Loading...
HomeMy WebLinkAboutMINUTES - 10142003 - C18 TO: BOARD OF SUPERVISORS AS THE BOARD OF DIRECTORS, BLACKHAWK GEOLOGIC HAZARD ABATEMENT DISTRICT FROM: MAURICE SHIU, PUBLIC WORKS DIRECTOR. DATE: October 14, 2003 SUBJECT: RATIFY the decision of Richard D. Short, Kleinfelder, Inc., General Manager of the Blackhawk Geologic Hazard Abatement District(GHAD)to execute a contract with Engineered Soil Repairs in the amount of $207,299 for emergency repair of landslide damage on the common slope bordering 923 and 929 Eagle Ridge for the period October 3, 2003 through completion of project; and APPROVE and AUTHORIZE Richard D. Short, Kleinfelder, Inc., General Manager of the GHAD to execute contract change orders as may be required up to 10% of the contract amount or$20,730, Danville area. (District III) Project No. 7760-6X5147 SPECIFIC REQUEST(S)OR RECOMMENDATION(S)&BACKGROUND AND JUSTIFICATION I. Recommended Action: RATIFY the decision of Richard D. Short, Kleinfelder, Inc., General Manager of the Blackhawk Geologic Hazard Abatement District (GHAD) to execute a contract with Engineered Soil Repairs in the amount of$207,299 for emergency repair of landslide damage on the common slope bordering 923 and 929 Eagle Ridge for the period October 3, 2003 through completion of project; and APPROVE and AUTHORIZE Richard D. Short, Kleinfelder, Inc., General Manager of the GHAD to execute contract change orders as may be required up to 10%of the contract amount or$20,730. IL Fiscal lmpact: There is no impact to the County General Fund. The funding is 100% Blackhawk GHAD. The proposed contract is consistent with the adopted Fiscal Year 2003/2004 program budget. Continued on Attachment: X SIGNATURE: �.-,4COMMENDATION OF COUNTY ADMINISTRATOR �RECOMMENDATION OF BOARD COMMITTEE _ PPROVE OTHER SIGNATURE(S): ACTION OF BOAR66N OCTOBER 14, 2003 APPROVED AS RECOMMENDED Xx OTHER VOTE OF SUPERVISORS I hereby certify that this is a true and correct copy of an XX UNANIMOUS(ABSENT NONE ) action taken and entered on the minutes of the Board of AYES` NOES: Supervisors acting as the GHAD Board on the date shown. ABSENT: ABSTAIN: ATTESTED: OCTOBER 14, 2003 JOHN SWEETEN,Clerk of the Blackhawk GHAD Board MS:sr of Directors and Board Administrator G:\GrpData\SpDist\Board Orders\2003\I0-14-03 BO-(B)923 Eagle Ridge.doc Orig.Div: Public Works(Special Districts) F Contacts Skip Epperly(313-2253) By cc: County Counsel Eeputy✓ Auditor-Controller L.Holden,Accounting E.Whan,Eng.Svc. R.Short,Kleinfelder,Inc. GHAD File&Binder SUBJECT. RATIFY the decision of Richard D. Short, Kleinfelder, Inc., General Manager of the Blackhawk Geologic Hazard Abatement District(CHAD)to execute a contract with Engineered Sail Repairs in the amount of $207,299 for emergency repair of landslide damage on the common slope bordering 923 and 929 Eagle Ridge for the period October 3, 2003 through completion of project; and APPROVE and AUTHORIZE Richard D. Short, K.leinfelder, Inc., General Manager of the CHAD to execute contract change orders as may be required up to 10% of the contract amount or$20,730,Danville area. (District III)Project No. 7760-6X5147 DATE: October 14, 2003 PAGE: 2 III. Reasons for Recommendation and Background: During the winter of 1998, a shallow landslide occurred on the common slope behind 923 and 929 Eagle Ridge, Danville, California. Subsequently, Engeo, Inc., San Ramon, California was retained to observe the slope failure and make preliminary recommendations. Engeo Inc. observed that the slope failure was actually larger than anticipated involving the upper area of the slope behind 923 and 929 Eagle Ridge. The unstable area, measured 250 feet wide by 40 feet high. A repair scheme was recommended that included excavating and rebuilding the slope with a geogrid reinforced fill and a subdrainage system. At the risk of further slope movement the repair was deferred. Engeo Inc. was requested to update their repair recommendations in February 1999. Again, the CHAD deferred repair. In August 2000, the GHAD addressed the worsening slope conditions with a request that Engeo Inc. prepare detailed slope repair and keyway construction plans and specifications. The repair was again deferred. By the winter of 2002/2003 the slope movement had extended further onto the homeowners rear yard area creating a sense of alarm with the homeowners. The slope repair project was included in the Fiscal Year 2003/2004 budget with an estimated cost of repair of$250,000. The delay of the slope repair has caused a deterioration of the slope and created a condition highly likely to cause severe damage to valuable property consisting of the rear yard area improvements at 923 and 929 Eagle Ridge unless mitigation measures are taken immediately before the upcoming rainy season. License Agreements providing the GHAD with sufficient rights to enter upon and repair the landslide have been executed with the Blackhawk Home Owners Association(HOA) as well as the three affected homeowners. The License Agreements with the three homeowners provide for the CHAD to partially reimburse the homeowners the cost of repairing and/or replacing landscaping and other improvements damaged by the landslide in accordance with the GHAD's interim policy on "Funding for the Repair and/or Replacement of Landscaping;and other Improvements Damaged by Landslides." Board Resolution 98/329 defines exceptions to procedures related to advertising and awarding of CHAD maintenance and repair contracts. Section I.D.2 Emergencies authorizes the CHAD General Manager to waive the standard contract and bidding award procedures when in the reasonable judgment the project is necessary to prevent or mitigate an emergency. IV. Consequences of Negative Action: Without Board approval, the GHAD will not be able to compensate emergency response contractors and consultants for the repair and further jeopardize upslope structures at 923 and 929 Eagle Ridge Drive.