Loading...
HomeMy WebLinkAboutMINUTES - 11302004 - C36 BOARD OF SUPERVISORS,AS GOVERNING ,.:6•'=.�L',•°� Contra TO: •„ BOARD OF THE BLACKHAWK GEOLOGICAL '\ +' l '» HAZARD ABATEMENT DISTRICT �� � - Costa 0• i ! FROM: MAURICE M. SHIU,PUBLIC WORKS DIRECTOR \IQs•-.____...--r"". rA c uK" County 0 DATE: November 3 0, 2004 • SUBJECT: APPROVE and RATIFY the decision of Kleinfelder,Inc.,as General Manager of Blackhawk Geologic Hazard Abatement District(GRAD)to award a landslide repair contract to Engineered Soil Repairs(ESR),Walnut Creek, California in the amount of$113,127,for the repair of landslide damage on the slope of the Blackhawk Plaza Parking Lot within the property of the Blackhawk Plaza,and AUTHORIZE Kleinfelder,Inc., as General Manager of the Blackhawk Geologic Hazard Abatement District(GRAD)to execute contract change orders as may be required up to 10%of the contract amount, Danville area. (District III) SPECIFIC REQUEST(S)OR RECOMMENDATION(S)&BACKGROUND AND JUSTIFICATION RECOMMENDED ACTION: APPROVE and RATIFY the decision of Kleinfelder,Inc.,as General Manager of Blackhawk Geologic Hazard Abatement District(GHAD) to award a landslide repair contract to Engineered Soil Repairs (ESR), Walnut Creek, California in the amount of$113,127, for the repair of landslide damage on the slope of the Blackhawk Plaza Parking Lot for the period September 1 6, 2004 through November 30, 2004 within the property of the Blackhawk Plaza, Danville area; and AUTHORIZE Kleinfelder, Inc., as General Manager of the Blackhawk Geologic Hazard Abatement District(GHAD)to execute contract change orders as may be required up to 10%of the contract amount. Continued on Attachment: ® SIGNATUR.E: .� RECOMMENDATION OF COUNTY ADMINISTRATOR [] RECOMMENDATION OF BOARD COMMITTEE D­�XPPROVE OTHER SIGNATURE(S): 0001, ACTION OF BON NOVFMER 30, 2004 9COMMENDED APPROVED A ® OTHER [� VOTE OF SUPERVISORS I hereby certify that this is a true and correct copy of an action xx UNANIMOUS(ABSENT NONE ) taken and entered on the minutes of the Board of Supervisors an AYES: NOES: ABSENT: ABSTAIN: the date shown. EW:cmm G:\CjMData\SpDist\Board Orders\.Blackhawk ATTESTED: NOVEMBER 30, 2004 GHAD BO 2004\11-30-04 Blackhawk GHAD BO.doc JOHN SWEETEN,Clerk of the Board of Supervisors and County Orig.Div:Public Works(Special Districts) Contact: Eric Whan(313-2242) Administrator cc: County Administrator Assessor Auditor-Controller By ,Deputy Community Development County Counsel David Edmonds,Special Districts SUBJECT: APPROVE and RATIFY the decision of Kleinfelder,Inc.,as General Manager of Blackhawk Geologic Hazard Abatement District(CHAD)to award a landslide repair contract to Engineered Soil Repairs(ESR),Walnut Creek,California in the amount of$113,127,for the repair of landslide damage on the slope of the Blackhawk Plaza Parking Lot within the property of the Blackhawk Plaza, and AUTHORIZE Kleinfelder,Inc.,as General Manager of the Blackhawk Geologic Hazard Abatement District(CHAD)to execute contract change orders as may be required up to 10%of the contract amount, Danville area.(District 111) DATE: November 3 0, 2004 PAGE: 2 of 2 FISCAL IMPACT: No impact on the County General Fund. The funding is one hundred percent (100%) Blackhawk CHAD. The proposed contract is consistent with the adopted FY 04/05 program budget. REASONS FOR RECOMMENDATIONS AND BACKGROUND: In April of 1998 the Keystone retaining wall supporting the slope below the Blackhawk Plaza parking lot failed.The failure was about 5 5 feet wide and extended about ten feet beyond the top of the slope displacing the concrete curb and several feet of the asphaltic concrete pavement.The failure occurred after weeks of unusually heavy rainfall.Kleinfelder was authorized to prepare a slide repair investigation, which was completed in October 1998. Because of the simultaneous occurrence of numerous other slides in the District the repair of the Plaza slide was postponed. The slope repair was included in the FY 2003/2004; however, due to project scope discussions with the Plaza Board of Directors the project was again delayed to FY 2004/2005.The slide area has grown each year and currently presents a safety hazard for cars parking at the top of the slope. Although,barricades and concrete wheel stops have been installed around the site vandals continue to remove the car wheel stops. CONSEQUENCES OF NEGATIVE ACTION: Without Board approval the CHAD will not be able to authorize the contract that has been let for the repair. The ongoing safety issue with regard to cars driving over the top of the failure area will worsen exposing the CHAD and the Plaza to liability.