ /
..................................................... 155.00 hour
Senior Engineer/Planner/Surveyor.......................................................................................... $166.00/hour
Manager.......................................................................................................................................... $187.00/hour
Structural Engineer.............................:......................................................................................... $198.00/hour
Associate........................................................................................................................................ $208.00/hour
Principal......................................................................................................................................... $240.00/hour
Field:
Construction Management
Junior Field Engineer................................................................................................................... $126.00/hour
Assistant Field Engineer.............................................................................................................. $142.00/hour
Associate Field Engineer............................................................................................................. $167.00/hour
Senior Field Engineer.................................................................................................................... $192.00/hour
Construction Manager................................................................................................................. $196.00/hour
Surveying
1-Person Survey Crew(GPS) (Robotic)................................................................................... $192.00/hour
1-Person Survey Crew................................................................................................................. $154.00/hour
2-Person Survey Crew................................................................................................................. $266.00/hour
3-Person Survey Crew.................................................................................................................. $378.00/hour
SurveyManager............................................................................................................................. $215.00/hour
Expenses:
Plotting and In-house Reproduction...........................................................
....................................1..15 xCost
Subsistence..........................................................................................................................................1.15 x Cost
Other Expenses-Including Subconsultants &Purchased Services through Subcontracts...1.15 x Cost
Mileage- Outside local area............................................................................................Per accepted IRS rate
Rates are effective through September 27,2007. If contract assignment extends beyond that date,a
new rate schedule will be added to the contract.Litigation support will be billed at$300.00 per hour.
Rates based on "Prevailing.Wage" (PW) for Construction Management and Surveying will be
determined by Project and County per California law.
Effective 9/29/06 G:\Clonts\Contracts\Attachments\2007_NorCal_PW_exB.doc