HomeMy WebLinkAboutMINUTES - 10242006 - C.51 TO''- BOARD OF SUPERVISORS = CONTRA
FROM: MICHAEL J. LANGO, DIRECTOR OF GENERAL SERVICES COSTA
DATE: OCTOBER 24, 2006 COUNTY
sra'co'uK
SUBJECT: APPROVE AND AUTHORIZE A CONSULTING SERVICES AGREEMENT WITH RMW
ARCHITECTURE & INTERIORS TO PROVIDE ARCHITECTURAL/ENGINEERING .�
SERVICES FOR THE REMODEL AND NEW SYSTEM FURNITURE WORKSTATIONS
PROJECT AT 151 LINUS PAULING DRIVE, HERCULES FOR THE EMPLOYMENT AND
HUMAN SERVICES DEPARTMENT
SPECIFIC REQUEST(S)OR RECOMMENDATION(S)&BACKGROUND AND JUSTIFICATION
RECOMMENDATION
1. APPROVE a Consulting Services Agreement dated October 24, 2006 through July 30, 2008
with RMW Architecture & Interiors (RMW) in the amount of $222,850 to provide
architectural/engineering services for the remodel and new systems furniture workstations
project at 151 Linus Pauling Drive, Hercules.
2. AUTHORIZE the Director of General Services, or designee, to execute the agreement and to
issue written authorizations for extra work provided that the cumulative total extra cost for all
such authorizations shall not exceed $20,000.
FINANCIAL IMPACT
Funding for the Consulting Services Agreement is budgeted in the Plant Acquisition budget (4423-
4370).
BACKGROUND
The Employment and Human Services Department (EHS) is required to move its Staff Development
Unit out of a leased office space at 1465 Enea Circle in Concord by April 1, 2007. The property
owner intends to demolish the office building and construct a new condominium complex. EHS
intends to move its Staff Development Unit, a 16,000 square foot operation, to a County-owned office
building at 151 Linus Pauling Drive in Hercules.
RMW was initially contracted to program, plan, and prepare construction documents for a project that
only involved the relocation of the Staff Development Unit to the second floor at 151 Linus Pauling.
These services are being performed under an existing as-needed consulting services agreement.
Because the Staff Development relocation project would affect other spaces at 151 Linus Pauling,
EHS requested that other areas within the building be remodeled resulting in a 31,000 square foot
remodeling project instead of the original 16,000 square foot project. The building is occupied and
will remain in operation during construction and it is anticipated that the work will be completed in
three phases. Although the project becomes more complex, the larger scale project will provide for
more efficient floor plans and will better accommodate staff already in the building in addition to the
incoming staff.
CONTINUED ON ATTACHMENT: YES SIGNATURE: /
COMMENDATION OF COUNTY ADMINISTRATOR RECOMMENDATION OF BOARD COMMITTEE
APPROVE OTHER
SIGNATURES
ACTION OF BO R ON APPROVED AS RECOMMENDEDOTHER
VOTE OF SUPERVISORS
&NANIMOUS(ABSENT2 )
AYES: NOES:
ABSENTS: ABSTAIN: -
MEDIA CONTACT: MICHAEL J.LANGO(313-7100)
Originating Dept.:General Services Department
I HEREBY CERTIFY THAT THIS ISA TRUE
cc: General Services Department
AND CORRECT COPY OF N ACTION TAKEN
Capital Projects Management Division AND ENTERED ON THE MINUTES OF THE BOARD
Accounting OF SUPERVIS RS ON THE DATE S 1QW
CPM File: 120-0601/A.1.1
120-0601/A.5 ATTESTED ���///(.-�
County Administrator's Office JOHN CULLEN,CLERK OF THE ARD OF SUPERVISORS
County Counsel A D COUNTY ADMINISTRATOR
Auditor Controller
Employment&Human Services Department(via CPM) BY l DEPUTY
RMW Architecture&Interiors(via CPM)
H:\2006\1200601\06E001002brev4.doc RL:tb Page 1 of 2 M382(10/88)
A.pPROVE AND AUTHORIZE A CONSULTING SERVICES October 24, 2006
AGREEMENT WITH RMW ARCHITECTURE & INTERIORS
TO PROVIDE ARCHITECTURAL/ENGINEERING SERVICES
FOR THE REMODEL AND NEW SYSTEM FURNITURE
WORKSTATIONS PROJECT AT 151 LINUS PAULING
DRIVE, HERCULES FOR THE EMPLOYMENT AND HUMAN
SERVICES DEPARTMENT
In addition to the expanded scope of the project, during project development, EHS informed General
Services that EHS staff needed to vacate 1465 Enea Circle three months sooner than originally
scheduled. In order to meet the new earlier move-out date, RMW was requested to accelerate the
preparation of a separate set of construction documents for the Staff Development area remodel.
The construction documents for the remaining areas will follow.
In summary, the project scope was expanded and a portion of the project was accelerated resulting in
necessary additional services and fee for RMW. Because RMW's existing as-needed consultant
services agreement has reached its maximum dollar amount, a new project-specific agreement is
recommended to cover the additional work.
F
HA2006\1200601\06E001002brev4.doc Page 2 of 2 M382(10/88)