HomeMy WebLinkAboutMINUTES - 01182005 - C1 TO: BOARD OF SUPERVISORS Contra FROM: MACJJRICE M. SHIU, PUBLIC WORDS DIRECTOR ni Costa DATE: JANUARY 18, 2005 ` •--• County sra J SUBJECT: APPROVE Project Contingency Fund Increase and APPROVE and AUTHORIZE the Public Works Director, or designee, to execute Contract Change Order No. 3 for the Strentzel Lane Erosion and Sediment Reduction project, Martinez area, (District II). Project No. 7505-6F8476-03 SP771C REQUESTS)OR RECOMMENDATION(S)&BACKGROUND AND JUSTIFICATION RECOMMENDED ACTION: APPROVE Strentzel Lane Erosion and Sediment Reduction project contingency fund increase of$45,000.00 for a new total of$76,555.53 effective January 18,2005,and APPROVE and AUTHORIZE the Public Works Director, or designee,to execute Contract Change Order No.3 with W.R.Forde Associates,effective January 18,2005,in an amount not to exceed.$51,955.00 to a new payment limit of$391,250.80 for unforeseen extra Work. FISCAL IMPACT": The Project contingency funds are currently insufficient to cover the increased cost. The increase in contingency funds will be funded by the 40%Regional Water(duality Control Board,35%Count Road Funds,and 25%United States National Park Services. Continued on Attachment: SIGNATURE: WP OMMENDATION OF'COUNTY ADMINISTRATOR ❑ RECOMMENDATION OF BOARD COMMITTEE ROVE [ OTHER SIGNATURE(S): ACTION OF BOA)( JANUARY 18ON , 20105 APPROVED AS Rt OMMENDED® OTHER (� I hereby certify that this is a true and correct copy of an action VOTE OF SUPERVISORS taken and entered on the minutes of the Board of Supervisors on XX UNANIMOUS(ASSENT NONE_ ) the date shown. AYES:w NOES: ABSENT: ABSTAIN: PE ATTESTED: JANUARY 18, 200.5 G:\CrpData\Const\BOt2005\1-18-05 Strentzel bane-CO and Contingency.doc JOHN SWEETEN,Clerk of the Board of Supervisors and County Adrnini5tratar Orig.Div:Public Works(Construction Division) Contact: Mike Carlson(313-2321) cc: County Administrator Auditor-Controller By ,Deputy Public Works Design P.Edwards Contractor SUBJECT: APPROVE Project Contingency Fund Increase and APPROVE and AUTHORIZE the Pudic Works Director, or designee, to execute Contract Change Order No. 3 for the Strentzel Lane Erasion and Sediment Reduction project, Martinez area, (District II). Project No. 7505-6F8476-03 DATE: January 18, 2005 PAGE: 2 of 2 REASONS FOR RECOMMENDATIONS AND BACKGROUND: Additional funding is needed to pay the contractor for extra work that was not part of the original contract. The extra work consisted of shifting the alignment of the storm drain line to avoid a city water lime in Alhambra Valley Road. The original plans inaccurately located the storm drain line. Once work was begun within the roadway,the water line ruptured causing delays for the contractor. The storm drain was realigned to miss the water line,but this caused additional excavation, backfill and pavement for the contractor. This change order will compensate the contractor for this additional work. The additional work costs exceed the project contingency fund. Approval of the project contingency fund increase is required to compensate the contractor for the additional work. CONSEQUENCES OF NEGATIVE ACTION: The lack of approval would prevent successful completion of this contract and preclude payment to the contractor for required work.