HomeMy WebLinkAboutMINUTES - 12122006 - C.2 TO: BOARD OF SUPERVISORS °� Contra
FROM: MAURICE M. SHIU, PUBLIC WORKS DIRECTOR Costa
DATE: December 12, 2006 °Sr;�a N County
SUBJECT: Amendment No 6 to the Consulting Services Agreement with Nolte Associates Inc.
Project Nos.: 6X4472, 6X4482, 6X4492 (State Route 4 Bypass project, Segment 3) (District 3)
(State Route 4 Bypass Funds)
SPECIFIC REQUEST(S)OR RECOMMENDATION(S)&BACKGROUND AND JUSTIFICATION
RECOMMENDED ACTION: APPROVE and AUTHORIZE the Public Works Director,or designee,to execute
Amendment No. 6 to the Consulting Services Agreement with Nolte Associates Inc.effective December 12,2006 to
extend the contract to December 31,2008,update Appendix B for the new wage rates for 2007,and to increase the
payment limit by $100,000 to a new payment limit of$1,224,550 to provide continuing engineering services,
engineering analysis for the State Route 4 Bypass project, Segment 3, Brentwood area.
FISCAL IMPACT: This contract amendment allows for an additional $100,000 (100% State Route 4 Bypass
Funds) above the previously amended contract for $1,124,550. The State Route 4 Bypass, Segment 3 portion is
funded by the State Route 4 Bypass Authority, There is no impact to the General Fund or the Local Road Funds.
Continued on Attachment: ® SIGNATURE:
[RECOMMENDATION OF COUNTY ADMINISTRATOR ❑ RECOMMENDAT OF BOARD COMMITTEE
Q--A-PPROVE OTHER
Ql'.-�-
SIGNATURE(S):
ACTION OF BO OND 1fJ'G1,"ia, d4-0 4 APPROVED AS RECOMMENDED OTHER ❑
VOTEpF SUPERVISORS
Unanimous(Absent ) I hereby certify that this is a true and correct copy of an action
Ayes: Noes: taken and entered on the minutes of the Board of Supervisors on
Absent: Abstain: the date shown.
Vacant: District IV
Contact: Mike Hollingsworth(313.2231)
MH:gh:kp -- - G(iG Y.�j�G�/ �Y �
G:\Design\BOARD ORDERS\2006\Nolte SR4BP 6th amend BO.doc ATTESTED: �i e�.ae�c
JOHN CULLEN,Clerk of the Board of Supervisors and County
Orig.Div: Public Works(Design Division) Administrator
Contact: Gary Huisingh(313-2257)
cc: E.Kuevor,CAO
Auditor-Controller
PW Accounting By 7 ,Deputy
SUBJECT: Amendment No. 6 to the Consulting Services Agreement with Nolte Associates Inc.
Project Nos.: 6X4472, 6X4482, 6X4492 (State Route 4 Bypass project, Segment 3) (District 3)
(State Route 4 Bypass Funds)
DATE: December 12, 2006
PAGE: 2 of 2
REASONS FOR RECOMMENDATIONS AND BACKGROUND:
State Route 4 Bypass, Segment 3:
County Public Works Design staff has brought the project to the final level of design and the project has been
awarded to a contractor by the SR4BP Authority and is currently under construction. Under this original contract,
Nolte's staff has been augmenting Public Works staff by providing specific expertise and help,in order to meet the
design schedule. This amendment will allow Nolte to provide continued support during the construction process
over the next 2 years to further augment Public Works staff on an as needed basis.
CONSEQUENCES OF NEGATIVE ACTION:
If the amendment is not approved, Public Works staff will not have the on-call assistance from Nolte during the
construction of the project.
..
AMENDMENT No. 6
CONSULTING SERVICES AGREEMENT
PROJECT NAME: State Route 4 Bypass Project, Segment 3
Project Nos.: 6X4472, 6X4482, 6X4492
1. Parties:
Effective on December 12, 2006,the County of Contra Costa,a political subdivision of the State of
California, hereinafter referred to as "Public Agency," and Nolte Associates Inc., hereinafter
referred to as "Consultant," mutually agree and promise as follows:
A. To increase contract payment limits by$100,000.
$100,000 for the State Route 4 Bypass Project, Segment 3
2. Purpose:
The parties desire to amend the agreement they entered into effective December 9, 2003, and
amended January 20th and May 40", 2004, January 11'h 2005, and November 15, 2005 entitled
"Consulting Services Agreement,"hereinafter referred to as the"Agreement." The Agreement is
to provide design services, engineering analysis and recommendations for the State Route 4
Bypass Project, Segment 3 in the Brentwood area.This amendment is necessary to reimburse the
Consultant for additional work beyond the original scope of work.
3. Amendment(s) to Agreement:
Amend Section 1(e):
Agreement Payment Limits to $1,224,550:
Design Support Payment Limits to $476,000 (State Route 4 Bypass funds)
Drainage / Hydrology/Hydraulics Design Payment Limits to $493,550, including
contingency (State Route 4 Bypass funds)
Amend Section 1(f): Extend completion date to 12/31/08
Amend Section B:,Allowing Appendix B to be updated once annually for the duration of the
contract .
Amend Appendix B: New Wage Rate Schedule for 2007 (attached)
4. Remaining Provisions:
Except for the changes made by this Amendment, all provisions of the Agreement shall remain in
full force and effect.
5. Signatures:
These signatures attest the parties' agreement to this Amendment.
PUBLIC AGENCY CONSULTANT
By: l By: �'� V icl;"YRr',
M nce M. Shiu ( signs a ofri acity in the business)
Public Works Director
By: By: k Ldo_ ,_,Assj ,Se r .
(De gnate officiatthpacity in the
busi ess)
Note to Consultant: For corporations, the contract must be signed by two officers. The first signature
must be that of the chairman of the board, president or vice-president;the second signature must be that
of the secretary, assistant secretary, chief financial officer or assistant treasure. (Civ. Code, Sec. 1190
and Corps. Code,Sec. 313). The acknowledgement below must be signed by a Notary Public.
CERTIFICATE OF ACKNOWLEDGEMENT
State of California, )
County of )
On this date written below, before me,the undersigned Notary Public,personally appeared the person(s)
signing above for Consultant, personally known to me (or proved to me on the basis of satisfactory
evidence) to be the person(s) whose name(s) is/are subscribed to the within instrument and
acknowledged to me that he/she/they executed the same in his/her/their authorized capacity(ies), and
that by his/her/their signature(s) on the instrument the person(s) or the entitv upon behalf of which the
person(s) acted, executed the instrument. =TCAWO
'Witness my hand and official seal. Sacr
2006 m
Dated: II L.�4 0
[Notary's Seal]
NOTARY PUBLIC
APPROVED AS TO FORM:
SILVANO B. MARCHESI
County Counsel
GADesign%SOARD ORDERS�2006Wolte SR4BP 6th amend.doc
NoLTE J4SSOCiATES, INC.
Northern California
2007 Prevailing Wage Charge Elates Schedule
Office:
Technical Services
Engineering Aide/Planning Aide.......................... . $66.00/hour
...............:......................................................
ProjectAssistant.............................................................................................................................. $90.00/hour
Project Adnvnistrator......................................... $113.00/hour
.........................................................................
CARDTechnician I....................................................................................................................... $99.00/hour
CADD Technician II................................................................................................................... $122.00/hour
CADDTechnician III.................................................................................................................. $129.00/hour
Senior CADD Technician/Designer......................................................................................... $136.00/hour
DesignSupervisor......................................................................................................................... $160.00/hour
Professional =
Junior Engineer/Planner/Surveyor........................................................................................... $113.00/hour
Assistant Engineer/Planner/Surveyor.....................................__........................................_... $132.00/hour
Associate Engineer/Planner/Surveyor..................................................................................... $155.00/hour
Senior Engineer/Planner/Surveyor........................................................................................... $166.00/hour
Manager.......................................................................................................................................... $187.00/hour
Structural Engineer....................................................................................................................... $198.00/hour
Associate......................................................................................................................................... $208.00/hour
Principal.......................................................................................................................................... $240.00/hour
Field:
Construction Management
Junior Field Engineer................................................................................................................... $126.00/hour
Assistant Field Engineer........................................................................................I..................... $142.00/hour
Associate Field Engineer............................................................................................................. $167.00/hour
Senior Field Engineer................................................................................................................... $192.00/hour
Construction Manager............................. ........................................... .......- $196.00/hour
Surveying
1-Person Survey Crew(GPS) (Robotic)............................................................................:....... $192.00/hour
1-Person Survey Crew.................................................................................................................. $154.00/hour
2-Person Survey Crew.................................................................................................................. $266.00/hour
3-Person Survey Crew............................................:..................................................................... $378.00/hour
SurveyManager............................................................................................................................. $215.00/hour
Expenses:
Plotting and In-house Reproduction..............................................................................................1.15 x Cost
Subsistence..........................................................................................................................................1.15 x Cost
Other Expenses- Including Subconsultants&Purchased Services through Subcontracts..1.15 x Cost
Mileage-Outside local area...........................................................................................Per accepted IRS rate
Rates are effective through September 27,2007. If contract assignment extends beyond that date,a
new rate schedule will be added to the contract Litigation support will be billed at$300.00 per hour.
Rates based on"Prevailing Wage" (PW) for Construction Management and Surveying will be
determined by Project and County per California law.
Effective 9/29/06 W:\Charge Rates Schedules\2007 Rates\2007_NorCa1_PW.doc