Loading...
HomeMy WebLinkAboutMINUTES - 11142006 - C.132 I I CONTRA TO: BOARD OF SUPERVISORS I FROM: MICHAEL J. LANGO, DIRECTOR OF GENERAL SERVICES �,- � � �o COSTA DATE: NOVEMBER 14, 2006 COUNTY IrA coux'�' , I `1 SUBJECT: AWARD OF RE-BID TRADE CONTRACT FOR SITEWORK AND REINFORCED CONCRETE FOR THE PUBLIC WORKS EXPANSION PROJECT, 255 GLACIER DRIVE, MARTINEZ (WH261 B) I SPECIFIC REQUEST(S)OR RECOMMENDATION(S)&BACKGRO i ND AND JUSTIFICATION I RECOMMENDATION 1. AWARD a contract in the amount of$784,800 to Jos. J. Albanese, Inc., Santa Clara, the apparent lowest responsive and responsible bidder for the trade contract that includes sitework and reinforced concrete for the subject project (Base Bid Package 1), contingent upon compliance with the County's Outreach Program, Post-Bid Assessment, and Project Labor Agreement requirements; WAIVE any minor irregularities in the bid; and AUTHORIZE the General Services Director, or designee, to execute the contract upon verification of compliance with the above requirements. 2. AUTHORIZE the General Services Director, or designee, to exonerate any bid bonds posted by the bidders and return any checks or cash submitted for security, after execution of the contract. 3. AUTHORIZE the General Services Director, or designee, to sign any escrow agreements prepared for this project to permit the direct payment of retentions into escrow or the substitution of securities for moneys withheld by the County to ensure performance under the contract, pursuant to Public Contract Code Section 22300. I i 4. AUTHORIZE the General Services Director, or designee, to order changes or additions to the contract work pursuant to Public Contract Code Section 20142. 1 5. DELEGATE, pursuant to Public Contract Code Section 4114, the Board's functions under Public Contract Code Sections 4107 and 4110, with regards to subletting and subcontracting, to the General Services Director, or designee. 6. DECLARE that, should the contracts award be invalidated for any reason, the Board would not in any event have awarded the contract to any other bidder, but instead would have exercised its discretion to reject all of the bids received. Nothing herein shall prevent the Board from re-awarding a contract to another bidder in cases where the successful bidder establishes a mistake, refuses to sign the contract or fails to furnish required bonds or insurance in accordance with Public Contract Code Sections 5100- 5107. I CONTINUED ON ATTACHMENT: X YES SIGNATURE: i RECOMMENDATION OF COUNTY ADMINISTRATOR RECOMMENDATION OF BOARD COMMITTEE APPROVE ' OTHER SIGNATURE(S): ACTION OF BOARD ON ��.,,(())/ J"0 APPROVED AS RECOMMENDED OTHER I I I I I I I I I I VOTE OF SUPERVISORS UNANIMOUS(ABSENT \� AYES: S: ABSENTS: ABSTAIN: II I ;I MEDIA CONTACT: MICHAEL J. LANGO(313-7100) Originating Dept.:General Services Department cc: General Services Department I HEREBY CERTIFY THAT THIS IS A TRUE Capital Projects Management Division AND CORRECT COPY OF AN ACTION TAKEN AccountingAND ENTERED ON THE MINUTES OF THE BOARD I OF SUPERVI ORS ON THE DA E SHOWN. CPM File: 250-0517/C.1.1 250-0517/A.5 ATTESTED County Administrator's Office I j6 11CULLEN,CLERK OF THE BOAR OF SUPERV SOBS County Counsel I AND COUNTY ADMINISTRATOR Auditor Controller Public Works Department(via CPM) I BY 12 gwP_l ,DEPUTY II' I H:\2005\2500517\05L017236brev2.doc RL:tb i Page 1 of 2 M382(10/88) I I AWARD OF RE-BID CONSTRUCTION CONTRACTS FOR November 14, 2006 THE PUBLIC WORKS EXPANSION PROJECT, 255 GLACIER DRIVE, MARTINEZ (WH261 B;) I FINANCIAL IMPACT I I The project will be funded with $1.5 million from the Public Works Department and the remaining funds will come from a future bond issuance. I I BACKGROUND I I The project involves constructing an approximately 12,100-square foot building adjacent to the Public Works Department's current facility at 255 Glacier Drive in Martinez. The new building will address current overcrowding and integrate staff currently located in three nearby modular buildings and an off-site office. The County's childcare facility, which is also located in a nearby modular building, will be included in the new building. I The "Construction Manager At-Risk" ("CM At-Risk") project delivery method is being utilized on the project. Typically, the CM At-Risk method provides improved cost control, better allocates risk, and enhances project collaboration. On January 10, 2006, the Board approved a consulting services agreement with Swinerton Builders ("Swinerton") to provide construction management services for the project. With the CM At-Risk project delivery method, numerous trade Iscopes of work were developed (e.g., earthwork, concrete, site utilities, framing, mechanical, and electrical) and incorporated into the bid documents. I The project plans and specifications were previously filed with and approved by the Board of Supervisors, and bids were duly invited from the various trades involved in the project. Bids were originally received and opened by the County Capital Projects Management Division on September 14, 2006. Subsequently, on October 10 and October 24, the Board took action to reject all bids for the trade contracts that include earthwork, plumbing, cast-in-place concrete, and rebar. The trade contracts for these scopes of work were re-bid, and the following bids for Bid Package 1 were received and opened on November 9, 2006: TRADE CONTRACT SCOPE OF WORK Bidder Bid Amount (Summary Description)I 02225, 02300, 02741, 02935, 03100, 03200, 03300, 03360, 03401, 07260 - Sitework demo, earthwork, ac paving, rebar, cast-in-place concrete Jos. J. Albanese, Inc. $ 7849800 j Evans Brothers $ 1,283,255 I In order to maintain project progress, staff�recommends awarding to Jos. J. Albanese, Inc., the apparent lowest responsive and responsible bidder, the trade contract that includes sitework and reinforced concrete (Base Bid Package 1). The award is contingent .1 upon compliance with the County's Outreach Program, Post-Bid Assessment, and Project Labor Agreement requirements. Upon verifying that the above requirements have been complied with, the General Servicesi Director, or designee, would sign the contract. I The general prevailing rates of wages, which shall be the minimum rates paid on this project, are on file with the Clerk of the Board, and copies are available to any party upon request. I I I I I i I I I I I I I I I I H:\2005\2500517\05L017236brev2.doc Page 2 of 2 M382(10/88) I