HomeMy WebLinkAboutMINUTES - 09092003 - C.35 TO: BOARD OF SUPERVISORS AS THE BOARD OF DIRECTORS, BLACKHAWK. GEOLOGIC HAZARD ABATEMENT DISTRICT(CHAD) FROM: MAURICE M. SHIU, PUBLIC WORKS DIRECTOR DATE: September 9, 2003 SUBJECT: ACCEPT and APPROVE the Fiscal Year 2003/2004 Program Budget for the Blackhawk Geologic Hazard Abatement District, Danville area. (District III) Project No. 7760-6X5147 SPECIFIC REQUEST(S)OR RECOMMENDATION(S)&BACKGROUND AND JUSTIFICATION L Recommended Action: ACCEPT the attached Proposed Fiscal Year 2003/2004 Program Budget for the Blackhawk Geologic Hazard Abatement District (CHAD) by the CHAD Manager, Richard D. Short, Kleinfelder, Inc., and APPROVE the following proposed "Sources and Uses of Funds"table: .Bud et FY21103/2004 Sources And uses of Funds Table B innn Fund Balance-July 1,2002 $699,439 Sources of Funds* Contributions from M-23 $1,350,000 Interest on Investments $40,000 Other income 0 Total Sources of Funds $1,390,000 Total Available Funds $2,089,439 Uses of Funds Major Repair Program {Acct Code 23191 $735,000 Preventative Maintenance Program {Acct Code 22821 $177,500 Special Projects {Acct Code 24791 $61,000 Administration and PW {Acct Code 23101 & {Acct Code 5011) $248,315 Total Uses of Funds $1,221,815 Reserve Available/Estimated Ending Fund Balance June 30,2003 $867,624 *Source of funds estimated. Continued on Attachment: X SIGNATURE: <.f RECOMMENDATION OF BOARD COMMITTEE APPROVE OTHER SIGNATUREN OF BO ON S- ER APPROVED A9 M7513MMMED OTHER S VOTE OF SUPE VVI ORS 00 03 xx Uiv'AN "S(ABSENT V ) AYES: NOES: I hereby certify that this is a true and correct copy ABSENT;_ ABSTAIN: of an action taken and entered on the minutes of the Board of Supervisors acting as the CHAD G:\Grpsr=\Grpl3ata\SpDist\Board Orders\2003109-09-03 130-(B)Budget FY 03-04.dao Board on the date shown. Orig.Div:Public Works(Special Districts) Contact: Skip Epperly(313-2253) cc: County Administrator ATTESTED: SEPTEMBER 09, 2003 County Counsel JOHN SWEETEN Clerk of the Blackhawk E E..Whanhan,Eng.Svc.Holden,Accounting GRAD Board of Directors and Board Kleinfelder,Inc. Administrator CHAD File SUBJECT: ACCEPT and APPROVE the Fiscal Year 2003/2004 Program Budget for the Blackhawk Geologic Hazard Abatement District,Danville area. (District III)Project No. 7760-6X5147 DATE: September 9, 2003 PAGE: -2- H. Fiscal Impact: No impact to the County General Fund. Funding is 100%Blackhawk GRAD. III. Reasons for Recommendation. and Background: On April 22, 1986, the Contra Costa County Board of Supervisors adopted three resolutions which resulted in the formation and funding of the Blackhawk CHAD. Resolution No. 86/209 provided for the addition of geologic hazard abatement extended services to County Service Area M-23 (Blackhawk area). Resolution No. 86/210 approved formation of the Blackhawk GHAD pursuant to the provisions of Section 26550 of the Public Resources Code and appointed the Board of Supervisors to act as the Board of Directors of the GHAD. Resolution No. 86/211 approved a Joint Exercise of Powers Agreement (JEPA) between the County and the CHAD, to among other things, provide for the funding of the CHAD by the transfer of a portion of CSA M-23 revenues. Deferred major repairs represent 55 percent of the major repairs budget and include the following three sites: 923/929 Eagle :Ridge, 59 Chestnut and Blackhawk Plaza. Each year these repairs are deferred the slide area grows and the repair cost increases. Additionally, in the aftermath of the December 15, 2002 storm 22 sites require remedial repairs as well as de-silting the lake at Hole# 11. The above "Sources and Uses of Funds" table is intended to summarize the approved budget. The attached report detailing the various programs and activities of the CHAD is provided for the information of the Board of Directors and others and is not considered a part of the adopted budget. The General Manager may reallocate funds within each of the above major categories without prior approval of the Board. Kleinfelder, Inc. is now proposing that the Board accept the attached proposed Program Budget and approve the "Sources and Uses of Funds"table(above). IV. Consequences of Negative Action: The GHAD will not have an approved budget as required by the original formation of the GRAD. Consequently, repairs will be delayed and potentially result in increased costs due to enlargement of the slide areas. BLACKHAWK GEOLOGIC HAZARD ABATEMENT DISTRICT PROPOSED PROGRAM BUDGET FOR FISCAL YEAR 2003-2004 July 28, 2003 Blackhawk CHAD Board of Directors Contra Costa County Board of Supervisors c/o Skip Bpperly, CHAD Liaison 255 Glacier Drive Martinez, CA 94553-4897 SUBJECT: Proposed Program Budget for Fiscal Year 2003-2004 Ladies and Gentlemen. Attached is the proposed program budget for the Blackhawk Geologic Hazard Abatement District for the fiscal year 2003-2004. The proposed program budget is $1,221,815. On a percentage basis the budget expenses breakdown as follows: ■ Major Repairs 60 percent ■ Preventative Maintenance and Operations, 15 percent • Special Projects 5 percent • Administration. 20 percent The budget anticipates a contribution of $178,185 to the reserve fund that is estimated to be $905,261 on June 30, 2004. A summary of the expenses is shown on Table 1, page 5 followed by brief descriptions of each budget item on pages 6 through 12. Very truly yours, Blackhawk Geologic Hazard Abatement District Richard Short General Manager Kleinfelder, Inc. Distribution list: Blackhawk Home Owners Association Saddleback at Blackhawk Blackhawk Country Club 4125 Blackhawk Plaza Circle, #230 C/o Jean Bates&Associates 599 Blackhawk Club Drive Danville, California 94506 3840 Blackhawk Road#120 Danville, CA 94506 Attention:Mark Goldberg Danville, CA 94506 Attention:Larry Marx, General Manager P.O.Box 3428 Hidden Oaks at Blackhawk Danville, CA 94526 Supervisor Millie Greenberg C/o Community Care Property 309 Diablo Road Management Silver Oak Tbwnhomes at Danville, CA 94526 P.O Box 1270,Pleasanton CA 94566 BlackhawkCanyons at Blackhawk Attention:Kathy Chiverton, Chief of Staff C/o Miramonte Company Tennis Villers at Blackhawk 12.25 Alpine Road#206 Clo CMJAssociates Inc. Walnut Creek, CA 94596 P.O.Box 190 Attention:Lin Yates Pleasanton, CA 94526 2003/2004 Budget(GHAD3BO01) 4 copyright 2003 Blackhawk CHAD Blackhawk Geologic Hazard Abatement District Proposed Program budget for Fiscal Year 2003/2€04 The following proposed program budget summarizes the anticipated expenditures for fiscal year 2003/2004 for the Blackhawk Geologic Hazard Abatement District and is divided into the following four categories: Major=Repairs Major repairs are slope repairs and drainage improvement projects that are required typically because of slope damage resulting from previous winters. Major repairs are contracted out to vendors based on County contracting procedures and policies. Generally major repairs have a minimum contract value of$10,000. Preventive Maintenance And Operations Preventive Maintenance and Operations includes all routine repairs, cleanup, maintenance, monitoring and response to homeowners concerns that occur on an annual basis regardless of the preceding slope damage from winter rains. The goal of preventive maintenance is to keep the CHAD assets in operational condition and identify potential slope stability problems before they occur so that measures can be taken to prevent landsliding. Typical GHAD assets include concrete lined ditches, subdrainage systems, groundwater measuring instrumentation, and slope debris catchment features. Preventive maintenance also includes preparations for emergency response to rain caused slope damage such as stock piling erosion protection and slope stabilization supplies. Special Projects The GHAD has ongoing and new efforts identified as "Special Projects" which are activities requested by the Board such as the revised "Pian of Control" or projects designed to improve the District's operational effectiveness. Administration Administrative expenses are required to operate the GHAD and implement the projects. Administrative expenses include the General Manager, clerical and accounting staff, office expenses, legal support and County Public Works personnel support. A summary of the proposed Fiscal Year 2003/2.004 Budget is presented in Table 1. 2003/2004 Budget(GHAD3BO0I) 5 copyright 2003 Blackhawk GRAD Table I -Summag of Proposed Fiscal Year 2003/2004 Budget Major Repairs 923/929 Eagle Ridge Aide Repair 250,000 59 Chestnut 45,000 Blackhawk Plaza Slide Repair 110,000 Hole# 11 Lake Restoration 20,000 Dec 15 Storm Repairs 250,000 i Landscape Re lacement associated with repairs 60,(}00 Total Major Pro'ects $735,000 60% Preventative MaintenancelOperations .Preventative Maintenance Drainage B-58 Concrete Lined Ditches Maintenance Cleanup 37,000 Repairs 10,000 Subdrain Systems Cleanout Horizontal Drains 5,000 Subdrain Pumps 3,000 Piezometers 2,000 Settlement Monitors 1,000 Minor Repairs <$10,000 50,000 Winterizing 15,000 Emergency Response 15,000 i Debris Benches 5,000 ' Subtotal $143,000 i Operations Piezometer Monitoring 3,000 Inclinometer Monitoring 14,000 Horizontal Drain Monitoring 2,500 Subdrain Monitoring 4,000 Settlement Monitoring 1,000 Incident Response/Homeowner Relations 10,000 Subtotal $34,500 Total Preventative Maintenanc O erations $177,500 15% Special Projects Plan of Control 5,000 Reserve Study 5,040 Test Fill Study 20,000 GIS/GPS Systems 20,000 Accounting Systems 4,000 Procedures Manual 2,000 Communications Program 5,000 Total Special Projects $61,000 5°10 2003/2004 Budget(GHAD3B001) 6 copyright 2003 Blackhawk CHAD 1 Administration 1 i Legal Fees General Counsel-CCC Counsel 35,000 Special Counsel 15,000 CSDA membership 2,000 Public Works 12,000 Office Expenses i Rent 25,665 i Telephone 2,500 ' Postage and Delivery 400 Printing and Reproduction 1,000 Office Supplies 750 Staffing/Administrative Support Accounting/Bookkeeping 32,000 Training and Education 2,000 General Manager 120,000 Total Administration $248,315 20% TOTAL PROPOSED BUDGET $1,221,815 100% Available Funds i Estimated Beginning Fund Balance—July 1, 2003* $699,439 Estimated Contributions from M-23 $1,350,000 Estimated Interest on Investments 40,000 Other Income 0 Total'Available Funds $2,089,439 Uses of Funds Major Projects $ 735,000 Preventive Maintenance 177,500 Special Projects 61,000 Administrative and PW 248,315 Total Use of Funds ' $ 1,221,815 Estimated Reserve Available/Ending Fund balance.lune 30, 2004 $867,624 *July 1, 2003 estimated balance based on 4ht quarter expenses DESCRIPTION OF BUDGET ITEMS A brief description of each of the budget item categories is presented below. Major Repairs 9231929.Bade Ridge Slide Rep A landslide occurred on the slope below 923 and 929 Eagle Ridge Drive during the El Nino winter of 1997-1998. Although, the slide was isolated in upper mid-slope area it created a risk to the rear yards of these properties. In the subsequent winter seasons the area of the slide has enlarged beyond the rear fence line of these two properties. A Geotechnical landslide investigation report has been prepared. The recommended repair scheme includes removal and 2003/2004 Budget(GHAr33B001) 7 copyright 2003 Blackhawk CHAD replacement of the soils in the failed area and the installation of a subdrain system at the native soil and fill interface. Estimated cost$250,000 59 Chestnut A persistent shallow stability problem has existed on the common area slope below this property where a shallow landslide has occurred. During the December 15, 2002 storm another mudflow occurred. A removal and replacement repair with imported coarse material and subdrainage has been designed. Estimated cost $45,000 Blackhawk Plaza SlideRepair A thirty-foot long section of a four-foot high Keystone retaining wall located at the edge of the Blackhawk Plaza parking lot failed in 1998. The slide associated with the failure undermined the edge of the parking lot pavement causing a safety hazard. Since the slide occurred in 1998 the slide area has grown significantly. The repair includes rebuilding the Keystone wall and re- grading the slopes above and below the failed wall. The damaged pavement and planter curbs will also be repaired. Estimated cost$110,000 .Hole#11 fake Restoration During the winter months runoff from the surrounding slopes carries silt that is deposited in the flood control retention basins. The retention basin located at Dole# 11 is also a water feature for the golf course that includes a pump and a large waterfall. The CHAD has negotiated a shared cost solution where the CHAD pays 62.5%, the Country Club pays 25% and the HCFA pays 12.5% of the repair costs to de-silt the pond. A long term solution (not included in this contract) is being considered by the Country Club that would reroute the flood control channel around the rear of the green with terraced water steps that can be more easily cleaned with conventional equipment. Estimated cost$20,000 December 15 Storm Repairs During the winter storm of December 15, 2003 over sixty mudflows were reported to the CHAD. Each site was stabilized using winterization materials including the placement of sheet plastic to restrict water infiltration and secured against the wind until they could be repair in the dry season. The District will utilize several repair techniques including minimal slope re-shaping to excavation and replacement with subdrainage. This summer twenty-two of the more severe landslide sites are scheduled for repair. Estimated cost$250,000 2003/2004 Budget(GHAD3BO01) 8 copyright 2003 Blackhawk CHAD Landsoge Kalacement In conjunction with the repair of the storm damage at the twenty-two sites, it is anticipated that a number of sites will require remedial landscaping Estimated cost$60,000 Preventative Maintenance and Operations Preventative maintenance generally includes drainage issues. Operations includes ongoing monitoring programs and responding to homeowner concerns. Retails of the proposed budget for each of these categories are listed below. Drainc��e The GHAD maintains over twelve miles of concrete lined V-ditches located on the common slopes. Annually before the rainy season, the ditches are cleaned of eroded soil deposits and debris so that they flow freely. Isolated cracks and open construction joints caused by soil expansion and creep require repair that may include patching or replacement of sections of the V-ditches. Estimated cost$47,000 The GHAD maintains miles of subdrain systems that have been installed over the years both as part of the original grading plan and those installed as part of landslide repairs. In a number of cases the subdrais flow into sumps below the ground surface and they require pumps to direct the flow to the storm drainage system. Maintenance expenses include cleaning subdrains and checking pumps for proper operation. Estimated cost$8,440 Piezometers and settlement monitors were installed during grading required for the development of the residential community and subsequently by the GHAD as part of landslide investigations and repair programs. Routinely, these assets require maintenance, installation of new instrumentation and possibly abandonment of obsolete sites. Estimated cost $3,040 Every year unanticipated minor repairs are required for a variety of circumstances related to the condition of GHAD drainage systems. These repairs average less than$1.0,000 per incident. Estimated cost$50,000 Prior to the onset of winter rains slopes that are exposed to potential erosion from heavy rain are winterized with the installation of erosion protection measures. Examples of erosion protection include hyro-seeding, plastic sheeting,wattling,hay bales or jute mesh. Estimated cost$15,004 2003/2004 Budget(GHAD3B001) 9 copyright 2003 Blackhawk GHAD During the winter rainy season the GHAD responds to many drainage incidents on short notice in emergency situations where property damage is threatened. These incidents typically involve clogged storm drains at the base of slopes or flooded residential properties due to the overflow of runoff from clogged V-ditches. In severe cases these responses can be the initiation of slope stabilization measures in preparation for a major repair. Estimated east$15,000 Debris benches are located on slopes throughout the development to collect eroded soil resulting from heavy runoff. Periodically, CHAD cleans these benches to re-establish their capacity to collect and contain mudflows. Estimated cost$5,000 Operations An inventory of hundreds of piezometers, inclinometers, horizontal drains, subdrains and settlement monuments are monitored periodically throughout the year as a preventative measure. Some sites have been repaired and require monitoring to confirm that the slope has been stabilized. Other sites have shown signs of unstable conditions developing and have been instrumented to determine parameters of the slope conditions such as water depth, magnitude of slope movement, depth of movement and ground surface movement. Through the year the GHAD receives phone calls from homeowners regarding slope stability or drainage issues. The General Manager and the Operations Manager make calls on the homeowners to address their concerns. Estimated cost$34,500 Special Projects In the upcoming fiscal year the CHAD is anticipating completion of several special projects, as well as, introducing several new special projects. A brief description of the special projects are presented below. Plan of Control The operations of the GHAD are defined by the Plan of Control. The original Plan of Control document is general in nature and does not address many of the circumstances that have arisen during the GHAD's existence. Consequently, the Board of Supervisors has requested an updated Plan of Control. A draft document was prepared in the spring and distributed for comment. The GHAD plans to incorporate the review comments and complete the process so that the new Plan of Control can be submitted to the Board of Supervisors for approval and implementation. Estimated cost $5,000 2003/2004 Budget(GHAD3B001) 10 copyright 2003 Blackhawk GHAD Reserve Study The Board of Directors has requested that a reserve study be performed to determine the amount that the GHAD should contribute to a reserve fund annually and the amount that the GHAD should try to maintain in a reserve fiend. The GHAT) contracted with a consultant, John D. Beatty and Co., to assist the General Manager in preparing the reserve study. The study will be completed in the first quarter. Estimated cost $7,000 `est Fill Study The CHAD has developed a test fill program to create a demonstration fill slope that can be studied to determine the typical adverse effects of slope creep, settlement, leaking pipes and other common problems the CHAD routinely deals with. The purpose of the study will be to develop a manual of homeowner guidelines for maintenance and construction of appurtenant structures located near slopes. Estimated cost$20,000 GIS/CPS Systems CHAD has contracted with Farallon Geographic Inc. to develop and maintain a GIS system. The purpose of the system is to create a permanent historical record of every incident response. This record facilitates the General Manager's ability to ascertain the effectiveness of past repairs and assist in the evaluation of past unstable conditions in any particular area. The GIS is also of great use when researching the CHAD operations on properties for purposes of disclosure during real estate sales. The web page is a part of the service provided. The web page will be an information source for the public. Estimated cost $20,000 Accountin Systems and Procedures Manual The GHAD administration is in the process of evaluating the current accounting system and revising the procedures manual. This effort reflects the lessons learned and is intended to memorialize GHAD policies and procedures. Estimated cost $6,000 Communications At the request of the Board, CHAD developed a communications plan during the last fiscal year. This program is designed to keep the homeowners up to date on the CHAD operations and developments. To date the meetings have been held with the homeowner's associations, the Country Club and County personnel to explain CHAD activities. The CHAD has implemented a web page for public information. Elements of this program still need to be implemented with regard to the Community Education such as creating a Newsletter, a Brochure, and the Homeowner Manual. Estimated cost$5,000 200312004 Budget(GHAD3B001) 11 copyright 2003 Blackhawk CHAD Administration The administration of the CHAD includes all costs associated with legal support, County Public Works liaison, office expenses, and staffing. Brief descriptions follow. L The GRAD incurs legal expenses from both County Counsel and periodically from outsourced Special Counsel, The GHAD is currently working with County Counsel and the HOA to craft an agreement regarding storm sewer maintenance and replacement. This matter will most likely require a significant amount of time by the General Manager in association with County Counsel. Special Counsel typically handles lawsuits and settlement issues for the GHAD, as required. The CHAD participates in the California Special Districts Association to keep abreast of legislative actions relevant to its operations. Estimated cast$52,000 Pudic Works The GHAD's liaison with the board is provided by Skip Epperly with the Contra Costa Public Works Department. In addition, CHAD will periodically discuss its activities with Public Works personnel to seek advice and consent. Estimated cost$12,000 Oce Expenses Office administrative expenses include rent, telephone, postage, printing and repro, and office supplies. CHAD maintains an office in the Elackhawk community so that it can operate effectively by being close to the project sites, respond in a timely fashion to the homeowner's needs and be available to meet with homeowners. Estimated cost$30,315 Sta in The GHAD staff includes the General Manager and one administrative support staff. The CHAD staff is assisted by Sands Construction for support services pertaining to operations. Sands Construction costs are included in the relevant budget items listed above. The General Manager handles all GHAT) issues and communications regarding its activities. The administrative staff is responsible for accounting/bookkeeping, clerical and construction management support. Training and Education are also included. Estimated cast$154,000 2003/2004 Budget(GHAD3B001) 12 copyright 2003 Blackhawk CHAD