Loading...
HomeMy WebLinkAboutMINUTES - 11142006 - C.31 I \ Q, . TO: BOARD OF SUPERVISORS, AS GOVERNING Contra BOARD OF THE FLOOD CONTROL& WATER CONSERVATION DISTRICT - is Costa ~' FROM: MAURICE M. SHIU, CHIEF ENGINEER °o�••... --. County -'���' STA covK� DATE: November 14, 2006 SUBJECT: Accepting and Giving Notice of Completion of Contract for the San Ramon Creek Bank Restoration at Fostoria Way Project. Danville area. (District III) Project No. 7520-6139317-04 SPECIFIC REQUEST(S)OR RECOMMENDATION(S)&BACKGROUND AND JUSTIFICATION RECOMMENDED ACTION:,? ADOPT Resolution No. 2006/*** accepting as complete the contracted work performed by Hess Concrete Construction Company,Inc., for the San Ramon Creek Bank Restoration at Fostoria Way Project, as recommended by the Chief Engineer, Flood Control and Water Conservation Districts, Danville area. (Flood Control Zone 3B Funding) (District III) FISCAL IMPACT: Project was funded by 100% Flood Control Zone 3B Funds. REASONS FOR RECOMMENDATIONS AND BACKGROUND: The Chief Engineer reports that said work has been inspected and complies with the approved plans, special provisions and standard specifications and recommends its acceptance as complete as of October 12, 2006. CONSEQUENCES OF NEGATIVE ACTION: Contractor will not be paid and acceptance notification will not be recorded. Continued on Attachment: ❑ SIGNATURE: RECOMMENDATION OF COUNTY ADMINISTRATOR ❑ RECOMMENDATION OF BOARD COMMITTEE [APPROVE OTHER SIGNATURE(S).- ACTION OF BD ON IMWG +6`y�f"� �"�LI hereby certify that this is a true and correct copy of an action APPROVED A ECOMMENDED OTHER ❑ taken and entered on the minutes of the Board of Supervisors on the date shown. T OF SUPERVISORS UNANIMOUS(ABSENT ) ATTESTED: AYES: NOES: JOHN CULLEN, Clerk of the Board of Supervisors and County ABSENT: ABSTAIN: Administrator G:\Const\BO\2006\11-14-06 San Ramon Creek Completion.doc Orig.Div:Public Works(Construction Division) By Deputy Contact: Mike Carlson(313-2321) cc: J.Dowling,Construction C.Raynolds/P.Denison,Accounting Hess Concrete Construction Company,Inc. Travelers Casualty and Surety Company of America �II 1 Recording Requested By: — '"— &-vJvu--03670 0_00 Contra Costa County Public Works Dept. Wednesday, NOV 15, 2006 14:00:23 Construction Division FRE $0.00 255 Glacier Drive Til Pd $@,@@ Nbr-0003488528 Martinez,CA 94553 1 rc/R9I1-2 Return to: PUBLIC WORKS DEPARTMENT THE BOARD OF SUPERVISORS OF CONTRA COSTA COUNTY, CALIFORNIA AS THE GOVERNING BOARD OF THE FLOOD CONTROL & WATER CONSERVATION DISTRICT Adopted this Resolution on November 14, 2006 by the following vote: AYES: SUPERVISORS UILKEMA, PIEPHO, GLOVER, AND GIOIA NOES: NONE ABSENT;SUPERVISOR DESAULNIER RESOLUTION NO. 2006/" Z SUBJECT: In the Matter of Accepting and Giving Notice of Completion of Contract for the San Ramon Creek Bank Restoration at Fostoria Way Project. Danville area. (District 1H)Project No. 7520-6B9317-04 The Board of Supervisors of Contra Costa County RESOLVES that: The County of Contra Costa on July 12,2006 contracted with Hess Concrete Construction Company, Inc. for restoration of the creek banks with channel excavation material and imported borrow. The toe of the west bank was armored with rock slope protection and willow cuttings (brush layering) with Travelers Casualty and Surety Company of America as surety,for work to be performed on the grounds of the County; and The Chief Engineer reports that said work has been inspected and complies with the approved plans, special provisions and standard specifications and recommends it acceptance as complete as of October 12, 2006. Therefore, said work is ACCEPTED as complete on said date, and the Clerk shall file with the County Recorder a copy of this Resolution and Notice as a Notice of Completion for said contract. I hereby certify that this is a true and correct copy of an action taken and entered on the minutes of the Board of MC:jd:ab: Supervisors on the date shown. G:\Const\BO\2006\11-14-06 San Ramon Creek Completion.doc Orig.Dept.:Public Works(Construction Division) RECORDING TO BE COMPLETED BY COB ATTESTED: cc: Auditor J.Dowling,Construciton JOHN CULLEN, Clerk of the Board of Supervisors and S.Kowalewski,Traffic County Administrator Hess Concrete Construction Company,Inc.. Travelers Casualty and Surety Company of America By Deputy RESOLUTION NO. 2006/ �� 2.