Loading...
HomeMy WebLinkAboutMINUTES - 11022004 - C78 TO: BOARD OF SUPERVISORS FROM: MAURICE SHIU, PUBLIC WORKS DIRECTOR DATE: November 2, 2004 SUBJECT: CONTINUE the emergency action originally taken by the Board of Supervisors on August 17, 2004, regarding the repair of San Pablo Avenue Bridge at Rodeo Creek, Rodeo area, (100% Local Road Funds) (District II) Project No. 0672-6U2522 Specific Request(s) or Recommendation(s) & Background & Justification I. RECOMMENDED ACTION: Continue the emergency action taken by the Board of Supervisors on August 17, 2004, pursuant to Public Contract Cade Sections 22035 and 22050, to repair of the San Pablo Avenue Bridge at Rodeo Creek, as recommended by the Public Works Director, Rodeo area. Continued on Attachment: X SIGNATURE: RECOMMENDATION OF COUNTY ADMINISTRATOR —RECOMMENDATION OF BOARD COMMITTEE APPROVE OTHER SIGNATURE(S): ACTION OF BOARD QN II. r APPROVED AS RECOMMENDED_V/ OTH911 VOTE OF SUPERVISORS UNANIMOUS (ASSENT f" I'161 AYES: NOES: ABSENT ABSTAIN: I hereby certify that this is a true and correct RT:AK:kd copy of an action taken and entered on the G:Maint\KlmiB0\B011-2 Orig.Div: Public Works(Design Division) minutes of the Board of Supervisors on the Contact: R.Tavenier(313-7006) date Shown. cc: M.Hollingsworth,Design M.Carlson,Construction A.Knapp,Maintenance a ATTESTED: �>��'� t'i ,iFt.m John Sweeten, Clerk of the Board of Supervisors and County Administrator B Deputy SUBJECT: CONTINUE the emergency action originally taken by the Board of Supervisors on August 17, 2004, regarding the repair of San Pablo Avenue Bridge at Rodeo Creek, Rodeo area. (100% Local Road Funds) (District il) Project No. 0072-602522 DATE: November 2, 2004 PAGE: 2 11. FINANCIAL IMPACT: Total Work Order is $71,000. Low bid contract cost is $39,329. Project will be funded by 100% Local Road Funds. III. REASONS FOR RECOMMENDATIONIBACKGROUND: A. On August 17, 2004, the Board of Supervisors declared an emergency and authorized the Public Works director to proceed with the most expeditious manner to repair the San Pablo Avenue Bridge at Rodeo Creek, Rodeo area. B. Repair status: 1. Public Works has awarded the project to the low bidder, E.E. Gilbert Construction. 2. Construction began on September 27, 2004. The contractor formed and poured the concrete encasement around existing bent cap. The contractor will next be removing the form work. IV. CONSEQUENCES OF NEGATIVE ACTION: Non-concurrence of the above recommendation will delay repair of the bridge structure until 2005, which could cause the structure to continue to degrade. Continued degradation could result in further increased repair costs and possible loss to portions of the bridge.