HomeMy WebLinkAboutMINUTES - 11022004 - C78 TO: BOARD OF SUPERVISORS
FROM: MAURICE SHIU, PUBLIC WORKS DIRECTOR
DATE: November 2, 2004
SUBJECT: CONTINUE the emergency action originally taken by the Board of Supervisors on
August 17, 2004, regarding the repair of San Pablo Avenue Bridge at Rodeo Creek,
Rodeo area, (100% Local Road Funds) (District II) Project No. 0672-6U2522
Specific Request(s) or Recommendation(s) & Background & Justification
I. RECOMMENDED ACTION:
Continue the emergency action taken by the Board of Supervisors on August 17, 2004,
pursuant to Public Contract Cade Sections 22035 and 22050, to repair of the San Pablo
Avenue Bridge at Rodeo Creek, as recommended by the Public Works Director, Rodeo
area.
Continued on Attachment: X SIGNATURE:
RECOMMENDATION OF COUNTY ADMINISTRATOR
—RECOMMENDATION OF BOARD COMMITTEE
APPROVE OTHER
SIGNATURE(S):
ACTION OF BOARD QN II. r APPROVED AS
RECOMMENDED_V/ OTH911
VOTE OF SUPERVISORS
UNANIMOUS (ASSENT f" I'161
AYES: NOES:
ABSENT ABSTAIN:
I hereby certify that this is a true and correct
RT:AK:kd copy of an action taken and entered on the
G:Maint\KlmiB0\B011-2
Orig.Div: Public Works(Design Division) minutes of the Board of Supervisors on the
Contact: R.Tavenier(313-7006) date Shown.
cc: M.Hollingsworth,Design
M.Carlson,Construction
A.Knapp,Maintenance
a
ATTESTED: �>��'� t'i ,iFt.m
John Sweeten, Clerk of the Board of
Supervisors and County Administrator
B
Deputy
SUBJECT: CONTINUE the emergency action originally taken by the Board of Supervisors on August
17, 2004, regarding the repair of San Pablo Avenue Bridge at Rodeo Creek, Rodeo area.
(100% Local Road Funds) (District il) Project No. 0072-602522
DATE: November 2, 2004
PAGE: 2
11. FINANCIAL IMPACT:
Total Work Order is $71,000. Low bid contract cost is $39,329. Project will be funded by 100%
Local Road Funds.
III. REASONS FOR RECOMMENDATIONIBACKGROUND:
A. On August 17, 2004, the Board of Supervisors declared an emergency and authorized the
Public Works director to proceed with the most expeditious manner to repair the San Pablo
Avenue Bridge at Rodeo Creek, Rodeo area.
B. Repair status:
1. Public Works has awarded the project to the low bidder, E.E. Gilbert Construction.
2. Construction began on September 27, 2004. The contractor formed and poured the
concrete encasement around existing bent cap. The contractor will next be removing
the form work.
IV. CONSEQUENCES OF NEGATIVE ACTION:
Non-concurrence of the above recommendation will delay repair of the bridge structure until 2005,
which could cause the structure to continue to degrade. Continued degradation could result in