Loading...
HomeMy WebLinkAboutMINUTES - 09092003 - C.132-C.135 To: BOARD O SUPERVISORS ., , ': CONTRA COSTA .-Tim•. ftom: William B.Walker, M.D. Health Services Director Date: September 9, 2003 Subject: Extension of Emergency Declaration regarding Homelessness SPECIFIC RFQUESTT(S)OR RECOMMENDATION(S)&BACKGROUND AND JUSTIFICATION Recommendation: CONTINUE with the emergency action originally taken by the Board on November 16, 1999 regarding the issue of homelessness in Contra Costa County. Background: Government Code Section 8630 required that, for a body which meets weekly that the need to continue the emergency declaration be reviewed at least every 14 days until the local emergency is terminated. In no event is the review to take place more than 21 days after the previous review. With the continuing inclement weather and no additional resources having been able to be placed on line to assist in sheltering homeless individuals and families, it is appropriate for the Board to continue the declaration of a local emergency regarding homelessness. On November 16, 1999, the Board of Supervisors declared a local emergency, pursuant to the provisions of Government Code Section 8630, on homelessness in Contra Costa County. This local emergency was extended on December 1, 1999, December 20, 1999, January 11, 2000, January 25, 2000, February 15, 2000, March 7, 2000, March 21, 2000, April 11, 2000, May 16, 2000, June 6, 2000, July 18, 2000, August 8, 2000, September 12, 2000, September 26, 2000, October 10, 2000, October 24, 2000, November 14, 2000, December 5, 2000, December 19, 2000, January 9, 2001, January 23, 2001, February 6, 2001, February 27, 2001, March 13, 2001, March 27, 2001,April 10, 2001, April 24, 2001, May 8, 2001, May 22, 2001, June 5, 2001, June 19, 2001, July 10, 2001, July 24, 2001, August 7, 2001, September 11, 2001, September 25, 2001 October 9, 2001, October 23, 2001, November 6, 2001, December 4, 2001, December 18, 2001, January 8, 2002, January 22, 2002, February 5, 2002, February 26, 2002, March 12, 2002, March 26, 2002,April 9, 2002, April 23, 2002, May 7, 2002, May 21, 2002, June 4, 2002, and June 18, 2002, July 9, 2002, July 23, 2002, August 6, 2002, September 10, 2002, September 24, 2002, October 8, 2002, October 22, 2002, November 5, 2002, December 3, 2002, December 17, 2002, January 21, 2003, February 4, 2003, March 4, 2003, March 18, 2003, April 8, 2003, May 6, 2003, May 20, 2003, June 3, 2003, June 17, 2003, July 15, 2003, August 12, 2003, CONTINUED ON ATTACHMENT: NO SIGNATURE t/'""' 4, &9d �. o e W RECOMMENDATION OF COUNTY ADMINISTRATOR RECOMMENDATION OF BOARD COMMITTEE ----APPROVE OTHER SIGNATURE(S): ACTION OF Bf D ON Septmber 9, 2003 APPROVED AS RECOMMENDED X OTHER VOTE OF SUPERVISORS I HEREBY CERTIFY THAT THIS IS A TRUE X UNANIMOUS (ABSENT V } AND CORRECT COPY OF AN ACTION TAKEN AND ENTERED ON THE MINUTES OF THE BOARD AYES: NOES: OF SUPERVISORS ON THE DATE SHOWN. ABSENT: ABSTAIN: Contact Person: Wendel Brunner, M.D. 313-6712 ATTESTED Septanbpr 9+ 20113 CC: Health Services Administration JOHN SWEETEN, CLERK OF THE BOARD OF Public Health Administration SUPERVISORS AND COUNTY ADMINISTRATOR BY jt DEPUTY To: BOARD OF SUPERVISORS CONTRA COSTA COUNTY j! From: William B.Walker, M.D. Health Services Director Date: September 9, 2003 Subject: EXTENSION OF EMERGENCY DECLARATION AND AUTHORIZATION OF THE COUNTY HEALTH DEPARTMENT IN SUPPORT FOR NEEDLE EXCHANGE PROGRAMS SPECIFIC REQUEST(S)OR RECOMMENDATION(S)&BACKGROUND AND JUSTIFICATION Recommendation: CONTINUE with the emergency action originally taken by the Board on December 14, 1999 based on the increasing/epidemic number of AIDS/HIV and Hepatitis C cases among injection drug users in Contra Costa County. Backeroukd• Continued bleed for Emergency The spread of disease, particularly HIV and Hepatitis C, through the sharing of needles continues to be a grave concern in Contra Costa County. 30% of all people living with AIDS in Contra Costa were infected by injection drug use with the highest number of AIDS cases in West County As of December 1997, Richmond had the highest cumulative incidence of AIDS (4.8 per 1000 population) among Contra Costa cities, with at least 50 cases. Injection drug use was the estimated mode of infection among 40% of all individuals diagnosed with AIDS in Richmond. Among African Americans diagnosed with AIDS in Richmond 1982-1998 53%were most likely infected through injection drug use. Contra Costa Health Services does not currently provide needle exchange services(it is prohibited from doing so absent a declared public health emergency). CCHS does provide services focused on injection drug users including: 1-HIV/AIDS Outreach and Education, 2-HIV antibody testing, 3-Substance Abuse Treatment, 4-Health on Wheels Van, and 5-Substance Abuse Counseling and Treatment for HIV-infected clients. CONTINUED ON ATTACHMENT: YES SIGNATURE: 4. � s—'RECOMMENDATION OF COUNTY ADMINISTRATOR RECOMMENDATION OF BOARD COMMITTEE -----APPROVE OTHER t� SIGNATURE(S): ACTION OF BO 4 4 September 9, 2003 APPROVED AS RECOMMENDED E OTHER VOTE OF SUPERVISORS I HEREBY CERTIFY THAT THIS IS A TRUE UNANIMOUS X (ABSENT V) AND CORRECT COPY OF AN ACTION TAKEN AYES: NOES: AND ENTERED ON THE MINUTES OF THE BOARD AYES: NOES: OF SUPERVISORS ON THE DATE SHOWN. ABSENT: ABSTAIN: ATTESTED ftteuber 9. 2003 JOHN SWEETEN, CLERK OF THE BOARD OF SUPERVISORS AND COUNTY ADMINISTRATOR Contact Person: Wendel Brunner, M.D. 313-6712 CC: Health Services Director Public Health Administration ° DEPUTY Board of Supervisors Page 2 Emergency Declaration for Support of Needle Exchange Programs Exchange Works, a comm pity-based needle exchange service currently in operation in Contra Costa currently distributes clean,needles on a one-to-one basis. "Their volunteer staff currently exchange 5,000 needles per week at two sites. There are no established needle exchange program in East or Central County. PROGRESS SINCE EMERGENCY DECLARATION ON DECEMBER 14, 1999 At the Board of Supervisors December 14, 1999 meeting, CCHS was directed to take four actions. As of January 7, 2000 the following has been completed: CCHS has entered into discussions with Exchange Works in West County. • Supplies for the ongoing provision of the services have been identified. CCHS staff have been identified to assist with the provision of information and referrals. « Documentation forms are being reviewed and revised as necessary to ensure that specific information is available to the:Board. » Planning for an East County process will begin later this quarter after the preliminary process in West County is completed. "kis emergency action was renewed on December 20, 1999, January 11, 2000, January 25, 2000, February 15, 2000, March 7. 2000, March 21, 2000,April 11, 2000, May 16, 2000, June 6, 2000, July 18, 2004, August 8, 2040, September 12, 2000, September 26, 2000, October 10, 2000, October 24, 2000, November 14, 2000, December 5, 2044, December 19, 2000, January 9, 2001, January 23, 2001, February 6, 2001, February 27, 2001, March 13, 2001, March 27, 2001, April 10, 2001, April 24, 2041, May 8, 2041, May 22, 2001, June 5, 2001, June 19, 2001, July 10, 2001, July 24, 2001, August 7, 2001, September 11, 2001, September 25, 2001 October 9, 2001, October 23, 2001, November 6, 2001, December 4, 2401, December 18, 2001, January 8, 2402, January 22, 2002, February 5, 2002, February 26, 2042, March 12, 2002, March 26, 2002, April 9, 2002, April 23, 2402, May 7, 2002, May 21, 2042, June 4, 2042, June 18, 2402, July 9, 2402, July 23, 2002, August 6, 2042, September 10, 2442, September 24, 2002, October 8, 2002, October 22, 2002,November 5, 2002, December 3, 2002, December 17, 2002, January 21, 2003, February 4, 2003, March 4, 2003, March 18, 2003, April 8, 2443, May 6, 2003, May 20, 2003, June 3, 2003, June 17, 2003, July 15, 2443,August 12, 2003. TO: BOARD OF SUPERVISORS, as the Governing Body of the Contra Costa County Flood Control and Water Conservation District FROM: MAURICE SHIU, CHIEF ENGINEER DATE: September 9, 2003 SUBJECT: CONTINUE the emergency action originally taken by the Board of Supervisors on June 17, 2003 regarding the repair of the San Ramon Creek Storm Drainage along Casa Vallecita, as recommended by the Chief Engineer, Alamo area. [CDD-CP # 03-25] (District 111) Project No.: 7520-689324-03 Specific Request(s) or Recommendation(s) & Background & Justification I. RECOMMENDED ACTION: DETERMINE that there is a need to continue the emergency action taken by the Board of Supervisors on June 17, 2003, pursuant to Public Contract Code Sections 22035 and 22050,to repair the San Ramon Creek Storm Drainage along Casa Vallecita,Alamo area; Continued on Attachment: X SIGNATURE: --AECOMMINDATION OF COUNTY ADMINISTRATOR RECOMMENDATION OF BOARD COMMITTEE 17--APPROVE OTHER SIGNATURE($): ACTION OF BO ON APPROVED AS RECOMMENDED X OTHER Septatber 9, 2003 VOTE OF SUPERVISORS x UNANIMOUS (ABSENTy } AYES: NOES: ABSENT: ABSTAIN: I hereby certify that this is a true and correct MC:tb copy of an action taken and entered on the G:\Grp Data\Const\803\2003\EmergencyBO- SanRamonCreek@Casavallecita#2.doc minutes of the Board of Supervisors on the Orig.Div: Public Works(Construction) date Shown. Contact: Mike Carlson(313-2321) C: E.Kuevor,CAO Auditor-Controller Community Development ATTESTED: Septad)er 9, 2003 PW Accounting John Sweeten, Clerk of the Board of Construction Supervisors and County Administrator Deputy R SU-BJECT: CONTINUE the emergency action originally taken by the Board of Supervisors on June 17, 2003 regarding the repair of the Sart Raman Creek Storm Drainage along Casa Vallecita, as recommended by the Chief Engineer, Alamo area. [CDD-CP# 03-25] (District 111) Project No.: 7520-5B9324-03 DATE: September 9, 2003 PAGE: 2 11. Financial Impact: The total estimated contract cost is $444,570, funded by Flood Control Zone 3B Funds. 111. Reasons for Recommendations and Background: A. On June 17, 2003, the Board of Supervisors declared an emergency and authorized the Chief Engineerto proceed in the mostexpeditious mannerto repairthe Storm Drain and Bridge. B. Repair status: The project was awarded to Granite Construction Company of Heldsburg. The construction began on August 4, 2003. It is expected the construction to be completed by the middle of October. This project is approximately 40% complete. IV. Consequences of Negative Action: Non-concurrence of the above recommendation will significantly delay repair of the Storm Drain and Bridge, prolonging impacts to local access and could result in the loss of the entire traveled way. TO: BOARD OF SUPERVISORS, as the Governing Body of the Contra Costa County Flood Control and Water Conservation District FROM: MAURICE SHIU, CHIEF ENGINEER BATE: September 9, 2003 SUBJECT: CONTINUE the emergency action originally taken by the Board of Supervisors on June 17, 2003 regarding the repair of the San Raman Creek Storm Drainage along Casa Vallecita, as recommended by the Chief Engineer, Alamo area. [CDD-CP # 03-25] (District lll) Project No.: 7520-6139324-03 Specific Request(s) or Recommendation(s) & Background & Justification to RECOMMENDED ACTION: DETERMINE that there is a need to continue the emergency action taken by the Board of Supervisors on June 17, 2003, pursuant to Public Contract Code Sections 22035 and 22050, to repair the San Ramon Creek Storm Drainage along Casa Vallecita,Alamo area; Continued on Attachment: X SIGNATURE: � 7-AEMMMENDATION of COUNTY ADMINISTRATOR RECOMMENDATION OF BOARD COMMITTEE 7 PPROVE OTHER SIGNATURE(S): r ACTION ol~ BO ON APPROVED AS RECOMMENDED X OTHER ' Sept nber 9, 2003 VOTE OF SUPERVISORS ___ UNANIMOUS (ABSENTy ) .AYES: NOES: ABSENT: ABSTAIN: I hereby certify that this is a true and correct MC:tb copy of an action taken and entered on the G:\GrpDatatConsttBO\2003tEmergencyBQ- SanRamonCreekroCasaValiecita#2.doc minutes of the Board of Supervisors on the Orig.Div: Public Works(Construction) date shown. Contact: Mike Carlson(313-2321) C: E.Kuevor,CACI Auditor-Controller 2W3Community Development ATTESTED: p 3 PW Accounting John Sweeten, Clerk of the Board of Constriction Supervisors and County Administrator B �+ J Deputy SUBJECM CONTINUE. the emergency action originally taken by the Board of Supervisors on June 17, 2003 regarding the repair of the San Ramon Creek Storm Drainage along Casa Vallecita, as recommended by the Chief Engineer, Alamo area. [CDD-CP# 03-25] (District Ill) Project No.: 7520-6139324-03 ©ATE: September 9, 2003 PAGE: 2 11. Financial Impact: The total estimated contract cost is $444,570, funded by Flood Control Zone 3B Funds. 111. Reasons for Recommendations and Background: A. On June 17, 2003, the Board of Supervisors declared an emergency and authorized the Chief Engineer to proceed in the most expeditious manner to repair the Storm Drain and Bridge. B. Repair status: The project was awarded to Granite Construction Company of Heldsburg. The construction began on August 4, 2003. It is expected the construction to be completed by the middle of October. This project is approximately 40% complete. IV. Consequences of Negative Action: Non-concurrence of the above recommendation will significantly delay repair of the Storm Grain and Bridge, prolonging impacts to local access and could result in the loss of the entire traveled way. TO: BOARD OF SUPERVISORS FROM: MAURICE M. SHI'U, PUBLIC WORKS DIRECTOR GATE: September 9, 2003 SUBJECT: CONTINUE the emergency action originally taken by the Board of Supervisors on August 5, 2003 regarding the construction of the Asbury Graphite Wastewater System as recommended by the Public Works Director, Hercules area. [SCH No. 95043029] (District 11) Project No.: 4650-6X4152. SPECIFIC REQUEST(S)OR RECOMMENDATION(S)&BACKGROUND AND JUSTIFICATION I. Recommended Action: DETERMINE that there is a need to continue the emergency action taken by the Board of Supervisors on August 5, 2003, pursuant to Public Contract Code Sections 22035 and 22050,to construct a wastewater system for Asbury Graphite, Hercules area. Continued.on Attachment: X SIGNATURE.. -`RECOMMENDATION OF COUNTY ADMINISTRATOR 1� RECOMMENDATION OF BOARD COMMITTEE APPROVE OTHER SIGNATURE(S)-"' ''— ACTION Of:BO#kq ONY septanber 9, 2003 APPROVED AS RECOMMENDED X OTHER I hereby certify that this is a true and correct copy of an VOTE OF SUPERVISORS action taken and entered on the minutes of the Board X UNANIMOUS(ABSENT V ) of Supervisors on the date shown. AYES: NOES: ABSENT: ABSTAIN: NL:rrmp ATTESTED: September 9, 2003 c:\GrpDats\Design\Board Orders\BO 20031Asbury Emergency2.doo JOHN SWEETEN, Clerk of the Board of Supervisors Orig.Div: Public Works(Design) and County Administrator Contact: J.Pulliam 393-2165 c: M.Hollingsworth,Design K.Laws,Real Property � By Deputy SUBJECT: CONTINUE the emergency action originally taken by the Board of Supervisors on August 5, 2003 regarding the construction of the Asbury Graphite Wastewater System as recommended by the Public Works Director, Hercules area. [SCIS No. 95043029] (District 11) Project No.: 4660-6X4152. DATE: September 9, 2003 PAGE 2 11. Financial Impac The total estimated contract cost is$400,000, which is 100% reimbursable from the Contra Costa Transportation Authority. Ill. Reasons for Recommendations and Background: A. On August 5, 2003, the Board of Supervisors declared an emergency and authorized the Public Works Director to proceed in the most expeditious manner to repair the erosion and failed bank slope protection. B. Repair status: Phase 1 of the project was advertised and bids have been opened. Construction is scheduled to begin September 2003. IV. Conseguences of NqgAthLeActlon: Non-concurrence of the above recommendation will delay replacement of the wastewater system until 2004 resulting in the increased potential for the failure of the existing system, which would cause effluent contamination of the surrounding area and off hauling up to 750 gallons per day of effluent to an appropriate disposal facility.