Loading...
HomeMy WebLinkAboutMINUTES - 10212003 - C61-C62 TO: BOARD OF SUPERVISORS, as the Governing Body of the Contra Costa County Flood Control and Water Conservation District FROM: MAURICE SHIU, CHIEF ENGINEER GATE: October 21, 2003 SUBJECT: TERMINATE the emergency action originally taken by the Board of Supervisors on June 17, 2003 regarding the repair of the San Ramon Creek Storm Drainage along Casa Vallecita, as recommended by the Chief Engineer, Alamo area. [CDD-CP # 03-251 (District 111) Project No.: 7520-6B9324-0 Specific Request(s) or Recommendation(s) & Background & Justification 1. RECOMMENDED ACTION: TERMINATE the emergency action taken by the Board of Supervisors on June 17, 2003, pursuant to Public Contract Code Sections 22035 and 22050, to repair the San Ramon Creek Storm Drainage along Casa Vallecita, Alamo area, Continued can Attachment: X SIGNATURE: �2ECOMMENDATION OF COUNTY ADMINISTRATOR RECOMMENDATION OF BOARD COMMITTEE _,,APPROVE OTHER SIGNATURE(S) Ic- ACTION OF BO October AP qVI D AS RECOMMENDED X OTHER VOTE OF SUPERVISORS X UNANIMOUS (ABSENT Nome } AYES: NOES: I hereby certify that this is a true and correct ABSENT: ABSTAIN: copy of an action taken and entered on the MC:tb minutes of the Beard of Supervisors on the G:\GrpOata\Const180\2003\EmergeneyBO- date shown, San Ramon Creek@CasaVallecita#sTermination.doe Orig.Div: Public Works(Construction) Contact: Mike Carlson(313-2321) Cc: E.Kuevor,CAO ATTESTED: October 21, 2003 Auditor-Controller John Sweeten, Clerk of the Board of Community Development PW Accounting Supervisors and County Administrator Construction ly B `, '�'` fix rj x' x° x f" Y ' r Deputy SUBJECT: TERMINATE the emergency action originally taken by the Board of Supervisors on June 17, 2003 regarding the repair of the San Raman Creek Storm Drainage along Casa Vallecita, as recommended by the Chief Engineer, Alamo area. [CDD-CP # 03-25] (District ill) Project No.: 7520-689324-03 DATE: October 21, 2003 PAGE: 2 If. Financial Impact: The total estimated contract cost is $444,570, funded by Flood Control Zone 3B Funds. Ill, Reasons for Recommendations and Background: A. On June 17, 2003, the Board of Supervisors declared an emergency and authorized the Chief Engineer to proceed in the most expeditious manner to repair the Storm Drain and Bridge. B. Repair status: Granite Construction Company has completed the repair of the drainage along San Ramon Creek and Casa Vallecita,therefore the Emergency Action may be terminated. IV. Consequences of Negative tive Action: A negative action would have no impact on the work that has been completed. TO: BOARD OF SUPERVISORS FROM: MAURICE M. SHIU, PUBLIC WORKS DIRECTOR DATE: October 21, 2003 SUBJECT: CONTINUE the emergency action originally taken by the Board of Supervisors on August 5, 2003 regarding the construction of the Asbury Graphite Wastewater System as recommended by the Public Works Director, Hercules area. [SCH No. 95043029] (District ii) Project No.: 4660-6X4152. SPECIFIC REQUEST(S)OR RECOMMENDATION(S)&BACKGROUND AND JUSTIFICATION 1. Recommended Action: DETERMINE that there is a need to continue the emergency action taken by the Board of Supervisors on August 5, 2003, pursuant to Public Contract Code Sections 22035 and 22050,to construct a wastewater system for Asbury Graphite, Hercules area. i" Continued on Attachment: X SIGNATURE: _,e-RECOMMENDATION OF COUNTY ADMINISTRATOR _RECOMMENDATION OF BOARD COMMITTEE APPROVE OTHER SIGNATURE( ACTION OF BOAO ON October 21, 2003 APPROVED AS RECOMMENDED X OTHER ( hereby certify that this is a true and correct copy of an VOTE OF SUPERVISORS action taken and entered on the minutes of the Board X UNANIMOUS (ABSENT Tine > of Supervisors on the date shown. AYES: NOES: ABSENT: ABSTAIN: MH:JP:ga ATTESTED: October 21 2003 G:\GrpData\Design\BOARDORDER&Bo2003lAsburyEmergency5.docJOHN SWEETEN, Clerk of the Board of Supervisors Orig.Div: Public Works(Design) and County Administrator Contact: J.Pulliam 393-2165 c: M.Hollingsworth,Design K.Laws,Real Property , i 3 By ' -l✓ � r Deputy SUBJECT: CONTINUE the emergency action originally taken by the Board of Supervisors on August 5, 2003 regarding the construction of the Asbury Graphite Wastewater System as recommended by the Public Works Director, Hercules area. [SCH No. 05043029] (District 11) Project No.: 4660-6X4152. DATE: October 21, 2003 PAGE 2 II. Financiallmpact: The total estimated contract cost is$400,000,which is 100% reimbursable from the Contra Costa Transportation Authority. Ill. Reasons for Recommendations and Background: A. On August 5, 2003, the Board of Supervisors declared an emergency and authorized the Public Works Director to proceed in the most expeditious manner to repair the erosion and failed bank slope protection. B. Repair status: Construction of Phase 1 by Sebastopol Construction continues on schedule, with completion scheduled for late October. Phase 2 is currently being designed. IV. Consequences of Negative Action: Non-concurrence of the above recommendation will delay replacement of the wastewater system until 2004 resulting in the increased potential for the failure of the existing system, which would cause effluent contamination of the surrounding area and off hauling up to 750 gallons per day of effluent to an appropriate disposal facility.