Loading...
HomeMy WebLinkAboutMINUTES - 12092003 - SD8 THE BOARD OF SUPERVISORS OF CONTRA COSTA COUNTY,CALIFORNIA Adopted this Resolution on December 9, 2003,by the following vote: AYES:SUPERVISORS GIOIA, U11KM aMMG, =VER and DeSALUiIM NOES:NM ABSENT: NO ABSTAIN: NW RESOLUTION NO.2003/739 SUBJECT: -Tabulation of Mail-In Ballots, Confirmation of Diagram and Assessment and Levy of Street Light Charges for LP 012108 County Service Area L-100,Bay Point area. (District V)Project 7394-6X5001 The Board of Supervisors of Contra Costa County RESOLVES: 1. On September 23, 2003, the Board of Supervisors adopted Resolution No. 03/576 directing the filing of the engineer's report for street light charges for County Service Area L-100. As directed by the Board, the Engineer of Work has filed the engineer's report. 2. On September 23, 2003, the Board adopted Resolution No. 03/576 declaring the Board's intention to levy and collect street light charges to operate and maintain facilities and services within CSA L-100 for fiscal year 2003/04 and setting a public hearing for December 2, 2003, which was rescheduled to December 9, 2003. Notice of the hearing was given in the time and manner required by law. 3. Resolution No. 03/576 directed the Engineer of Work (Public Works Director) to mailed to property owners within LP 012108 the notices and ballots required by Section 4 of Article XIII D of the California Constitution (Proposition 218). 4. The notices and ballots have been mailed to property owners and the returned ballots are ready to be tabulated. NOW,THEREFORE, the Board FINDS,DETERMINES and RESOLVES that: 5. A public hearing was held before this Board on December 9, 2003, at 9:30 a.m. At the hearing, the Engineer of Work presented to the Board all ballots received from property owners within LP 012108 (a proposed tabulation of those ballots). The Board heard and considered all protests against the proposed assessments and tabulated the returned ballots according to the proportional financial obligation of the affected properties. The Board also afforded to every interested person an opportunity to make a protest to the engineer's report,, either in writing or orally,and the Board considered each protest. 6. A majority protest, as defined in section 4(e)of Article X111 D, does not exist. 7. The Board hereby confirms the diagram and assessment as set forth in the report of the Engineer of Work and hereby authorizes the levy of the street light charges set forth therein in LP 012108 for fiscal year 2003/04 to be collected on the tax rolls. I hereby certify that this is a true and correct copy SE:sr of an action taken and entered on the minutes of G:\GrpData\SpDist\Board Orders\2003\12-02-03 130-LP 012108.doc the Board of Supervisors on the date shown. Orig.Dept.:Public Works Department(Special Districts) Contact: Skip Epperly,313-2253 December 9, 2003 cc: Assessor ATTESTED. Auditor-Controller JOHN SWEETEN, Clerk of the Board of County Administrator Supervisors and County Administrator County Counsel P.W.Accounting D.Morabe,Sp.Dist. Bly "AW/& eputy Resolution No. 2003/ 739