Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
MINUTES - 10222002 - C63
GENERAL SERVICES DEPARTMENT Architectural Division 1220 Morello Avenue, Suite 100 Martinez, California 94553-4711 (925)313-7200 FAX (925)313-7299 File: 135-0107/B.4.4 Authorization No. WWO097 TO: Beard of Supervisors &6WMVd— FROM: Barton J. Gilbert, Director of general Services DATE: October 22, 2002 SUBJECT: CONTRACT AWARD RECOMMENDATION' Bids for a RESTROOM FACILITY IN THE EXISTING HEADSTART CLASSROOMS AT 1001 S. 57TH STREET, RICHMOND FOR THE COMMUNITY SERVICES DEPARTMENT were received and opened at the County Architectural Division Offices on Thursday, September 19, 2002. It is recommended that the Board of Supervisors award the construction contract to the lowest responsive and responsible bidder, Buestad Construction, Inc. of Alameda, who has demonstrated an adequate good faith effort to comply with the requirements of the County's Outreach Program, waive any irregularities in such compliance and award the construction contract to Buestad Construction, Inc. in the amount of$126,612.00. Buestad's documentation of good faith effort to comply with the County's Outreach Program was submitted to the Board by the Contract Compliance Officer for its review and consideration. It is recommended that the Beard determine that Buestad has documented an adequate effort to comply with the Outreach Program requirements, that Buestad has attained a 53% Mandatory Subcontracting Minimum ("MSM") exceeding the 30% MSM specified for this project, and the Board waive any minor irregularities in compliance with the County's Outreach Program. The Consulting .Architect for the project Claudia J. Falconer estimated the probable construction cost to be $120,400.00. Other bids received were as follows: Base Bid 1. Team Commercial Construction, Inc. Point Richmond, CA $ 127,663.00 2. CJE/RTE (JV) Concord, CA $ 143,000.00 3. CBC Construction Co. Pleasanton, C.A. $ 145,500.00 1-1x2001\1350`07\011107037m.doc buestad construction44. j f SECTION# JOB NAME: TELEPHONE Bt DATEANDTIME: Inc. FIRM QUOTING: QUOTED BY: PHONE NUMBER: *- .. ADDENDA REC'D: f 2 3 5 8f 9 Section Work to be performed Amount Number of bid j CJ I 7 ll t �f 3 TOTALr, y. t BID;:. r Permit Included YES NO Sales Talc Included YES Nth Installation Included YES NO Work to be excluded fromquotation: 1 Licensed YES I NO Bond Included YES NO Insured 1 YES NC7Prevailing wade !YES NO VISIted job site YES NO Warranty Included YES NO Conn. Fees Included YES N8 Delived to site YES NO MBE WBE I SBE Veteran Delivery Date 510 5231925 tax 523 2085 768 stewart court slameda ca 94501-2100 8 3 0 3 7 6 - FOR FOR INTERNAL USE ONLY-BUESTAD CONSTRUCTION,INC. WORK PRODUCT SECTION NUMBER: �7 ectad SECTION NAME: construction P22229$�_e3 Head Mart classroom remodel RichSouth alth 5.l Rxlimord,CaSifomla tnc. - BID PROPOSAL DUE:Thursday,i9th Sant 2002 2:00 pm DESCRIPTION LABOR MATERIAL� SUB ECtUIP. € OTHER SUBTOTAL! , f 1 i i I I E i 9 I � I s t t i E i I I 9 I f 3 4 i 4 a i i , i I I 4 i i E c ' CONTACT Brian Stainer AT(510)523.1825 x265 !F YOU HAVE ANY QUESTIONS, 'VERIFY EXACT DIMENSIONS OF ALL MATERIALS BEFORE ORDERING(APPROXIMATIONS ONLY), VERIFY EXACT QUANdTIES w7PLANS 6 SPECIFICATIONS(APPROX!MATlONS ONLY), 5905231925 13%523 20$5 * SUPPLIER'S&SUBCONTRACTOR'S RESPONSIBLE TO VERIFY EXACT SCOPE OF WORK (TMS WAS 18$ SIaWBFt GIILY! PREPARED AS A HELPFULL CHECK LIST ONLY), aiamada ca 94501-2900 8 3 8 8 3 7 8 • FOR 810 PROPOSAL ESTIMATING ONLYII!, THIS IS NOT A PURCHASE ORDER andfor A SUBCONTRACT AGREEMENT " FOR INTERNAL USE ONLY-BUESTAD CONSTRUCTION , WOPK PRODUCT i• S_ECT;ON b=aestadconstructionscT!rrNMM Head ataroam remodel CO-0,e54V ~WWWl low 1001 mouth h Richmond,Californiaa! rrli inc. BID PROPOSAL DUE:Thursday,19th Sept 2002 C 2:00 pm i DESCRIPTION LABOR MATERIAL SUB EQUIP. OTHER SUBTOTAL I I s i s i i _ s t 15 I c I 6 r n , I i t$� CONTACT Brian Steiner AT 1,550)523.5925 x205 IF YOU HAVE ANY QUESTIONS, •VERIFY EXACT DIMENSIONS OF ALL MATERIALS BEFORE ORDERING(APPROXIMATIONS ONLY), •VERIFY EXACT QUAN:TiES w/PLANS&SPECIFICATIONS(APPROXIMATIONS ONLY), 510 5231925!ax 523 X85 SUPPLIER'S&SUBCONTRACTOR'S RESPONS18LE TO VERIFY EXACT SCOPE OF WORK(THIS WAS 763 Stewart Court PREPARED AS A HELPFULL CHECK UST ONLY), aiamada ca 94507.2100 9 3 a C 3 7 a FOR BID PROPOSAL ESTIMATING ONLYIII, THIS IS NOT A PURCHASE ORDER andforA SUBCONTRACT AGREEMENT PAG+." E 02 DMI oemo masters mesas iissAalt t64311rs. CA $4517 DLMOLMON PROPOSAL TO:BRIAN STMNER FAX:510 521-2095 DATE:O118/02 PM: 610 523-19281 COMPANY:i tlEBTAt)CON8l'RUCTItat�t Job NAMIt:ft�FACti.TY iN EitiB# w I lEADS T1a RT CLA MS 'RJCHMOND,CA. AcIr�R>gaas: �' $$7IaN/ART COURTJOr3 AI/DftE*B:10018.��' $3 3 $ ALAMEDA,CA.2"01ftHMOND,CA. Sccspa of Work: Dem lMon iimttsd to(see below) Vvi opi r W katSaw only Qty5 retroosss 16inch.X WX do slab trench. Based on 3 mews-ins. . #R2)Maul only concrete from above trench. Based on 3 move-Ins, LIS St, f 0.4 ly #3)Removal of I I 00fitift vaatlmastic rooms Sande 1 move-on. LIS$2,006.00 t #4)Remove qty.10 windows glass and window putty based on 2504 of Putty-3-moves. US$1,210.00 Speclaatl Provisions:All lay out,safe off and capping of utilif.iees to be done prior to move on by oat.>~m Three a clay notice prior to each move-on,Regular working hours. Standard Exclusions: Perry b, utility safe-off, capping, layout,engineering,shoring, i pedestrian, protective and dust barricades, safety railings, wall prep,floor prep, patching or � grouting, removal of glue or mastics, bead/send blasting or any work with hazardous or oontarninated materials, Special Exclusions: Stand by or delays overtime, weekend or holiday work. Excavation, back fill or Compaction. Standard QualMicationss I. Price btu on me move-ins.Additional move-ins wiH be charged$550.00 each. 3. In the event of default in any of the terrns of this contract,or in the event of xny wtioo to enforce any of dw terms testy the prevailing putty Malt be entitled to reasonable attorneys fees and suit. 3. lEtXTWMDN IS DUE AND PAYABLE WITHN 30 DAYS AFrXR L 0%.Q LR'I'It'iIV OF OUR WORK Inte=r will be charged @ 1.5%per month on past dere amounts. 4. If any dispute arises mgerdi Ag the pesforma=under this contract,the parties hereby agree to arbitrate this dispute pursuant to the constnscfion industry rWes of tate American Arbitr4on Assodabon then in effect.This provision docs not affect the right of Do=Maw,Inc.to pursue legal renuxiies for stop notices,ztttmbanics'hem and recovery against banding companies, 5. Demo Mikers,Im reserves any salvage rights on items not returned to owner, 6. The above mope of work,and exclusions are expressly the scope of the work for any subsequent subcontract except as agreed in writing. 7. 11us proposed to be incorporated into any contract regi this work.. All work to be completed in a workmwdike marmer according to standard practice. Any alteration or deviation from above specifications involviatg extra cost will be exp only Wort written orders, and will become an extra charge over and above the estimate.All agree ucuts contingent upon strikes, atccidcnts oar cis s and our control. Authorized Signature: oposaaal valoid for 30 days. Doug Pitcher i Phone, 1510.544.5270 Fait. 1510.544.5260 Live 764068 SEP-18-02 13;43 FROM-PBNHALL COMPANY 51OS578817 T-012 P.€12/02 F-529 COMPANYN�T �J Concrete Sawing, Drilling and Breaking PROPOSAL FS�TOR Kevin Heaney PHONE# ("510) 357--BetD FAX# (SIO)3.57-8817 13738 p )VA X57: StiNLEA DRO, CALIF0RIV A P4577 DATE: 9-19-02 PROJEC'T' Balboa Headstart LOCA'TTON:Richrawd CONTRACTOK Burd CONTACT: Brian PHONE* 510 523-192.5 FAX* 510 523-2085 SCOPE OF WORK- Saw,break andMI,"?;x 75and (5)I2"x 9as, 98�o=trol To sawcut only with cross cuts everryave prices basad on 3w others(we will supply vacs,and slab thickness up to 6"zhick. EXCLUSIONS: Layout/permits/protective cover and barricades/traffic and pedestrian cmuoV Overtime standby or contractors delayl locate;,, mit.and cep utxUties and or impaczl arcelss to work areas/retention/noise control/patching at demolition limits/shoring and bracing/protection of items which remain/dust control aad-or barriers/handling ofh=wdous materiaW bonds/excavation backfilling or compaction/water of'subrogatioW CONDITIONS.- Contractor to provide parking for any equipment necessary fbr conipletion of said work. Adequate access for xtm and equipment. NOTES: This proposatl to bean integral part ofany subcvntrasct between the above contractor and Penhall Ccsmpa ny. No retention to be withheld. No wads shall comnunce before this proposal is signed and rimed and/or a mutually agreed upon subcontract is issued.Payment terms are net 30 days. a'✓ REQ L DATE ACCEPTED BY DATE PEN A,..LL COW ,53750 Cataiirra Street San Leandro, C.A.94577-5502 (5117) 357-8810 PAx (510) 357-8817 Y N 'C H O S C*MCRG`C* CUTTING Mage 2 of 2 Phase 3 Electric sawn cut and remove the existing concrete slab in rooms 2 & 3. For New Sewer. 2- 10' long x 116"wide x 6"thick concrete slab. 2-2'x 2'x 61t thick concrete squares for point of connection. Electric saw cut and remove the existing concrete slab in roams 2 & 3. For New void Mater. 4- 1161,x 1'6" x 6" thick concrete squares for point of connection. Total Price 4,650.00 'rice is based on Plans Dated, 713!02, working regular hours Monday-Friday, prevailing wage, certified payroll, water control with vacuum, electric sawing the slab into pieces, hand removal, off-haul and legal disposal of concrete. 3 move-ons. The Contractor/Customer stated above (Page 1) is to provide and is responsible for the fallowing unless otherwise noted: Layout of work, standby or shutdown time where instructed by Contractor or City inspectortengineer, shoring, scaffolding, x-ray of concrete, pedestrian and vehicle traffic control (orange cones and electronic sign board), barricades, permits, locating and disconnecting utilities, excavation, compaction, back-filling, providing back-fill material, grading, trench plates, patching, engineering requirements, additional bonding requirements, handling of hazardous waste materials, plastic protection for dust or water Control and containment. Any damage to anything concealed in or Linder concrete/asphalt or in soil not clearly marked out for avoidance prior to commencement of work is the Contractors/customers sole responsibility. If you have any questions,do not hesitate to call me or E-mail C(415)716-1159 or bemiendt tgyahoo.corn Sincerely, Bernie Poppe Nichols Diamond Teal,#nu..2625 Fair Oaks Avenue + Redwood City.CA 94063. 650.364.6088 . Fax* 650.365.82z 4 Tall Free 577.642.4657 + ndtooi0oacbei#.net . License#397406 ANP mi-EtIOIL" S Providing Full Service for all your Concrete Cutting, Coring & Demolition needs! September 19, 2002 Page 1 of 2 Buestad Connstruction Company 788 Stewart Court Alameda, CA 94501-2141 Tel: (510) 523-1925 Pax; (519) 523-2085 Attention: Brian Project: Restroom Facility Existing Headstart Classrooms Balboa Preschool Restroom Additions 1750 Oak Hill Blvd. -- Pleasant Hill, CA Phase 1 Electric saw cut and remove the existing concrete slab in rooms 5 & 8. For New Sewer. 2- 101 long x 1'6"wide x 6" thick concrete slab. 2-6" diameter holes x 12`° thick concrete footing for waste line to exterior. 2-2'x 2'x 6" thick concrete squares for point of connection. Electric saw cut and remove the existing concrete slab in rooms 5 & 8. For New Cold Water. 4- 116" x 116" x 6" thick concrete squares for paint of connection. Phase 2 Electric saw cut and remove the existing concrete slab in room 4. For New Sewer. - 10' long x 1'6"wide x 6" thick concrete slab. 1 -6" diameter holes x 12" thick concrete footing for waste line to exterior. 1 -2'x 2'x 6"thick concrete squares for point of connection. Electric saw cut and remove the existing concrete slab in room 4. For New Cold Water. 2- 1161° x 116" x 6" thick concrete squares for point of connection. Nichois Dlarnond Tool,Inc.-2625 Fair Oaks Avenin - Redwood City,CA 94063. 650.364.6088 - Fax: 650.365.828,3 Toll Free 877.642.4657 - ndtoolftoacbe l.net - Ucense#397406 ** FYIR INTEMAL USE ONLY-BUESTAD CONSTRUCTION,INC. WORK PRODUCT " SECTION NUMBER: buestad SECTION NAME: Construction Head start clessroom remodel 1001 Southth St. Richmond,Ca#i?omla 116. BID PROPOSAL DUE:Thursday,19th Sept,2042 2:00 pm DESCRIPTION LABOR AIIATt.RIAL I SUB EQUIP. OTHER ; SUBTOTAL f i I je E i s 9 t � rf 7 j/ T t 1 } r s a f i f I i i f i 's 4 ? f f r i CONTACT Brian Stainer AT(510`523-1925 x205 W YOU HAVE ANY QUESTIONS, `VERIFY EXACT DIMENSIONS OF ALL MATERIALS BEFORE ORDERING(APPROXIMATIONS ONLY), VERIFY EXACT QUANfTfES w/r'LANS&SPECIFICATIONS(APPROXIMATIONS ONLY), 5105231525 tax 523 2095 SUPPLE€R'S&SUBCONTRACTOR'S RESPONSIBLE TO VERIFY EXACT SCOPE OF WORK(fH;S WAS 798 $t6W8rt 007f1 PREPARED AS A HELPFULL CHECK LIST ONLY), a:amada ca 94501.2100 8 3 8 0 3 7 8 FOR BID PROPOSAL ESTIMATING ONLY!11, THIS IS NOT A PURCHASE ORDER andlorA SUBCONTRACT AGREEMENT <.,.<..,..,.,,,..sc,v✓,:ur.z.t-rsv�oenus_urv�artvt,.rtt,+iv.3tv:... ri't1KSYHUtJLtt:f' •• SECTION K MBER: bu:Stud (SECTION NAME; construction Head start classroom remodel m m 1004 SoutRichmond, s Si, RlcRichmond,Caliaiiomia @ac. 810 PROPOSAL DUE.Thursday,49th Sept 2002 2:00 pm DESCRIPTION LAS-R, MATERIAL{ SUB EQUIP. OTHER SUBTOTAL, s 14 t i i r 4 i 7 i ` 1 E Y 3 � s I , 1 a ' 1 t 3 i n � 1 i 1 • CONTACT Bnan Sterner AT(510)523-IS25 x205 IF YOU HAVE ANY QUESTIONS, VERIFY EXACT DIMENSIONS OF ALL MATERIALS BEFORE ORDERING(APPROXIMATIONS ONLY), VERIFY EXACT QUANITI€S wtPLANS&SPECIFICATIONS(APPROXJMAT1ONS ONLY), 510 5231925 lax 523 2095 SUPPUER'S&SUBCONTRACTOR'S RESPONS;SLE TO VERIFY EXACT SCOPE OF WORK (THIS WAS 769 Stewart cour! PREPARED AS A HELPFUL L CHECK LIST ONLY), afamada ca 94501-2100 6 3 € C 3 7 6 ` FOR BCO PROPOSAL ESTIMATING ONLY!It, THIS I$NOT A PURCHASE ORDER and/or A SUBCONTRACT AGREEMENT , *• FOR IN7EERNAL USE ONLY-BUESTAD CONSTRUCTION,INC. WORK PRODUCT " (SECTION NUMBER: buestad '[SECTION NAMMEIff: construction Head start class remo9del Rich100 1 South 7thRichmond,Californiaallfrnl Inc. BID PROPOSAL DUE:Thu Sept. r2� pm ' E DESCRIPTION LABOR i MATERIAL SUB EQUIP. OT I a = I � 4 E i I i € I I o � I c i i i k I i CONTACT Bran Stainer AT(510)523-1925 x205 IF YOU HAVE ANY QUESTIONS, VERIFY EXACT DIMENSIONS OF ALL MATERIALS BEFORE ORDERING(APPROXIMATIONS ONLY), "VERIFY EXACT QUANITIES W/PLANS&SPECIFICATIONS(APPROXIMATIONS ONLY), 510 52$192$faX 523 2085 " SUPPLIER'S&SUBCONTRACTOR'S RESPONSIBLE TO VERIFY EXACT SCOPE OF WORK (THIS WAS 768 Stewart Court PREPARED AS A HELPPULL CHECK LIST ONLY), a4me4a Ca 94501.2100 6 3 8 0 3 1 6 FORBID PROPOSAL ESTIMATING ONLYIii, THIS IS NOT A PURCHASE ORDER and/or A SUBCONTRACT INIIIIIIIIIIIIIIIII AGREEMENT ** FORINTEPWALUSEONLY-BUS'STRDCONSTRUCTION,INC. WOPKPRODUCT ** SSC T ION NUMBER: buestad [SECTION NAME: construction Head start classroom remodel Rich Sod, 57th St. Richmond,Cali#ornia Inc. 810 PROPOSAL DUE:Thursday,19th Sept 2002 Q 2:00 pm DESCRIPTION LABOR MATERIAL SUB EQUIP, OTHER SUBTOTAL a IP 01 1 0 E �^ E I tf l E ' E e E i i c is � I I I 3 E CONTACT Brien Stainer AT(510)523-1925 x205 IF YOU HAVE ANY QUESTIONS, "VERIFY EXACT DIMENSIONS Or ALL MATERIALS BEFORE ORDERING(APPROXIMATIONS ONLY), p VERIFY EXACT QUANITiES w/PLANS&SPECIFICATIONS(APPROXIMATIONS ONLY), 510 5231425 fax 523 N85 SUPPLIER'S 8 SUBCONTRACTOR'S RESPONSIBLE TO VERIFY EXACT SCOPE OF WORK(THIS WAS ��!! 198 Stewart Court PREPARED AS A HELPFULL CHECK LIST ONLY), alamada ca 94501.2100 3 3 8 8 3 7 8 FOR BID PROPOSAL ESTIMATING ONLYIi I, THIS IS NOT A PURCHASE ORDER and/or A SUBCONTRACT AGREEMENT d3 MW /0457440 401> j alWw 'd Plumbing & Heating, Inc. Contractor's License No. 792404 �` ' �"�► 281 Arthur Rd. * 925 372-0 925 372-9448 * Marti ez, CA 94553 `VI FAX BID To: Buestad Construction, Inc Attention: Project: Balboa Preschool Restroom Addition Date. 09/18/02 Richmond CA Telephone; 510 523„1925 Fax No. 510 523-2085 Section(s)/Trades 15050 15140 15150 15400/Plumbin plans&specs Furnish&Install_ X FCB Jobsite X Install Only__ _Tax Included _�C Addenda: None 1 2 )C 3 4a,____-w-_5_—6-7-8-9 Champion's is a union shop that pays the prevailing wage and is bondable. We do not have minority status. Bid includes: All waste, Mater, gas and finish as per plan page's A3,P1,P2 and P3 to paints of connections, p---µ---- .�",-7'7•, i5 otal $37.025.00 13;di Addl(Deduct) ALT# Concrete Cutting, Corinq and Removal (olumbing ditches onl 6,681.00 ALT# Dia & Backfillina both Interior& Exterior trenchin This includes salad & rockl No patching,(plumbing ditches only) 7-b EXCLUSIONS: No fee's, no permits, no sawcutting, removal disposal or patching of concrete and asphalt. No demo of existing conditions. No offsite disposal of spoils. All work to be done during normal working hours (no overtime Or premium time). By. n Champion stimator AN SECTION NUMEER: buestad corstruction SECTION NAME: MHead start classroom remodel 1001 South 571th St 06�7 e%o ��� Richmond,California G- ine. BID PROPOSAL DUE:Thursday,79th Sept 2002 2:00 pm I DESCRIPTION i LABOR MATERIAL SUB EQUIP. OTHER SUBTOTAL rpl , Gt V 14 .o..r- 4 V UP s s ' s B i � s , r i i i I S -- i I i r 1 f k 1 I i I � I C . c I 1 i i f CONTACT Brian.Stainar AT(510)523-1935 X305 IF YOU HAVE ANY QUESrCNS, ` VERIFY EXACT DIMENSIONS OF ALL MATERIALS BEFORE ORDERING(APPROXIMATIONS ONLY). `VERIFY EXACT QUANMES vdPLANS§SPECIPICAT:CNS(APPROXIMATIONS ONLY), 510 523 11,125 faX 52;3'2:85 SUPPLIER'S 3 SUBCONTRACTCR'S RESPONSIBLE TO VERIFY EXACT SCOPE OF WORK(THIS WAS 788 3tawart court PREPARED AS A HELPFULL CHECK LIST ONLY), alameda ca 94501-2100 8 3 8 0 3 7 5 FOR BID PROPOSAL ESTIMATING ONLY:11, THIS IS NOT A PURCHASE ORDER anWar A SUBCONTRACT AGREEMENT s• FGR INTERNAL USE ONLY-B UESTAD CONSTRUCTION,INC. WORK PRODUCT " 'SEC T EON NUMi3EFt: bixestad SECTION NAM construct10�7 E: MHead start classroom remodel ® 1001 Southth Richmond,California1rti Inc. 8115 PROPOSAL DUE:Thursday,19th Sept.2002 2:00 pm DESCRIPTION ! LABOR MATERIAL SUB ! EQU1P. ( OTHER I SUBTOTAL ° I I ° s ! i I E 3 ° -- 1 I ON, AV low -------------- i E i ' � I i s ! 1 I 's r i } I o I E I CONTACT Brian Steiner AT(516)523-1925 x205 IF YOU HAVE ANY QUESTIONS, VERIFY EXACT DIMENSIONS OF ALL MATERIALS BEFORE ORDERING(APPROXIMATIONS ONLY), •VERIFY EXACT QUANITiES w1PLANS&SPECIFICATIONS(APPROXIMATIONS ONLY), 510 5281925 Rax 523 2095 "SUPPLIER'S&SUBCONTRACTOR'S RESPONSIBLE TO VERIFY EXACT SCOPE OF WORK(THIS WAS 799 atawart nw', PREPARED AS A HELPFULL CHECK LIST ONLY), a;amada da 94501.2100 B 3 a a a 7 a FOR 811)PROPOSAL ESTIMATING ONLYIII, THIS IS NOT A PURCHASE CROER and/or A SUBCONTRACT AGREEMENT FROM :!TGNUM JtTAE FAX NO. :5104444930 Sep. 19 2002 09:35AM F1 Llgnum Was 16251 Fath SU"t CO2oMao-X1M Oakland, CA 94607 Contractor's license #651251 Phone(510)444-2030 Fax(510)4444930 Proposal Date 08/19/02 To: Duestad Construction 768 Stewart Court Alameda,CA 94501-2100 Phone(510) 523-11;25 Fax(610) 523-2085 Attention Brian Stainer Project Id : n/a Project Dose, : Headstart Classr000ms Ship Ilia : Our truck Terms Deposit and progress payments P.U. Number n/a Delivery Date : n/a Salesperson : Jim Martin 1001 South 57th St_, Richmond Cabinets and counters icor five classrooms as shown on plains. Exteriors to be Paint Grade. Doors to be Slab style. Drawer fronts to be slab style. Interiors to be Melamine. Hinges to be Blum. Drawer slides to be Blum 314 extension, Standard filler to be 1-1/2". Finish by others.Standard 4"wire pulls, brushed chrome. Countertops standard wood grain plastic laminate similar to existing. Delivery date will be determined upon approval of shop drawings-8 geek lead time from date of approval. Item Unit Sales No Description Qty Unit Cost Price Tax Cabinets&Counters 10.029.56 827,44 Delivery and Installation __� � � ®_ 3.640.80 SUB-TOTAL 13,670.36 SALES TALC 827.44 e 1, N ' � t TOTAL 'Please_Notw Pd=_valid fo O gave. We propose hereby to furnish material and labor,complete in accordance with above specifications. All materia!Is guaranteed to be as speclfied. All work to be completed in a workmanlike manner according to standard practices. Any alteration or devlation from above specifications involving extra costs will be executed only upon written orders,and will became an extra charge over and sbove this es#mate. All agreements c:ontingsnt upon strikes,accidents or delays beyond our control, owner to carry fire,tornado and other necessary insurance. Our workers are fully covered by workman's Compensation insurance, You,the buyer,may cane this transaction at any time prior to midnight of the third business day after signing this agreement. Cancellation must be done In writing. Auftrtred Signature Acceptanca of Proposal The above prices,speciftoafione and conditions are satisfactory and are hereby accepted. You are authorized to do the work as Specified. Payment will be made as outlined above. Accepted, 8usstad ocrtctruction By: Date: I , UU it4i MLI— Alk ANIL n7a 6)W54W WALTER U. LUN1NG SAMARCHrMCTURAL CASEWORK MFG. UC, Deo a DETRcrMAVENUE GONWRD,CAUFO MIA 9018 (825)686-1773 FAX(921St'685-1774 ESTIMATE Date; 09/1$102 To; BUESTAD CONSTRUCTION BRIAN STEINER From; A.C.M.(Architectural Casework Mfg) Ref, RESTROOM FACILITY HEADSTART CLASSROOMS 1001 SOUTH 57 TH ST.RICHMOND,CA FURN & INSTALL CASEWORK PER PLANS & SPECS # 64000 & 64150 BASE CABINETS,PAINT GRADE , P-LAM COUNTERTOPS REWORK EXIST CAB $ INCLUDES ADD # 1 EXCLUDES; ALL DEMO ALL PAINT TRIM AND WALLCAPS SWING GATES TOTAL ESTIMATE $ 16x$00.00 ( TAX INCLUDED ) . v v ....�.s�...assu + 1 ►llt3C� ttitlti P. V CABINET SHOP ( -- , September 19,2002 QUALITY CUSTOMlax , � SAO -- sf2*b - i.... A .L RE: Restroom Facility Head Start Mass e Addendum 1 and 2 Inclusions: 1) Section 06410 Plastic Laminate casework and countertops at rooms 2, 3,4,5,and 8. 2)Fall cap, .�Y: 3) W.I.C. certificates, tax, and installation. , i�- wa y 1) Gate �= �q Thank you for the opportunity to bid your project. If you should have any questions air• please call me at(408)235-7685. Sincerely, Kemal Redzic Project Manager X r'tt f3 1 7 kp 330 Martin Avenue,Santa Clara,CA 95050-3112•Tel: (408) 235-7685 Fax: (408).235.7686,;-:. License No. 615098 CALIFORNIA CABINET AND STORE FIXTRE, INC. 6472 CARBIDE COURT SAC41AMENTO CA.0829 Phcm918-3W1W Fast 918 3MIUe State C,ontraatoes Lioett" ftmu SCOPE SHEET DATE. Sgte tuber 189 2002 SUBMITTED TO: BUES'IAD CONSTRUCTION FOR: BALBOA PRESCH02L RESTROOM FACILITY IN EXISTING HI ADSTART CLAssRoomS R CHIND We hereby propose to furnish all the materials and perform all the labor n+EaCessary for the compiwon of: SECTION 8200-FINISH CARPENTRY. SECTION 6410-CUSTOM CASEWORK. INCLUSIONS, (5)CLASSROOMS,(3) PHASES. NEW BASE CABINETS WITH DRAWERS AND COUNTERTOP,MODIFICATIONS TO EXISTING CASEWORK&COUNT'ERTOpS,HARDWOOD TOP CAPS, HARDWOOD WINDOW SILLS,WOOD SWING GATE AND JAMB/CASINGS, ALL WORK is PROVIDED FURNISHED AND INSTALLED WITH APPLICABLE TAXES INCLUDED. EXCLUSIONS, PAINTING,STAINING OR LACQUERING; FRP/WAINSCOTS, FINISH HARDWARE EXCEPT THAT INTEGRAL.TO CASEWORK- ADDENDUMS NOTED:TWO 1 TOTAL CASE PRI Sinc'ssr*, California Cabinet and Store Fixture Inc. S. REX OSER 1Y�� 6/. " - we seen 3"FIR3MME by the actor's State ficarmad Board. "cuestione a owvocw may be rehrred to ttw regis v of the t who"wdra"is: s State Ucwse Board,P.O.Bent 28000,Sraramenio,CA $6826 Note: This proposal may be withdra"by us If not scoapted within days. " rUAllVJPt/YAL'✓JC UNL!•VUCJIAULUtV31 AUL[1V[Y,11YL. YYUAA YICUUUL.f •' _ SECTION NUMBER: construction seaTioN NAME: A Allialffr Head start dams rAW aom remail 'ALI Ar - - low 1001 South57th St. Richmond,Callfomia BICE PROPOSAL DUE.Thursday,I tf+Sept 2002 2:00 pm j DESCRIPTION LABOR MATERIAL SUB EQUIP. OTHER SUBTOTAL l , f I IA i i I i I • E i ! ' f ! ! s i ! ! e E , I ! I ! I I I I i I i i I ! ! " CONTACT Brian Slmmar AT(5tO)523-+928 x205 IF YOU HAVE ANY CUEESTIONS, VERIFY EXACT DIMENSIONS OF ALL MATERIALS BEFORE ORDERING(APPROXIMATIONS ONLY), °VERIFY EXACT QUANIT;ES W/PLANS&SPECIFICATIONS(APPROXIMATIONS ONLY), 510523 jr?.5 faX 523 2085 ` SUPPLIER'S&SUBCONTRACTORS RESPONSIBLE TO VERIFY EXACT SCOPE OF WORK (THIS WAS 768 Stewart 60Jrt PREPARED AS A HELPFULL CHECKLIST ONLY), "lameda ea 94501.2100 ® 3 8 0 3 '7 6 " FORBID PROPOSAL ESTIMATING ONLYM, THIS IS NOT A PURCHASE ORDER and/or A SUBCONTRACT AGREEMENT �... w� a.... .. ..., -rvim.0 w � r nn ray= 4 aF G '°.LJ4L+4 wrr� ECONOMY LUMBER COMPANY 750 High Street 0000 Oakland, California 94601W2 (510)26166100 • FAX (510)261-6101 customers Job Xa=e or Addre®o: Account No. BLTESTAD CONSTRUCTION READ START RESTROOM DOORS •EST2MATE* 88 765 STEWART COURT 1001 SOL,"TH 57th STREET Est. No.-- } AWUMDA CA 94501-31 RTCHMON'Ts, CA Eat. Date 59505-02 - �7 09/19!2002 Bot. Dste Reference Information Estimated By Exp. Date Pa e ISSEP02 € BRIAN STEINER JIM McXILLAN 01/01 e Quantity Description Resat Units loaut i t i 5 3043x1-3/51° SOLID CORE BIRCH 0699 5.0 139.20/EACH( I 696.00 t , DOORS, PREHUNG ON 4-9/16* PG E ! I i E .'AMBS %*ZTH POLISHED CHROMB j t SPRING X111GES. i i t , All DOORS MUST BE PZXISHED ON i ALL :3?E \(6\) SIDES.... PROMPTLYI i f PREHLTNG DOORS ARE NON-A21.7URNABLE ° IVES 401-1/2B26D WALL BVXPER 0409 5.0 11.40/EACH ; 57.00 WITH-Oum. xro., NO LTSCX ON 8237L%-IL, TO-ONE RECOGNIZES JUST THE YF.R F! 5 SCH. AL40S-SATURN-626 PRIV LOCX 7853 5.0 97.40/EA 487.00 \(04095002 \) �rxi-Taxable TaxableALAMBIIA Total i 0.00 1,240.00 0.00 0.00 0.00 102.30 A FINANCE CHARGE OP % PER MONTH 96 A.-ITNUAl, or. PET2CE3E on will < "J ,.a�trgr�eci All Accounts Pest Z7ue, �J'L�+�`' FROM :ComPl ete DOOr SYStems FAX NO. :9252i522A1 Sep. 19 2002 12:24LPM Pi Page 1 of 1 >> Complete Door Systems PO Box 2092 Danville, CA 94526 (925) 743-9551 Phone (925) 215-2281 Fay, Proposal To All Prospective Bidders Project Headstart 2 � , Architect Claudia Falconer, AIA Architects Date 9/19/02 We hereby submit a proposal to supply the follo%4ing material. 8211- Flush Wood Door — Addenda 1 indicates the widths if these doors to be 3' wide per ASK.1. The addenda also cells for the gate ripenings to be 4'2» (h) x 3'V (w). We have bid these openings as 3042 as we believe that this is intended. Changes in size can result in nominal price cdhanges. 8710- Dear Hardware Court: 5 openings Lead times: 04� FCB Jobsite, Tax included thousand three hundred and eighty four dollars Terms (ern approval of credit)2%10, net 30 Addenda acted: 1 Standard Exclusions: storefront hardware, gate hardware, hardware for cabinets, wood trim bituminous coatings, operation of existing hardware, glass and glazing, wall louvers and field measurements. This quote is per purrs and specs. Any additions or modifications of this project will require a signed purchase order before delivery of material, 8t�Sk— t� 14 Ju4in Gosnell i Date Quote is valid for 30 days Page I of i SECTION NUM13ER: Alft buestad - LOFIStfl:CtfGY2 SECTION NAME: Head start ctassro odal Rich South 57th Richmond,Ca;IfcMcnis Inc. BID PROPOSAL DUE:Thursday,I to Sept.2002 @ 2.00 pm r !DESCRIPTION LABOR I MATERIAL SUB I EQUIP. OTHER ' SUBTOTAL11 I f , FA AA I 1 E 1 I E a s ' s s E 3 � s t ! I I 1 r I J i I I I I I 9 I i ! I I � I I I I i 1 ` CONTACT Brian Stainer AT(510)523.1925 x205 IF YOU HAVE ANY CUESTIONS, VERIFY EXACT CIMENSIONS OF ALLMATERIALS BEFORE ORDERING(APPROXIMATIONS ONLY;, VERIFY EXACT QUANITIES w/PLANS&SPECIFICATIONS(APPROXIMATICNS ONLY), x10 5231925 fax 523 2055 ` SUPPLIER'S&SUBCONTRACTCR'S RESPONSIBLE TO VERIFY EXACT SCOPE OF WORK (THIS WAS 766 §tawart =r1 PREPARED AS A HELPFULL CHECK LIST ONLY), Vameda ca 94501.2100 6 3 1 C 9 7 1 FOR VC PROPOSAL ESTIMATING ONLY!!!, THIS IS NCT A PURCHASE ORCER and/or A SUBCONTRACT _ .. AGREEMENT • P'ORiNTERNAL USE ONLY-6UESTADCONSTRUCTION,INC. WORK PRODUCT SECTION NUMBER. huesta s�TroN NAME: construction 6 It Head start classroom remodel R991 Souu,1 57th SL Rlahmard,Callfarnia Inc. 810 PROPOSAL DUE:Thursday,19th Sept 2092 2:00 pm i DESCRIPTION LAEORMATERIAL SU8 EQUIP. OTHER ( SUBTOTAL 3 E i i r ! E f ------------- I i ( i ° i 1 ° t I i I t ° " CONTACT Brian Steiner AT(510)523-1925 x205 IF YOU HAVE ANY QUESTIONS, VERIFY EXACT DIMENSIONS OF ALL MATERIALS BEFORE ORDERING(APPROXIMATIONS ONLY), • VERIFY EXACT OUAN!TIBS w1PLANS 3 SPECIFICATIONS(APPROXIMATIONS ONLY), 5t0 5231925(ax 523 2OBS SUPPLIER'S&SUBCONTRACTOR'S RESPONSIBLE TO VERIFY EXACT SCOPE OF WORK(THIS WAS 198 Stewart couiR PREPARED AS A HEL?FULL CHECK LIST ONLY), cam-da ca 94581.2100 6 3 8 Q 8 7 5 FOR SO PRCPOSAL ESTIMATING ONLYIII, THIS IS NOT A PURCHASE ORDER and/or A SUBCONTRACT AGREEMENT 13I MML—U V ALI—M Y UK Y WAL0 i�'Hlwi;. •. i Ate' • t s t i {{rA t E •' ' f Date. 1 Page 1 of To- l corn au == AT> Fax # s"1 f _ --;` ` Fax Transmit al Sheet From.. '•c� $135 Port Chicago HWY.,, Concord,CA 94520 Phone N {925} 827> 41178 . Fax # (925) 827-1583 P- 5 -5. FRAMING &DR'YWAL Install approximately 501E Type 2x4 16"o/c DF stud wall floor to existing ceiling. Install approximately 1301f. Type 2x4 16"o/c DF stud low height wall. a. Install 5/8 Gypsum wallboards,rine-sides interior walls from floor to existing ceiling. b. Install 5/8 Gypsum wallboards,berth-sides low freight walls. c. Drywall tape&finish to be level 4 spray knockdown. d. Excluding all existing building perimeter wall framing. 6. RESTROOM ACCESSORIES-S4,564.00 x`47 5e,)J C e � Supply &Install restroom accessories approx. (401tems). a. (5)ea. of Mirror B-2906 18"x24" b. (5)ea.of Paper towel dispenser B-318 c. (5)ea.of Strap dispenser B-8225 d. (5)ea.of Grab bars B-68137 e. (10)ea. of toilet paper dispenser B-3888 f: (10)ea. of toilet paper seat dispenser B-221 LEAD TIME OF 34 WEEKS FOR CONTRACT,INSURANCE AND MATERIAL. We look forward to working with you. This proposal may be withdrawn if not accepted within 30 days of above date;it is subiect to and includes all terms and conditions on the face and attached shuts and any other to s that are mutually agreed u o . Thisuote shall became part of an attachment of the issuinna contract. Contract Price$ 17,896.00 Accurate Interior Systems&Construction, Inc. Acceptance Date: $ Title: PM/Estimator B By: DaEZI Kral Title: Approval Date Terms and Conditions The Work: Accurate Interior Systems&Construction,Inc.will supply all work described on the face of proposal in accordance with the playas and specs. dated of proposal. Schedule Change:Accurate Interior Systems&Construction,Inc.'s obligation hereunder is basad upon the Schedule, both as to duration and sequence. In the event of any significant change in Schedule,whether permitted by the Bid Documents or not,the bid price and Schedule shall be equitably adjusted.Accurate Interior Systems&Construction,Inc. shall also receive an equitable adjustment of the bid price if this contract is terminated otherwise than for Accurate Interior Systems&Construction,Inc.material breach. Worn'Week: Accurate Interior Systems&Construction,Inc.will supply labor for the work on a regular 40-hour week without any overtime. if the Customer requires overtime, Accurate Interior Systems&Constriction,Inc.will be reimbursed for the premium portion of wages paid(including payroll taxes and insurance);plus a reasonable allowance t _ for loss of productivity cause by the overtime. g � G. Accurate Interior Systems & Construction, Inc. 8464 Shadetree Drive Windsor,CA 95492 Cell Pbone707.975.5233 Phone&Fax 707.837.2871 CA LIC#803367 PROPOSAL To: General Contractor Dpjq September 19, 2002 Ams: Estimator Sheet lof3 ArcliitectlEn inter: Claudia Falconer Job Name: Rotroom Eadlity in Headstart Classroom Q'1001 S 57h St.,-Richmond CA 94804 Thank you for the opportunity to quote this project. We propose to famish and install FRP panels, framing&drywall and restroom accessories plans Dated.July 8,2002. Our price is based on clarification staters in this proposal and is conditional upon acceptance of mutually agreed terms and conditions. 1. All work is to be performed on straight time; sequentially,with all work areas to be free of obstacles to production. 2. Protection of work is to pass to the general contractor after completion of each phase of work. 3. EXCLUSIONS a. Exclude any and all building permits of fees. b. Excluding cost for any and all insurance waivers of subrogation. c. All hoisting and dump rains are specifically excluded from o-w base bid for this project. & Any and all patching of fireproofing or insulation. e. Any and all testing for our scope of work. f. Any and all shop or as built drawings. g. Any and all engineered drawings. h. Any and all caulking or sealants. i. Any and all wood framing, blocking or backing. j. Any and all temporary lights, power, & water. k. Any and all overtime due to compressed schedule. 1. Any and all backing to be provided by others for all scopes. in- Any and all insulation by others. 4. FRP PANELS 53,399.110 a. FRP panels to be installed with Sequentia class C non-fire rated. b. Installation of FRP wainscot 48"AFF in restrooms only. c. Installation of FRP panels in restrooms to have vinyl trim. d. Installation to be prior to fixturization of all plumbing&hardware. e. This quote does not include any cost for FRP work that may be caused by other trades damaging or removing FRP in order to perform their own work. .6 SECTION NUMBER: bue5t3d S€CTION NAME: construction Heald start class m remrad �. 1001 South 57th St. Imm Richmond,Calliomla ix BED PROPOSAL[TUE:Thursday,19th Sapt.2002 A_2:00 pm DESCRIPTION LABOR MAT€RIAL SUE EOU!P. OTHER � SUBTOTAL s as i daft ' e E ! ! 1 I I 1 E I � I _ E l s I _ I 1 { E M I i I 1 I i � I l 1 I ° CONTACT?-in Steiner AT(5 10)523-1925 x205 IF YCL'+AVE ANY ODES,,T IONS, VERIFY EXACT CIMENS!ONS OF ALL MATERIALS BEFORE CRCERING(APPROXIMATIONS ONLY). ` VERIFY XACT OUANITIES wIPLANS 3 SF ECIF!CATIC NS;APPROXIMATIONS ONLY), „1D 5261 ! Eaz Std�:'°5 SUPPLIER'S 4 SUBCONTRACTOR'S RESPONSIBLE TO VERIFY EXACT ScOP°OF`NORK(THIS',VAS 768 llawarc court PREPARBC ASA HELPFULL CHFCK LIST ONLY), atamaia:a 9450t2tOQ 3 8 Q 3 7 6 a FOR 310=RC PC SAL ESTIMATING ONLY!!!, THIS IS NCT A PURCHASE aRCEA and/or A SUSCO'1TRA.CT hGRa-AE'?T FROM FAX NO. Dec. 24 2001 09.11AN P1 so $ Say Floors 2221 Co=mer ce Ste. J Cord, Ca 94821 Phone: 926-687-7171 Fax: 926487.0210 BID TO: Gemral Conmetot J013 NAME; Head startCiaswoonn ADDRESS: LOCATION- 1601 S.57th Street.Pichmond,Cas CI?Y : DATE- 9/19102 -PHONE : TIME., 2,00 P.M. FAX: PROPOSAI- seditan 009wo Section#09 > ease /3,d STANDAPOS AND EXCLU39M i.THM 00 EXCLU'JES DEMOLITION,UNLE$$NOTED OTHeWASE 01 ANY EMSTIM MATERIAL.. CLEAWNG,WASINO AND REMOVAL OF TOPICAL.TREATMENTS, Z, ALL MOISTURE TESTtNO AND TREATMENTS ARE Ek,CLL3t5ED. 3. ENVIORNMENTAL cOwmcNS DIIUST$E MAINTAINED AT 05 OF-Cage.2 DAYS lia?rORE AND CONSTANTLY AFM INSTALLATION. 4, EXTENSIVE F=R PREPARATION tis F=WOED FROM THIS BED. TME SUBSTRATE FAUST BE SATISFACTORY AND`iVt7I.3lN INflEtVRY TOL NCE OF IW IN IV ANIS FREE FROM CXACXS AND F PgVEATIONS OF MORE THAN VW DEEP. UNLEM NOTED OTH RWIM£. 5.SAY FLOORS WILL REmoVE ALL OF!TS OWN 3O$GENERATED DEEM& CHANGES TO CONTRACT OOCUMENTS AFTER SID WILL BE ACORESSED 0Y OWMGE ORDER. �r:.iahri ziu-0041Cs44 ANDERSON CAOET& LINOLEUM SALES Co., INC. PROPOSAL AND 4101 BROADWAY 1lVAY A + E 'TAN E C1A L..A.Nb,CALIFORNIA 84t�'L 1 PHONE, (510)962-1032 + FAX: (610)652-6344 Cc►ntractoc's Lie. G15 242102 k 1 A'I`T'Lv: 13RLAN ! -0 07 PROPOSAL SUISM1"4 TW TO I PHONE FAXClATe SUESTAD CONSTRUCTION 523-1925 523-2fl 5 9119/02 'J STREET JON NAME t 763 STEWART COURT BALBOA PRE-SCHOOL CITY,STATE AND ZIP CODI I JOE LOCATION ALAMEDA, CA 945C3t RESTROOM ADDITION ARCFlT UCT DATIS iPHONE t E11LSL L QUOTE )tie ttarsby submit agsctflcatlotta and eodmates f'r. I TO FURNISH AND +TALL ARMSTRONG STANDARD TILE(ONE COLOR., 1,100 SQ. FT.) IN R60M 5 WITH 4"T' OPSET BASE, INSTALL ARMSTRONG STANDARD TILE AND 4"TOPS'J T EASE IN (5) SATHR90MS. BASED ON GENERAL.FLOOR PREP ONLY, (3) PHASES, PREP TO THE TRENCHES IIN THE BATHROOM. EXCLUSIONS'WAXI�G, PROTECTION,AND MOSITURE SEALING. { t i JTAL PRICE, INCLL tDING SALES TAX �II CALIFORNIA ONLY, NC VOW TO OWNER: cans tc�s are reguire4 by law tst ,.&iiCe woc an4 rogule#sd by the oo".cws,stats ilmnse 00ard, Any gUOS 3 ,%oonCOM,102 a E7arar#tdf r»ay be ratorrea,to tho regWmr of+rta a{tard whoss Address Is: �r a Sin ` `' =3132 dg"w` Unless otherwise stated,this proposal is limited to normal floor-prep, 9 PE'CpoSe herby to f4rnish trtetertat and Iabcr—compiats in acoetdanc+e w4h suave specAiWons,for the sum of: ral:ars $5,647.00 Psyment to be made as tsatloW Net 94 da s k I h!!matins I g tsranteed to Ise 0 5060*4 Al warK to be comptsm et a woriCmorttiks mOMW Atathcartzed swom#v'ta s%WvW(1pr6Ao ta, Any pftrat on or osmsuan RM s ons tmrotvtrta Owe Signature rust:wtt m oxiotaid onEy upon wnpmt at4eq,am visa t aooms on ex" a aw and atnn+o Ina : ALrL�L� t WALLACE "T!t,)tete. A4 spree tiar';tn wt�;tngent,Con Skit a,U006n4s Of tteiays haYund our control. C*rw% ' St rod By arty»rs to,-mov Aro atnw?WL***#sy Sngi{rAmc*' our woritwe Ana f.4v C�uereA by VskltKr4 s "amoa�€azxxt do a anoa. Now This proposat maybe { wltrtwrawn by Its it not socapm whiten 30 days. Acceptance0f PrOPO$aI —The afore prtcee,specillcatlons end conditions am soofactori std are tiwe sy aceepw, You are authofted signature to do the work as specfis4. p*rnsnt w4i be rnsde as cutiirt+ed above. Of Acceptance � Stgnah to t FROM : F i NNEY'S FL.SCR f ' PH-ONE NO. : 203 832 8333 Sep, 18 2002 04:20P f P2 RANDAL M FINNEY 7700 1 Y_ jljjjj��OIAX'_(20K& FINNY_ 'S FLO01INC. Neste: B6estad Conn Inc. Attna Brian Phone# (510)523-1925 Address:758 Steward Court f=ax# (510)523-2085 Cltys,�itt rn a State.CA Zip:94501 t3nderlayment Cement Terms: ice: 09118102 PROPWAL 1 5 Job,Site: Restrooms at Head Start classrooms 3 1001 S. 57 Th.St. RichmondLU t� Authorization No. WWO097 6cape.of Work: Supply and install Ar nsb°csncg standard Ecelon and 4 inch top set base p in fhe new restrooms in classrooms 2,3,4,5,and 8 and entire classroom number 5. Addendum's 1 end 2 noted. -146te..Ibartitot guarantees color mete t to existing resilient tiles. Colors must he Ott by end tars, work to'ba done In gree phases. Irtctustorte:: Tax,freight,normal woriung hours,standard fluor preparation,tnecse ry�trrseraifiatnS. exclusions: After hourl weekend work,non standard floor prop ra ion,demo,moving any fI equipment 1 f res'(area must clear). Instal 6on'*ha g be#t s cordawe wrth the Batt meogriked slandwd SPOOkO to 7S. 004ya tt r a ny cetze beyond Wars canbol eXCuses•perfarrnance during ft #say dofd .F'ast�i ateitsa�#f8 b Arl+tte at 18%perarmum,and#7 the eventofde�talofpsynwn Stowra r to pay at castsofcoiieebbn,fin,and urluciu�ts�toir�8}+'s tees Tele above rrrttteriafs tv rerxta+tn lir sur po$ses�an urt67 p�ii far�frill, idsystand. pr 6"dry raft k&Aides wV unforemen d&mages(unt®ss oftrw"noted above)whish nY be disc avated onjob,aLch as unman dryrat or .=rtsiiile•derr>,ege. repeks wai'be brorlght to rrsy Vit ,�raritepewrs sn8 aessfs amgmeet arty eppa�rvaat.'1;5t,�r►et br`d�r�dTOr want e&u'ae M this pdintis ttpeyable to�elJer.. Contract Accepted by: Bate: SECrON NUMB€FR: S�CTiaN NAME: construction Head start Glass P' emo �7fae5t3� low 1001 South 57th St Richmond,California BID PROPOSAL DUE:Thursday,19th Sept 2002 2:00 pm I . DESCRIPTION LABOR MATERIAL SUB EQUIP. f OTHER SUBTOTAL -� AP lor i e I I a i i_ S , i i 1 P , i e I s 1 t i t I I I � I ' I I I I I 1 � 1 CONTACT?ran Stainer AT(510)52}9925 x205 IF YOU HAVE ANY QUESTIONS, `VERIFY EXACT DIMENSIONS OF ALL MATERIALS SE50RE ORDERING(APPROXIMATZNS ONLY), `VERIFY EXACT CUANITIES w/PLANS S SPECIFICATIONS(APPROXIMATIONS ONLY), 510 523,925 fax 523 2085 SUPPLIER'S 5 SUBCONTRACTOR'S RESPONSIBLE TO VERIFY EXACT SCOPE OF WORK (THIS WAS 768 Stewart cart PREPARED AS A HELPFULL CHECK LIST ONLY), aldmada Ca$4501-21,00 3 7 5 ' FOR 810 P.3CPCSAL ESTIMATING ONLYM, THIS ISNOT A PURCHASE ORDER and/or A SUBCONTRACT AGREEMENT SATELLITE TELLITE PAINTINGINC. dppVggS3tIAU o CJIWv4{{triL + RESIDENTIAL ?.0. BOX 361641 + A[lPiFAS. CALfF{323A LIC. 45613$8BID FAX FORM 510/656-8020 j802 /656-2032 JOB NAME; RESTROOM FACILITY _@ HEADSTAR.T CLASSROOM BID DATE-9/19/02 LOCATION: RICHMOND TIME: 2 P.m. ARCHITECT:: CLAUDIA FALCONER PHONE: ( 51 0) 530-4053 DRW. MATE; 7 ! R12 ESTIMATOR: .* REV. DATE. f ! SECTIONS NO. NAME I PRICE NO. � NAME t PRICE 13lGLUf3ET7: PAINTING ( I r s ADDENDA: 0 MBE CERTIFIED BASIC BID OPEN SHOP SCALES TAX INCLUDED LICENSE NO. 583898 ALTERNATES NO. DESCRIPTION PRICE `•, 09900 PAIN-TING I i INCLUSION$ 1 PAINTING WALLS AND CEILINGS AT FIVE CLASSROOM RES` ROOMS ALL WORK PER P.D C.A. STANDARDS EXCLUSIONS CLASSROOM PAINTING WINDOW MULLIONS BID TO CONTRACTOR PHONE NO. CONTRACTOR PHONE NO3 ---------- �,a.issn ".!1 S.l lkJ _. .r-Hknr_ C. _... _... 09117102 020 OR ROOO J. Darden Painting 4861 Surprise Dr. Suite 1€17 Martinez,CA 94553 (925) 229-9401 Fax(925) 229-9501 Proposal Section: 09900-Painting Project: Restroom Facility in Existing Haedstgrt Classrooms To: All Interested Generals J. Darden Painting proposes to supply labor,material and equipment necessary to complete the above-mentioned project per plans and specifications. Clarifications and exclusions are listed below. Payment is due upon completion of work. Acceptance of this proposal will become an exhibit in the contract. Proposal is void in 10 days unless notified in writing of intent to eater into a contract. Adde-odu= 1 Base uricswoop � Clarifications Paint to be installed before any and all finished items. All surfaces to be cleaned and ready to receive paint finishes. All surfaces may or will be sprayed. All items to be painted are to be installed prior to start of painting. Three phases. Exclusions Damaged or defaced surfaces. Surface acceptance clause. Defective surfaces. Heating_ Bends. Remove and replace hardware, electrical,meebanical, plumbing. Piping and equipment color-coding, identification., banding, flaw marks. Caulking and sealant. Unprimed ferrous metal. Back priming and priming end cuts. Damaged shop coatings. Additional coats. Stipple. Alkyds. Back rolling. Site work. Patching and repairs. Graphics and signage. Windows. C33 license#426231 Exams 7/31/04 Oc1q0#0 E. TURMAN & CO., INC. 2055 RESEARCH DRIVE LIVERMORE, CA. 94550 (925)455-9091 FAX: (925) 455-9097 DATE. 9/18/2002 PROJECT: Headstart Classroom R.R.'s TO: Buestad Construction LOCATION: Richmond FAX: (510) 523-2085 REF: Painting ATTN: Brian 'Steiner Brian: Painting proposal for ref. project per your fax dated 9/16/2002, We are including the following items in our proposal: 1) Gyp.walls at new construction 2) Approx. 100 additional square ft. of existing gyp. wall at each new restroom 3) Good wall caps 4) Wcod base cabinets 5) Werk performed in three phases 6) Prevailing wage rates T otal Proposal Should you have any questions please call. Thank You E. Turman & Co., Inc. Jim A. Staggs Page ! SECT#a�N NUM$Er�; /a y�y� ♦buestat cscTfOrt NAME;. onst-�uctioand Head start classroom remodel Rich South St Richmond,Californialif BID PROPOSAL DUtc.Thursday,19th Sept.2002(g 2.00 pm DESCRIPTION LAS OR MATERIAL SUS ECUIF. OTHER SUBTOTAL :LL t r S i E i i i S i i E I i I � I k S i t � i S t t 4 i i � t AD Ar— * CONTACT 1rw Staiw AT(510)521-192$:205 IF YCU v,AVE ANY CUESTIONS, VERIFY 9..:.'XAC-CIMENSiONS OF ALL MATERIALS EEFCRE ORDERING(APPROXIMATIONS ONLY). ` VERIFY E"C-CT CJAN(TtES WIPLANS&SPECIFICAiICNS;APPROXIMATIONS CNLY), 950529 i®"zw faX$22 20$5 SUPPLIER S&SUSCONTRAC TOWS RESPONSIBLE TO VERIFY EXACT SCOPE OF YORK(THtS'.'!A5 7$3 ata kelt Cnut PREPA.REC AS A HELPFULL CHECK LIST ONLY), xtxmida ca 9b505.2100 P $ Q 5 ? $ FOR SSC PRCPCSAL ESTIMATING ONLY'!!, THIS IS NCT.A PURCHASE CRCER andlar A SUSCCNTRACT ACRE:'AE`t' SECTION NUMBER: buesta SEGTkON NAME: construction Head start Classroom remodel low Rlch South alt'mi Richmond,Cali',csrnia in- WD PROPOSAL DUE:Thursday,I Sept.2002 2:00 Pm DESCRIPTION LABOR MATEI2lAL SLfB EQUlP, OTHER SUBTOTAL r Loo" f E ' I I s ! E I I ; I , ; I I i I ' r 1 1 , i I I f I I I i 1 j CONTACT?r.an Stainer AT(5110)523-1925 x205 IF YOU RAVE ANY QUESTIONS, VERIFY EXACT CIMENSIONS OF ALL MATERIALS BEFORE ORDERING(APPROXIMATIONS ONLY). ° VERIFY EXACT CUAN;TIES w/PLANS&SPECiFICATiCNS(APPROXIMATIONS ONLY), 410 5231925 f&x 523 2095 SUPPLIER'S S SUBCONTRACTOR'S RESPONSfBLE TO VERIFY EXACT SCOPE OF WORK (THIS WAS 159 staW3rt calm PREPARED AS A HELPPULL CHECK LIST ONLY), :Iamedx ct 94501.2100 3 3 9 9 3 i 6 • FOR 910 PRCPCSAL ESTIMATING ONLY!!!, THIS IS NOT A PURCHASE ORCER and/or A SUBCONTRACT AGREEMENT nula.aa.,'t419,5 +�r-Glrtr'{Lr Szi 1 0 :-:.. .:. .... .. O" /Pot 4040 WHELAN BUILDING SPECIALTIES Fah: (916) 9W8293 RO. BOX 1219 px, (916) 988-1028 FOLSOM, CA 951763-1219 DATE. September 1"`'9�,(2002 QUOTE NO.: 85'31 TO: BIDDING CONTRACTOR .AWB: H DS/`y+ ART ADDENDA NOTED, NONE LOCATION; Richmond, CA SELF CERTIFIED MINORITY OWNED SMALL BUSINESS We are pleased to provide you with the fallowing tluote: 1. SECTION 108001TOILET ACCESSORIES. MFG: BOBRICK, as specified QTY: 40 items TOTAL FOB JOSSITE WITAX: TOTAL FURNISHED & INSTALLED W/TAX: $ 3,000,OB' Install quote used on single trip for ell 5 restrooms �t ADD if phasing trips required, per trip: Quote assumes single shipment of material. If phasing required, additional freight charges will apply. UNLESS otherwise noted, quote excludes installation of owner furnished items and trap wrap at plumbing fixtures, Quote prepared :Craig Whelan i .tasty P.O,s will be acce�fed!or FOB Items.Only Mfg suppiiad fasteners,if any,etre included tre FOB quotes, All FOB items are NET 30 days,Delir�c{uenc es ; rse per month until paid In full.Fog shunts become the responsibliity of the GC upon Signing carrier's receipt.Any damaged goods must be noted on i the carrier receipt.All claims must be made by QC to carrier,in westing 48 hrs of receipt of damaged goods, 2.Furnish 8 infill quotes of less than$3000 are NET 45 days from date of installation. 3.All quotes,are limited to quarittt es and specification section(s)Listed,Alt quotes ExCLVDE tesrrng,power,caulking and aealing,demo,furring,patc:sing, bioo"g,bsofdmg,outouls,structural supports,electrical works,and drilling and tapping for ceiling hung partitions. A Allow w mtn lewd time,plus truck time,for rnost item.Quick strip available for most to€lM,c*rnpsrtmerrts at an upchairge,Po"r partittoras are&10 j w In summer mor*is.LEAD TIMES ARE FROM GATE of approved su6mittalrs and verftd field dirmnsi ons. 5,All quotas are gond for tab days unless tathertis se noted.Any Mfg cost increases will be passed through to you,and by acceptance of this Quote,you agree to pay soon osmf i sns. 8.was is not required to accept returned goods,Returned goods will not be accep%d without pricer win consent frorn WBS.All return goods must be returned in their original cartons and are subject to restocking and return freight charges. ?.8y acceptance of this Quote,the parties agree treat the passage of title will not occur and WBS mairdains a security intera st In all iterns until WSS-receives payment In full. E.All quotes exclude bonds,unless noted otherovisra. 9.W86 is not x:mien sub or contractor. THE Cs'OJLF FOR rOL,Y7'LY?AAPAATlVeN75 arm yaatuMrra AW Proposal September 19, 2002 Quote: LN4192 Jobe Balboa Preschool Richmond, GA We propose to furnish: seadn 10800 40 total units American Specialties brand accessories_ (one drop�hipmentfno phasing) FOS jobsite, tax included . . . . . . . . . . . . . . . . . . Per,plans dated; none Addenda noted, none AM backing, ceutkln and sealants are excluded. This price is good for 30 nays. 'lease refer all questions to Laura Nelson. Bid is based an Global's, standard insurance coverages. 936 C1� EEy3�`.�tFAX OAKLANO.CAryLIMRNyIA 94608 Ue #684979 {urr • /_ 09/19/2002 09:06 #667 P.001/0022 JD SPECL46LTILES QUOTATION (TOILET PARTMONS a Acmas mrss) I DATE NUMBER ;Tal.ftp ,(200) ',uau No. 7 !CUSTOAWR;ADDRj988 GENEAAL CONTRACTORS/MOMS ! LOCATION ToRms FOS +OSA WD Dvjlvvre to fool CA J00 site 110m= ME QNTY POST 1 , Supply trallati n csJ'8� flat btthrzafn Ocoeer�ufas sm per affached 1, Well bw*Jmo cut outx for Mist r rl". D . QUOTATION 18 FOR IMMEMTE ACCEPTANCE WITRN 30 t'AY13 PREPAMD Mr. DAN.t SUVIJEC"t`TO CHANGE vr1ITT'MC}U r C'O-nCE THEREAFTER. . ALL QUOTE$OCCLUDES 011MO,PATCHING,SLOMING,DACKING& CUTO=' ACCEPM E►Y: jt).' ONLY PURCMRM L RVIR,S WILL SS ACCIniPM FOR Ft,O,8, rrOM Repcold Distributors, Inc. 431 McCormick Street vI Saga Leandro, CA 94577 *MOO* Tel: 610-562-8932 /#polo Fax: 610.552-9050 Fax Bid Form Fax Dale: ..q� Time. 04neral Gonlractor..».... » Y 'c. ,---� — Jobslls Location; - sectlot(s) & 'Ftad$3( Mans&spaccr ..�(,_F`umf5h K—install F .B< u .-Jobsila lax — - - 1�$k+$91b3V�4i td>k fY i4�$ii4k'#tick#iitA#4{'44441A{{i#tEYwt#tt4i#iYit4♦#R{AR#Y#Y{{ati4w$t4A 4r4ikt4#ill 4st4w4#rw#t#s lfildes. Amount WK fie Tota 4kl484kR.t4t:kxJ.##+tiAw:lt•*4t 444#{#tra#k$$i#aa#a4#{#4w a.#1$44iw$<!t##{{{{ tr AYti#w#w4$Y 47t 4!}44#4r##{k #4tiw#trw Alt) Addl(Vedu�r ,...-.w.. ........ ..._..--_ -- w.�.......+.......�.w.. $ 6 tw iRMIkWW$ii4$MwkY#f$Y4#A#4Ys{#w*{*$■sk$4+#wrw{M44w4 w4 t#rain ritaw{#altotar Y4 t4#{4i4k#i${ttii{k$w4#t4#t4{tl4r ExcloshD05 Olaf J 4. 'LpP � _ 6. FRAMING eft DRYWALI.V' „93 � � Install approximately 501f. Type 2x4 I61'o/c DF stud wall floor to existing ceiling. Install approximately 1301f Type 2x4 16"o/c DF stud low height watt. a. Install 5/8 Gypsum wallboards,one-sides interior walls from floor to existing ceiling. b. Install 5/8 Gypsum wallboards,both-sides love height walls. c. Drywall tape& finish to be level 4 spray knockdown. d. Excluding all existing building perimeter wa D 6. RESTROOM ACCESSCI Supply &Install restroom accessories pprox. (40ltem Jay j y)/r a.. (5) ea. of Mirror B-2906 t$ x24 � b. (5)ea.of Paper towel dispenser B-31 8 c. (5)ea.of Soap disperser B-8225 d. (5)ea.of Grab bars B-68137 e. (t 0)ea.. of toilet paper dispenser B-3888 f (20)ea. of toilet paper seat dispenser B-221 LEAD TIME OF 34 WEEDS FOR.CONTRACT,INSURANCE AND MATERIAL. We look forward to working with You. This proposal may be withdrawn if not accepted within 30 days of above date; it is subject to and includes all terms and conditions on the fade and attached sheets and any other terms that are mutual�y agreed upon. This vapid shall become part of an attachment of the issuing contract. Contract Price S 17,896.00 Accurate Interior Systems &Construction, Inc. Acceptance.hate: g : Title: PM/Estimator BV: BY: Dal Kral Title: Approval Date Terms and Conditions The Work: Accurate Interior Systems& Construction,Inc.will supply all work described on the face of proposal in accordance with the plans and specs. dated of proposal. Schedule Change:Accurate Interior Systems&Construction,Inc.'s obligation hereunder is based upon the Schedule, both as to duration and sequence. In the event of any significant change in Schedule,whether permitted by the Bid Documents or not,the bid price and Schedule shall be equitably adjusted.Accurate Interior Systems&Construction,Inc. shall also receive an equitable;adjustment of the bid price if this contract is terminated otherwise than for Accurate Interior Systems& Construction,Inc.material breach. Work Week. Accurate Interior Systems& Construction,Inc.will supply labor for the work can a regular 40-hour week without any overtime, if the Customer requires overtime, accurate Interior Systems&Construction,Inc.will be reimbursed for the premium portion of wages paid(including payroll taxes and insurance); plus a reasonable allowance for lass of productivity cause by the overtime. a + Accurate Interior Systems & Construction, Inc. AM l8464 Shadetree Drive F ` � ft� Windsor,CA 95492 2,0 Cel;Phvnc707.9755 233 E/ Phone&.Fax 707.837.2871 CA I.IC#803367 PROPOSAL To: General Contractor Data: September I9, 2002 Attn: Estimator Sheet 1of3 ArchitggiM rgineer: Claudia Falconer Job NgMe: Restroom Facility in Headstart Classroom @ 1001 S 57` S' Richmond CA 94804 'hank you for the opportunity to quote this project. We propose to furnish and install FRP panels, framing& drywall and restroom accessories plans Dated July 8,2002. Our price is based on clarification stated in this proposal and is conditional upon acceptance of mutually agreed terms and conditions. 1. All work is to be performed on straight time, sequentially,with all work areas to be free of obstacles to production. 2. Protection of work is to pass to the general contractor after completion of each phase of work. 3. EXCLUSIONS a. Exclude any and all building permits of fees. b. Excluding cost for any and all insurance waivers of subrogation. c. All heisting and dumb bins are specifically excluded from our base bid for this project. d. Any and all patching of fireproofing or insulation. e. Any and all testing for our scope of work. Any and all shop or as }guilt drawings. g. Any and all engineered drawings. h. .Any and all caulking or sealants. i. Any and all world framing, blocking or backing. j. Any and all temporary lights, power, &water. k. Any and all overtime due to compressed schedule. 1. Any and all backing to be provided by others for all scopes. m. Any and all insulation by others. 4FRP PANELS sS3,399.00 a. FRP panels to be installed with Sequentia class C non-fire rated. b. Installation of FR-P wainscot 48"AFF' in res morns only. c. Installation of FRP panels in retstrooms to have vinyl trim. d. Installation to be prior to fixturization of all plumbing& hardware. e. This quote doses not include any cost for FRP work that may be caused by other trades damaging or removing FRP in order to perform their own work. SECTION NUMSER. AWAV bueStad SECTION NAME construction Head start classroom ren"Wet o j001South57thSL mi Aictsmcnd,CaiHor7fa SID PROPOSAL CUE:Thursday,IVh Sept 2002 t 2.00 pm OESCfiIPTiC3N m RIAL SUSclul�, OTHER SUBTOTAL ; I Ar 41A A( l 's i I 7 I t__" t � I 1 I{{ 4 1 i � t t 7 {II 3 � 1 a --- r CONTACT:.,an Steiner AT(510)523•'821 X305 IF YOU SAVE ANY OUESTICNS, VERIFY '(JCT CIMENSIONS OP ALL MATERIALS SEFCR=_ORDERING(APPROXIMATIONS ONLY). 'VERIFY SACT CUANMES wiPLANS&SPECIFICATIONS fAPPROXIMATIONS ONLY), '11523 1525 fax 523 2055 - SUPPLIE.'.'S S SUSCONTRACTOR'S RESPONSISLE TO VEPIPY EXACT SCOPE OF'NORK(T'H;S NAS %55 SYawatY Court PREPARE'45 A HELPFULL CHECK LIST ONLY), alr^eda el 54501.2100 8 3 T 8 ' FCR 010 PiCPOSAL ESTIMATING ONLY!!!, THIS iS 507 A PURCHASE CRCER 31d1C-A S'JS=TRACT AGREE,M . map 154A940# ,a Plumbing & Heating, Inc. Contractor's License No. 792404 281 Arthur Rd. * 925 3720 925 372-9448 * Martinez, CA 94553 i FAX BID To: Buestad Construction, Inc Attention: Project: Balboa Preschool Restroom Addition Date: 09118102 Richmond, CA Telephone: 510 523-192.5 Fax No. 510 523-2085 Sections}/Trades 15050,15140,15150,15400/Plumbing Plans&Specs—X—Furnish&Install X FOB,lobsite X Install Only T ax Included X Addenda: None 1 2 X 3-4-5--6-7-8-9 Champion's is a union shop that pays the prevailing wage and is bondable. We do not have minority status. Bid Includes: All waste, water, gas and finish as per plan page's A3,P1,P2 and P3 to paints of connections. Total �. ALT# Concrete Coffin Cerin and Removal Add/(Deduct)ditches onM$ 5.681.00 ALT# Dia & Backfillin both interior& Exterior trench in This includes sand & rock Iry No atching (pLq_mbin-q ditches only) 770,00 �/!�--/ ' EXCLUSIONS: No fee's, no permits, no sawcutting, removal disposal or patching of concrete and asphalt. No demo of existing conditions. No offsite disposal of spoils. All work to be done during normal working hours (no overtime Or premium time). By. n Champ€on stimator `J 840+rs 2LE Sas 2u i gwn I,d suo t dwe 4o di-0 : 10 20 61 dad 01, Oaf#3 154WO ChI'15t{1p11eT 1. Ai1, L3St{7 P1lIIYlblIlg Co. Estimate 4 Santana Road Novato, CA 94945 TATE ESTIMATE NO. 415-897-6174, CA 9JI9/2002 188 CA LIC #730020-C36 �l NAME/ADD RESB E j AT-rN: ESTDAATOR e i i PROJECT BALBOA RESTROOM ADDMON ITEM DESCRIPTION QTY RAPE TOTAL 1-PLUMBING COMI'LIdTIO1`v OF ALL PLUMBING PER FLANS 35,080.00 ` 39,080.00 ! AND SPECS. ALSOINCLUDED: LABOR, MATERIAL,FDCTURES,ALL ASSOCIATED PIPING FOR FfVE CLASSROO-MS, LNI CLUDES CLORINIZATION OF PIPLNG r NIC NIQPERMTT FEES,LIC.FEES,DEMO OR PATCH OF E 0.00 0.00 CONCRFTF,,I'RE'NCHLNG,ELECI'RICAL,PA.LN°I'T.gG,S f ITE UTLTTIES. s j P i I i I i f i I , TOTAL MADRID PLUMBING, INC. P. 0.Box 363 Danville,CA 94525 925-837-7979 Fax 925-837-0418 September 18, 2002 Buestad Construction, Inc. 768 Stewart Court Alameda, CA 94541 Fax (510) 523-20.85 Re: Plumbing Proposal Centra Costa.County Restroom Facility-Headstart 1001S. 57 1h St.,Richmond Madrid Plumbing proposes to supply all plumbing labor and material to complete the above referenced project as per plans, specs, and walk-through,including Addendum 1 dated 9/16, with the inclusions ars n ' ted below for the sum of thirty-nine thousand six hundred sixty doll ,." Not Included: Permits, fees, trenching, back-fill, compaction, concrete demo removal and/or repairs, bath floor drains. Payments to be made as follows: 35%payable after,ground plumbing, 35% due alter top plumbing, and 30% due when trim is set. A penalty of 1-1/2% per month will be assessed on all unpaid balances after 30 days from original invoice date, Sincerely, y MADRID PLUMBING, ITNC. �,��-sem � �!� �r�'b�✓xc � � l '�� w 00 Richard Madrid Lic. #312313 Accepted.: R PLUMBING 8401 CRUTCHFIELD COURT CITRUS HEIGHTS,CA.WIG Ph"919.721.9847-Fax 918-721-7496 GIC#742120 WE PROPOSE 1*0 FURNISH ANIS INSTALL ALL MATERIAL AND LABOR, PER, FLANS AND SPECIFICATIONS TAX INCLUDED AS FCII-LOWS. PLUMBING DFMOI.TTION, WASTE & "VENT, WATER., EXCAVATION sir. BACKFILL, ANIS PLU:M�IBING FIXTURES. FXC'I,IojDE,S: FEES, PFRMITS, SAWCUT REMOVE ANIS PATCH OF A/C OR CONCRETE, SHEET MF—TAI., PA N`I ING, AND ROOFINC, WF ARE NOTING ADDENDUM I FOR. THE SUM OF 38 64.00 ADD FOR 5 FLOOR DRAINS 300-00 ROGER COBABE �- PAGER 916-828-3610 00 /1 _ v f u:Z>10 :n'e6 i-,085 P.002'003 Olsson PLUMBING AND HEATING CO., INC, September 19,2002 SUBJECT, Restroom Facility,Headstart Class' oms 2,icltanotxd BID PROPOSAL It is our pleasure to submit the fallowing outline of the scope of work we propose for the subject project. This is for your convenience and consideration. Please contact us if we need to make changes to this outline to hall)in your evaluation of the project and our proposal. Olsson Plumbing cYt Heating qualifies as a small business enterprise,an equal opportunity employer,and intends to subcontract to WBEINME contractors if needed. We conform to the affirmative action program requirements often called for in the contract documents. As set forth below, we include the fcunishing of labor and materials to install the; work described in the specifications or as shown on the plans. All taxes and licenses are included. The following is a description of the proiect and our proposed scope of the work PftWEC"17° Restroom Facility Headstart, SID DATE- 9/19/02 LOCATION: Richmond, CA BID TIME: 2:00 Phil !S,�' �,,,VECLLQN3 t�tl1 E_A 15400 Plumbing Amp For the Sum of jC',v 'S"0 0 O&A'011 f P This proposal is contingent upon the understanding between our companics that we have taken some exc:ptions and have stated certain clarifications on the second page of this offering. These changes may be diftcrcnt than the contract documents indicate. Please fccl £tee to discuss any of these items with us prior to hid time so that both companies have a clear understw}ding of our scope. CC)Nl"`RT ED, SEE PAGE 2 2306 KANOINC AVE. ALAMEDA,CA 94501 TEL:(510)522.2442 FAQ.(510)522.0951 LICENSE NO.266425 FRBME .MSRRLJMB'ING FRX NO. :1510 265 1756 Sep. 19 2002 08.24AM P1 001> sow n .P. PLUMBING CO. 1975 NATIONAL AVE. HAYWARD CA. 94545 PHONE (51 0) 265-1759 FAX [51%1-65-1756 LICENSE #00487051 PROPOSAL ESTrMATOR: MARVIN PEREKRESTENKO PHONE (510)265-1759fFA (510)26&1756 DATE: September 19,2002 'SAVE+ I'I2.OPOSE: TO FURNISH ALL LABOR,MATERIAILS AND PERMM TO iSTALL TIM PLUMBING AND/OR PROCESS PIPING AS Or TUNED IN THE PIANS AND SPECIFICATIONS PER CA. STANDARD TRADES PRACTICES & U.P.C. GUIDELINES. INCLLTRE: Excavation,underground water and waste piping, above ground waste and vents,plumbing rough-inn,plumbing"ures,hot and cold water piping, water heaters, single bowl sinks as per plumbing drawings. Acknowledge addendum#1 dated 9.12-02. Acknowledge addendum 42 dated 9-17-02. WE K&CLLTDEz Mab saw cut, patching,core drilling,B'VAC and associated piping, sprinklers, gas piping, rvo%drains,rain water leaders, condensate drain piping, toilet room accessories. Base Bid $79,500.00 Alterns a Bi $ 0.00 t Total Bits (EST LN ATE VALID FOR 30 DAYS FROM ABOVE DATE..) J013 NAMUE: Restroom Facility In Existing Bead-start Class JOB ADDRESS: 1001 South 57`x`St.,Richmond Ca. S1=C i tON tdtJMB€R: buestadcsttat�t� rMl . Construction Head start classroom remodel t o Rich South 57th St. Richmond,California lac.. 810 PROPOSAL DUE:Thursday,19th Sept..2002 2:00 pm DESCRIPTION LABOR MATERIAL SUS EQUIP. OTSE. St3$TGTAL 0 i 1 l i 3 s fi fi fi fi i 7 i I I s l fi I i fi fi l i � E fi i fi fi I fi fi fi fi I i As 41 Apr Ani Av"Nv 10 fi fi i i CONTACT iftan Stainer AT(!IC',!Z3-T1325 x205 IF YCU Hns'-ANY CUES-,;'NS, VERIFY E:eACT CtMENSiCNS CF ALL MATERIAL$SEFC.ne'XCERING(A7?RCX1,MATtQNS ° VERIFY EX CTCUANITIES wiPLANS 3 SPECIFICATIONS(AFFROXIMATICNS ONI,Y), :1:333 t9i laX 3232';x5 ° SUPPLlER'5.�5Uh3CONT: +�CTCR'S R.'^.SPGN5f8L®TC Vs-.FY E.'CACT SQO=s OF WORK Pd8 Stewart CCUrt PREPARE:;A$A HEL r FULL CHECK LIST ONLY). atameda Ca 94!01.2100 ., }{ 0 3 7 $ > ,TCR 5110 P Q5AL FSTIMATSNG QNLY"?. TritS 45 tiCT.A PURCHASE Qf1.".E-4 anrlCr A SU--=NT RACY AGRE-EMENT -- _ OOLD ELECTRIC , INCmom . low September 17, 2042 FAX TO (5 10) 523-2095 G OLD FAX: (925)484-4548 Mr. Brian Steiner EUBSTAD CONSTRUCTION 768 Stewart Court Alameda, California 94501 'RE: RESTROOMT FACILITY IN EXISTING HEADSTART CLASSROOM'S CONTRA COSTA COUNTY COMMUNITY SERVICES Dear Bcia.n< We arra pleased to quote the above referenced work. Our price is based can the sketches you provided and includes the following. 1, Demo, ,ou h and trite 2 bathrooms. $ 1,330.00 2. 1)erno, rough and trim 1 bathroom. $ 665.00 3. Dean, rough and trim 2 bathrooms $ 1,330.00 TOTAL Ifyou have gray questions, please fee', free to contact rne. Sincerely, GOOLL3 ELECTRIC, INC. c aw Vice Pr siderlt i�f,�+11mv�:{i��tra7rt&�uCs".cit) 2178 Rheem Drive s Pleasanton.CA 44588 + (925)484-1551 •Pax(925)484-4048 COM Lia.No.218278-010 a VVE Atm REQUESTING CAJOTAT04S FROM ALL CUAL0120 USEWBEIWEIFADDESSMSE&MSM Dodge Constr ct oti News SUBCONTIRACTOFM AND MATERIALSUPPit DAILY PACIFIC BUILDER FOR FXYL i..OWING PROs : CaW LAS EXTOMON FOR tli ofa raw-i#ilt,Inc. THE CONTRA CCSTA COUNTY SHMMFF&COAON Fi Construction New*Publishing Network Contra Costok CQU*Deponmert of t3wwrwlt two M&Road,SLVW 201 Pubilst ees Affidavit Cit File islet: STATE OF CALIF'C>RNJA } ".racia ��r stken, firm 0010 nhy. County of Son l t nctaca }as> Arca rel Wbodwtodc,Oxrte t*sp lot srf hearwl i,Jif QVL2ach&of the City and County of .ickt i&.%bod Doota& San Fruncrsco, stag of Callff0mis, hsvwng A1srtsYrssftidowa, }la0trsrwt.Glaw&Gmuk*; r duty beer swum.,depot"and Bays: 0A Ceft t & I am now and at as tomes #s►rei th4 Fmr't mentioned was a citizen of the United S"tdoe ,AF&Mw Fire&qxe9&ion i:We0,Mrt*q WAC, *4 America, avwr' twony-oner years of ago, ,�. HVACWe6 L�trfitut�its�icacz8I3�a anti competant to be a witness on " t ID0ATl?-8vgVMeRt?'20 * PM hsadng of the ma is mentioned In the Pnoawoft faftvftdc annexed printed copy notice 3z"nefte+r set Tuesday,Sopt rnxbrrr 9,2=at 140 PM forth;I harm no In*"t whaisosverr in any of the said matters;I am now*md rtwing all the R1%rAOOMFACXJ1YlN times ombracod In the publication hweltt t' 01 WEAMIIIARTV-4 ment=ed was the CHIEF CLERK of tNow"COWA0oea*+f WVWr r$�WVWIC"N$�twt Badge Consavctton hews Bedy° P9CM IWI a'►SM80eet Baker, a newspaper of general circulation mdw"4CA y printed and published daily In said City and Fk1*s,:1a541t77 County; as CHIEF CLERK during all the 062ilmduci+,MBylMf3knftd-to:Asbosba Abe*w, tires es rnanVonad In the affidavit I have had num carponvy,lira mYig ShWwV.Ctistorri C aew*Flush and ; still have ettarge of ail advsttiaam n is Wood Dows,taw HaMium+a,Glaaing,Gypsum and notices published in said newspaper; �Ft Fiocusrwga t'si€ ,Ts�wwt fire, tt!at sold legal notice of which the armored is Pk nnbing&iri I» a true printed copy was published In the 910 DAM SWMMOM19,20M above earned newspaper on •she folowN py }d Wai dsys to wit T ,�ry, mtw 10,2=at I�WAM 788 SUw4a t Court AWxteda,CA 94501 l csrtify(or declare) under psna8 y of penury Pken e Phow.510-51825 Pax:510-823-2065 that the foregoing is true end correct. Contact Blot Staltwir WL 2 arrl aaa for ares usakr , ,� +� .f"i.. Signed. _��SC Ci d Ceram W Brwiaas AIA Chief Clarkl�..a�l f�DA"�E1=�C5t4! '�+"''csY.rFs.6C -- 626 Van Ness,3`d Floor WE ARE AN EWALCP'0RTLtM EUPLCY12A San rranciscc,CA 94109 Csa�b t s b A DIVISION #10 - SPECIALTIES j � 101500 TOILET PARTITIONS 108100 TOILET ACCESSORIES (COMMERCIAL) DIVISION #11 - EQ IPN.Cr",NT --- J t°G#' WoY- DIVISION #12 - EU`RNISHINOS ENVISION #13 - SPECIAL CONSTRUCTIJN I:1IVISIL`'«V #.`4 - CONVEYI'ING S'Y.fi.+.".FUMS DIVISION ##15 - :SCHANICAL 1554000 PLUMBING DIVISI'.N #16 - ELECTRICAL 160000 ELECTRICAL WAZZC -.7%70UGH SC.T.IDULEED FOR: TUESrJAY, B SEPT, 50rx, 2002 Lv 9:00 am BID PROPOSALS DUE BY: THURSDAY, SEPTEMBER,I9TH, 2002 no later than 2:00 pm (PST) FOR PROPER EVALUATION PLEASE SUBMEITT 4 HOURS IN ADVANCE NOTES: BIDS TO BE BASED ON COMPLETE SET OF BID DOCUMENTS (NOT SPECIFIC WAGES, SPECIFICATION SECTIONS, ETC., BID TO BE BASED ON PREVAILING WAGES FOR FEDERALLY- ASSISTED CONSTRUCTION PROJECTS, CONSULT SPECIFICATION BOOK, AFFIRMATIVE ACTION REQUIREMENTS ARE IN EFFECT PER SPECIFICATION DOCUMENTS FOR. MBE,WBE,OBE,SBE,LBE,& MSM (MANDATORY SUBCONTRACTING MINIMUN) - WE RESERVE THE RIGHT TO REJECT any/and ALL BIDS, OWNER TO OCCUPY PROJECT SITE DURING CONSTRUCTION, SOME TRADES ARE REQUIRED TO MAINTAIN ACCESS THROUGH WORK AREAS SUBCONTRACTOR'S WILL BE REQUIRED TO FURNISH PROOF OF A CURRENT CALIFORNIA STATE CONTRACTOR'S LICENSE, SUBCONTRACTOR'S WILL BE REQUIRED TO NAME: SUESTAD CC}NSTRUCTION, THE OWNER, AND ARCHITECT, ETC ADDITIONALLY INSURED (FORM CG2010 11/$5) , 14OTF: IF YOU NAt�M "ALL CALIFORNIA. OPERATIONS" YOU 00 NOT HAVE TO rsw s�,E �yj db's" 'tlY+w+Y r.{+ SPECIFICALLY NAI-M THE OWNER, - S'BC K> tee, MIA ap F t y ei TANDA€D (UN-MODIFIEi TERMS & CONDITIONS AS SET FORTH IN THE € BUESTAD CONSTRUCTION SUBCONTRACTOR & PURCHASE ORDER AGREEMENTS, A COMPLETE SET OF PLANS, SPECIFICATIONS, AND ADDENDA (IF ANY) ARE AVAILABLE FOR INSPECTION AND USE IN OUR PLAN ROOM. PLEASE CALL BRIAN STEINER (510) 523-1925 ` z *" x 205 FOR AN APPOINTMENT TO REVIEW THE CONTRACT DOCUMENTS.PLANS AVAILIBLE IN MOST BUILDERS EXCHANGES AND PURCHASE FROM THE GSA CONTRA COSTA COUNTY 925-313-7200 FOR $25 590 523 1:925 fax 523 2035 768 Stewart curt ,1 .0 1,10 kip a(am¢da ca 94539-2900 r 6 3 6 0 3 7 6 r t �--— t ATTENTION ESTIMATING DEPARTM NT To: Doug Snodgrass f (Organization: DMI' GO�b y W44 Fax number: 520-544-5266 1 b u e s t d i From: Brian Stein � rd ,'1,i ae, construction Date: 9/9/02 t MM ( INVITATION TO BID 6 PROJECT: RESTROOM FACILITY IN PLEASE A*.ARFC THE; FOLLOWING AND RZTURN rqy e.4,4 EXISITNG HEADSTART CLASSROOMS "VC©NTR.A COSTA COUNTY 0 I AM INTERESTED IN MORE, INFORMATION lVoYie RICHMOND COMMUNITY SERVICES DEPT. PLEASE CALL OR FAX FURTHER ADDENDUMS, ECT. LOCATION: 100: S. 57"" STREET, RICHMOND CA. 0 I WILL NOT BE BIDDING ON THIS PROJECT ARCHITECT / ENGINEER: CLAUDIA J. FALCONER, A.Z.A. P.O. BOX 70232 0 I WILL NOT BE BIDDING ON THIS PROJECT PT. RICHMOND CA, 94807-0232 BUT SEND US FURTHER INFORMMATION ON FUTURE PROJECTS. ` PROJECT VAT-LIE RANGE (APPROX,) : $120,400" Loki TENTATIVE SCHEDULE: PER SPECE'ZCATION DOCUMENTS ESTIMATE PROJECT nU'RATION! 100 CALENDER DAYS PER SPECFICATION DOCUMENTS `7 THIS 25 A 3 PHASE PROJECT DIVISION #1 -- GENZ'ERAL R.EQUIREN*ENTS p i cX.i 025000 FACILITY DECOMMISSIONING (ASBESTOS ABATEMENT) DIVISION #2 - SITE CONSTR.t7CTION 022205 DEMOLITION (BARD) DIVISION #3 - CONCRETE, y� 030000 CONCRETE (BUILDING) /104-e f /P 011 � 4r<1 DIVISION #4 - YASt"ON-RY �7� �hh.►� DIVISION #5 - METALS DIVISION #6 - WOODS Jam+ { ✓ y 061100 ROUGH CARPENTRY 064000 CABINETS / ARCHITECTURAL WOODWORK 064150 COUNTERTOP'S DIVISION #7 - T'HERI-AL & MOISTURE PROTECTION DIVISION #8 -• DOORS & WINDOWS 082000 WOOD DOORS & FRAMES _ 087000 FINISH HARDWARE : J �,i4y ,e4 Work k 088100 GLASS & GLAZING 088300 MIRROR DIVISION ##5 - FINISHES 092500 IN'T'ERIOR GYPSUM 096000 FLOOR COVERING 0990000 FAINT-ING & COATINGS Beard of Supervisors 135-0107/B.4.4 CONTRACT AWARD RECOMMENDATION Page 2 4, Skill Mean, Inc. Pittsburg, CA 158,400.00 5. Hellmann Construction Company Pacheco, CA 169,500.00 rix:=CJs cc w/attach.: County Administrator's Office County Counsel Clerk of the Board (w/bids) Contract Compliance Officer H:12001\1350107\0 1110703 7m.doc File: 135-0107/B.4.4 THE BOARD OF SUPERVISORS CONTRA COSTA COUNTY, CALIFORNIA Adopted this Order of October 22,2402, by the following vote: AYES: SUPERVISORS UILKEMA, GERBER, DESAULNIIER, GLOVER and GIOIA NOES: NONE ABSENT: NONTEE ABSTAIN: NONE SUBJECT: Award of Contract for the Restroom Facility in the Existing Headstart Classrooms at 1001 S. 57t" Street, Richmond for the Community Services Department Authorization N,o. WW0097 Bidder Total Amount Bond Amounts Buestad Construction, Inc. $126,612.00 Payment: $126,612.00 768 Stewart Court Performance: $126,612.00 Alameda, CA 94501 Tears Commercial Construction, Inc. Point Richmond C.IEIRTE (JV) Concord CBC Construction Co. Pleasanton Shill Clean, Inc. Pittsburg Hellmann Construction Company Pacheco The above-captioned project and the plans and specifications therefore having been previously approved, Addenda Nos. 1 and 2 having been issued and approved, and bids having been duly invited and received by the.Director of General Services on September 19, 2002; and The bidder listed first above, Buestad Construction, Inc. ("Buestad"), having submitted the lowest responsive and responsible bid, which is $1,051.00 less than the next lowest bid; and The Board having evaluated all of the documentation of the good faith effort to comply with the requirements of the County's Outreach Program, including documentation showing that Buestad has attained. 53%Mandatory Subcontracting Minimum ("MSM")exceeding the 30%MSM specified for this project, and The Director of General Services recommending that the bid submitted by Buestad is the lowest responsive and responsible bid, and this Board concurring and so finding; NOW, THEREFORE,the Board finds, determines and orders as follows: The Board DETERMINES that Buestad, as the lowest responsive and responsible bidder, has demonstrated an adequate good faith effort, pursuant to the specifications for this project, to comply with the requirements of the County's Outreach Program, and the Board 'NAIVES any irregularities i such compliance; and The Board, therefore, ORDERS that the contract for the furnishing of labor and materials for said work is awarded to Buestad at the listed amount and at the prices submitted in said bid, and that said contractor shall present sufficient payment and performance surety bonds as indicated above, and that the Director of General Services, or designee, shall prepare the contract therefor; and. H A2001\2 350107\01 Y t 0703 Sb,doc Iof2 Award of Contract for the 135-0107IB.4.4 Restroom.Facility in Existing Headstart October 22, 2002 Classrooms at 1001 S. 57h Street, Richmond For the Community Services Department The Board FURTHER ORDERS that after the contractor has signed the contract and returned it, together with the bonds as noted above and any required certificates of insurance or other required documents, and the Director of General Services has reviewed and found them to be sufficient, the Director of General Services, or designee, is authorized to sign the contract for this Board; and The Board FURTHER ORDERS that in accordance with the project specifications and/or upon signature of the contract by the Director of General Services, or designee, any bid bonds posted by the bidders are to be exonerated and any checks or cash submitted for security shall be returned; and The Board FURTHER ORDERS that the Director of General Services, or designee, is authorized to sign any escrow agreements prepared for this project to permit the direct payment of retention into escrow or the substitution of securities for moneys withheld by the County to ensure performance under the contract,pursuant to Section 22300 of the Public Contract Code; and Pursuant to Public Contract Code Section 4114, the Board DELEGATES its functions under Public Contract Code Sections 41.07 and 4110 to the Director of General Services, or designee. The Board.DECLARES that, should the award of the contract to Buestad be invalidated for any reason, the Board would not in any event have awarded the contract to any other bidder, but instead would have exercised its discretion to reject all of the bids received. Nothing herein shall prevent the Board from reawarding the contract to another bidder in cases where the successful bidder establishes a mistake, refuses to sign the contract or fails to furnish required bonds or insurance in accordance with Public Contract Code Sections 5100-5107. Orig. Dept. General Services Dept. .,Architectural Division cc: General Services Department Architectural Division l hereby certify that this is a true and correct Accounting Dopy of an action taken and entered on the ACD File: 135-0107/A.5 minutes of the Board sof Supervisors on the data shorn, County Administrator's Office County Counsel ATTESTSM-, N �`f Clamp of the, Contract Compliance Officer(via A/D) JOHBoard of rvl rs Il rk`il> isttatar Auditor-Controller 3 3� Buestad Construction, Inc. (via A/D) Yna ut Surety(via AID) ' p y Claudia J. Falconer(via A/D) M :amc:1s H:\2001\1350107\01110703 8b.doc 2 0£2 i Ij County of Contra Costa OFFICE OF THE COUNTY ADMINISTRATOR AFFIRMATIVE ACTION OFFICE I� 651 PINE STREET,MARTINEZ, CA 94553 (925)335-1045 FAX: (925) 646-1353 EKUE V(g CAO.CO.CONTRA-COSTA.CA.US MEMORANDUM BATE: October 7, 2002 TO: Board of Supervisors FROM: Emma IGuevor ` Affirmative Action Officer SUBJECT: RESTROOM FACILITY IN EXISTING HEADSTART CLASSROOMS AT 1001 S 57 TI STREET, RICHMOND► FOR THE COMMUNITY SERVICES DEPARTMENT Attached for your review and consideration is the documentation of good faith effort submitted by the low bidder, Buestad Construction, Inc. cc: Scott'Tandy, Chief Assistant County Administrator Silvana Marchesi, County Counsel Barton J. Gilbert, Director General Services Department Michael Lango, Deputy Director General Services Department a:bdgfeRRestoomFacH S Classrooms SY�dGiI/t7G 11;I.0 tAA SIU aC�t rues i y ,,04-VAN-4-(L"Onziurucrsivu �i uo�tan�;s� P. i Contra CCsta County t LrMFACH PROGRAM Arbxaative Action Office 651 Fine Sued,M CA.44553 (925)335-1045 Fex(925)646-1353 LETTER OF INTENT T'` TO PERFORM .AS A J SUBCONTRAMOR l n;?PP` .t M"MAC1'CMER t TRUCKER Name of Prime Conlraator kes+ 5711 ° Nmne of pmect 00 ` Project Number undersigned is a(.check one): Sole proprietorship PCotporation L=tedLwb>li;y - Pat hip saint Venrsre Check the following which may appy. MBE WEE SUE LBE Subcontractor ® Subcontractor — Subcontractor ® Subcartr'aator Supplier Supplier — Supplier — Supplier .,� Monufacturer Minuficturer — M u'facturer — Manufa sr Trucker 'Trucker Trucker — Trucker . .. 01aw -_----- ®-- _ 9th= — Other Other bescn-be Dascnbe Describe Descnbe None of the Above Apply The=dersiped is prepared to perform ifie following described work in co=ection with the above project(specify in de ll the particular work items or parts thereof to be performed). r o i Prime C to S jgnYosition Title Date Deanne of Per sonozrspI ` S Form f07 r Fax N=ber - t�.�aa�rs3s to at�tcro c .7r�raal DIVISION E- 18 Contra C Ona County C3U'I'RFACH MCfGRAM Aft`na=Ii Yr, A.ctiou Office 6:51 Puzc Street,Mai do ;CA 94553 (925)335-1045 Fax(925)646-1353 �. LETTER OF IN-YENT TO PERFORM AS A SUBCONTk ACTOk/Stj'PPLMR;MANUFACTURER 1 TRUCSv.[�`A Ve5j 4 _ .da. �. I n .,auac' �s�Faaaxi.: t":uaatth�:i�ar - / tt.�razc of Projcct I'rc�,cct Numbtsr ac a1T d=-safliaed is a (chick Cane): proprietorship C o pora6on _..� Limited Liability :Partnership .. Joint Venture Check the NO w *:v1)ich may a1)ply. 1E ' E SBE LBE subcontractor — Subcontractor ,k✓'Subcontxactor .,.,_„ Suocon#r for upplier Supplier -j,eSupplierr ..-,a, Supplier Manufacturer Manufacturer _... Manufacturer „r TV,i:nu-f==-ra-z �_ xuc.kex Trucker _ _ Trucker Trucker Otheer Other Olhc:z- escribe 'escxibe Descnbe Desmba None ofUlm Above Apply The rtncic`rsigr ed is pre pard to perform the failownr_g describcd work z i co=cctican.vrith the above-projcct(specify in detail the t� rtacular work. trerns or parte thereof to be perfo med), '1:trta.l Amouat Bid to Frime Contractor: S- ::26111 .;i z�atvzc Position litic late — — :N"ame of Person Completing thi&..onto z (,f3iI13 .ya exec N �3:1`'.rtlT't213t`Y t-1;�200 i\1150 i071Ol l i u7020x.doc (Rev,V72l02), DTV ISION X- i a E I TE zi i X x m ;zzz BMX � m xa, imOp mmm r m !m ml i im m mm rm ti ipspu, rn u rn# i im w xncn w m m IP rm rn cn i � 'Cyin n ics r ry h iC� n Rin r5 E Ono # ry m Eaia 0 0 0 0 00 E0 O c a O 000 a � °cao Imaa giro c� ;c r v ^o v ro # �s iii °v i� c z i t i i iia Q u � iro. i I�� i � J 9 i E � E l i i �m .•mt �'s m0 npp � r jii i i iE i iiE m i Ey4i t i ": >> i pI p j x` y p� p p p i p pipl m10 i° E?- s 0 > q im° ml m r. a -b # , z r ' vittas S I b ° #— v #° ° m© ° c v iwil ala n ' ' �i N cipc " 9 cora a i r N # i c,•r i O St I� r i I #in c N E N ` i1S S 10la � i'S iz r zIp 2 r, !G 'o d LA rnv, ° t cn o r�E �'E�' E zimir ! at �, 4 C5 51 t]ri C} g ati O 9a m2 o m a7ti a > s z o< �i z z m a tz �•p z i7 pl z , i 3`# E !� a O p -t 7 i..0 y; i C7 ci-{ O"<i-ti -{ # Imt`� m z r riffi r m at xe i iim es to n ° r c r z ni i y Ipi� ! aid :�; E %i tjil c sz ai 3m in c�nim u, y 5 mE �y i r Ir im z#z�E i E irn z t i'U a'° m{i!m Im mi .p r iz mj5 m m o c Z iaic E? is i ;73 -t' ,-� t;� I�„inC! tin ii D c v�iE� t0 m z'm m 'OI i ;� —i 0� id v'i P im m to iT M. 3c 2 M o 5Em f i E E7si i IZ "i z i jq ? y m s cZi P i z` i g i i m � i Ezf m� N z t ��'�� ;s eD toil Im r, jEE � a wt� ;.w, ur wc4 C7 cn � m •e>s� m ,,,,1 i a oio o enter ?' vicip aEw 1@biz Ec uN �a C. rs `�' E�. 8 ® M Emr T w awla'r w Nsl E M.0 k'3s iria Vivi Ir v © i= d ®G w C5 » Ew imD �. f3 .'9•N •'tiV s= '° ry tt w rs E � w a,c a is N iq C) Sii CIIGIa w{�I!!+ {r51 N a N C !1v bfim jp t t�. lry S ac cn N wig vt+e as cs I , c w v t a o i .�yt v� z i w 9$ r�7 w i•..a c wlN;m int Wim 3iJ i9 6 0 iI i'aama®oo twh m+rr�+xs'+eiIE'tC-rmv•nt 4irewdma Nsatoie.:cNww x7c? pNt �Nen �c�CZaS, ����o,t Nvui'i•E CZw�®7 tJ�E"x' wvw r_z #wb'ijN•w+hcmr SSSSSS�w�3:i�e�8e`xDrs ESur�5dn�esiiIEzWcOz c inaq C-crI tt ;7 'o CA 0 & w'Ca " ow�w " auN � Nrn IS C` + _qVJ w #d {.nt z! $ ° mM '00Ss 2 cz Cps �Y i z k V x d ° NE z;z z Ez w#o ,w If > i >�A pip p p `b o � �I+iii rcn SE ICI b I0`o `— Y 'z' "p ' C G 6' �{i C7 _ '1 C). # E lr< x 0 0 p0 �p1 0 � !�"'� zta ° hz x� c cI �o { t z p rm m 0 � R rix >0 `� L�+ { m; r z c CS 0� m.E z t�� z � z � s� � H 4 zm' i 5e fv zl' » m z i-E ? $ Z i Z E I I X -gam t � i iN;NE !� r�i 9P' •,�'i# w X E o f :m �' •z Twp?' � 8 IE Lil G R `� I 1 i i ! B rx 3 i i F. 3 EraIancrli i:ca MtlI;Cra?M � ra! PC � A4 ' i rd � o�rscsor ro ro v -u :u -0 'v E a �; 1 i t 3 1 i ; 1 I i i i E j i � � F l C d 0 9;0M ro 0 ua t m,�; i E�raiE » ,c ° r �'n m ro;cy 'm mE iz s 'fro; iy �i icy I� iC3j 0 a fa E z E 3 � i 3 �omu:im -G, 0 Olt -0 1 R,m 1aiZ i 'a0,y !20 -6i m �xr U 0z rr a`� t"=� d, i8f-' tnakiL� -1 V iA 6jY a$ N o 45 o Cs 7 �1 t7 ion t ,>ib" � >> ;0t chi chi .s b r- m ; r7 i ®z ca T 0 2Eb z t,. 1a7• 10 0 Im 0 t 0 O IV i t 1 E ant DIVISION E.Outreach ProgramAlandatory Subcontracting Minimum/Affirmativ6 Action and � tion; Equal Employment Opportunity for Use on County-Funded Construction Contracts of$50,000 and Greater l PROPOSAL All good faith effort documentation roust be submitted with the bid or within three (3) workingan � days hallowing the bid opening. S Failure to submit the required good faith effort documentation within three (3) workdng days following the bid opening may render the bid non-responsive. $, ' The County anticipated levels of to MBE Participation: 14% i WBE Participation: 6% -�Z 02 }r is 'rhe bidder is required to subcontract the following minimum percentage of its bid: o b Mandatory Subcontracting i I 130% I /20 - Minimum s (MSM) i I Requirement r by ` -- - i NOTE: Outreach Program information and/or assistance may be obtained ' i through. the County's Affirmative .Action Office at (925) 335-1045. t f Ert 11-�20i\13S410710x11o7G'2Qx.dac (Rev.2/22/02) DMSION P - 13 —mow --- ---- 1JUt:MLCLU kluxibLa'uc;tlull 100ol TX REPORT TRANSMISSION OR TX/RX NO 4783 CONNECTION TEL 19253137299 SUBADDRE S S CONNECTION ID ST. TIME 08/29 103:55 USAGE T 00'12 PGS, SENT 1 RESULT OR i uestad construction in MM Fax cover aneet To Organization Contra Costa.County General Services Fax No. 925-313-7299 From Brian Steiner Date 8128/02 Subject Restroom Facility Read Start Classrooms 10015. 576 street,Richmond Ca. Pages 1,including this one Please confirm the requirements for'Attending PreBld Meeting to meet the requirements for Goad faith Effort.I attended a previous meeting on August 21, 2002 for the Crime Lab Extension. ,}} ez 1 aEztz, 3za zj w x • w M rna;�,' mmm m m mm( m mi rnt mm ` uPt (uf (to a crn7 tvC5a n rCmr7, I 00 00n00, 9,(cdmRa ' i 'tH8o 0 d 0' } 3 p rtoi Ec vlv c7 i t� .00 fioil lot ; �'o9 e ? € I ZjC w i tf4 PC Es ; gp�t ti } r •d> x � s 't os a !> bE !a m n E >;>' >tpi� r ! E i }fit mw mist e r �d a tsar E at�'wc7oi is D w :{5 A r7 N ,r+ 4'�•'�' I v Ed c r d �� xis S c v x cl i } > i Iv -t 7t n n M Edr = At5 z m�rE C> si zt zsd d' ;d mtyi� ( ;^ x rn z z > d y x int z z a SIE ! eta rn (� a n �Ini rrr !c d. m x+ m E a z s ? ' (d 2 4) z -a� r zs xa' z v ;w �' r� tx'z, im t 1 C' r E7sf ? d d p lmlg �S tI m r »t ! tzn ah ^ j� ? ��•�, --i 3 m :o v 'an 3 �'t cr: ua �y ,rr �-,'•n ,v: ce 3 +d,n rn :,4ea,... v+'a m w E ' d 7w w;y w r r.s! wi w w o 0 atics V5 r tl;uc i, Z c< tl 0o.me�M plo o�� ;`rr-' in(v!m v" its cn & d S w wE n w:v d to n u w 4, rtlCot p (m mW t !rya l-S W ur E a t v, 'u w a '3 x 2 a C7 zo t7 u y6v rn r u7 `o +dD GSt ,� A{ 1!T4 V 4C !4 ?ll4 Pis .C. 0't .P SiV dR d 46 > b' >j5 w rs tllc5 E a tl d !W cn 1sx x C� o;y to m 613 WSW � 7.,tra .atltl 75 W ilatl u .+ o+ � W w wi,m ouC tl ctra � a vs 7n ioe sa o Gn o rn m tl(C o tx y+ catty?'' �o sw.�c` '; n o$= r,3iitz© Iry a t oa d is 3? 3(ta oa t7 w rs t- ra 4 by Cs Lill 4a,;', 0 W d ;z Utz( � t`w° z '� '::?�� zEx°' z�• � x� � '� r a w� h ro� .41 VRI 01 •htt<j fit t ty} 'D 0 S43 w �t1 t ? z Er? z vzV Z, iC ra c c (w? rnZm mtd m mx ?rnai � m vhim cs� wmx xw E , t M C "� r? m? 0 x ;czs u°7' z m a�! ta(ua 74 R rn m c! m z ¢ r ZIp; xth ixEx E rn o zt= ?o r z rws( at'�m� E t tl r r tl' ' ( d 1- 0 r�g r EEt t c . VI* n ` DIVISION E-Outreach Program/Mandatory Subcontracting MinimumlAf umative Action and iet Equal Employment Opportunity for Use on County-Funded Construction Contracts of$50,000 E and Greater �E a, the PROPOSAL j� Ids,t1, i All good faith effort documentation must be submitted with the bid or within, three (3) working days following the bid opening. Failure to submit the required good faith effort documentation within three (3) working days i following the bid opening may render the bid non-responsive. + The County anticipated levels of M. , o �E Participation: 14% � � E Participation: 6°1a z is The bidder is required to subcontract the following minimum percentage of its bid: f Wlt 1 ; Mandatory Subcontracting € I Minimum (MSM) ' 30°1d /�:z -�- by Requirement r 4 'OTE: Outreach Program information and/or assistance may be obtained €�I through the County's Affirmative .Action Office at (9.25) 335-1045. l l ro-1 s�l �i E! �E E li Co 41�o S�e, (�R� 'Oil I :\200'1\13501o7\011107020x.doc (Rm 2/22/02) DIVISION E- 13 } .. ........ COCO," vi r, ao Lvti3Litii WV, /WV4 erl DeLoache 825-377-5018 PCZ WE AFM FEMEMIMG COMA IMIS FROM ALL Dodge Construction Non SUBCONTPACIMS AM MATEMAL SUPPLEM DAILY PACIFIC BUILDER FM TM FOLLOMNO PAOJWM CFAM LAS EXT11MON FUR MCCraw-hitt,Inc. THE COMM OMA=*MSHMRff&COR011M Construction News Publishing Network wrote Com 06"*deipartmsnt of Gonerat "M M iflk&RMC4 SUN*9I Pub#ishees Affidavit Vlarlftw,CA me Ntr.: 1131d STATE CFFCALIFORNIA t�CountyoSon Franc-Woo Iss. C + gWe#c,OarAut 1,jj .st tc of the City and County of Saar Freanclaw, Stab► of Caafornis, having AkxnhmV040va F ffi� r drily been sworn,deposes and says: �� ° VIS ame,ft)*q& I am now and at ai1 tunas hare 0004A b"0vii PMWkst,%4%*01an inenliansd was a citizen of the United Stag 4adalilas,AMMrom H { .A WA_ of Amerioa, aver tw4nty�one years of age, MVAC tli O.Bwftvd.{�Srrltt"*sfiar,&Drb and competent to be a wits a can the E10 DATE SWMMBM V4 20M 0 2W PM hearing of the rnaders rnenlid to the Pn*4W8ftV*4dhmL4c annewmd printed copy notice(hereinafter set 'iiJ ' !!!! qE3'gow Att-WPM forth;I havw no ln*"t wh;rWowww In any at the said i ttsrs,I am now and du#ng all the RESTROOMFACL111YIN tImes mnbraced In the publioMon herein AIA MEAD9111MC'taS+ s mentis wan the CHIEF CLERK of the r a t fnttt�r�ae15e�1�tarfL Dodge Construction brews Dally sus= lam&a7m WON flw7dar, a mmpapor of general circulation i9e ta%"d,CA km titif7 printed ane publisher!daily In said City and County; as CHIEF CLERK during all the Tisdat"W'tbt o"• AsbestosAiallwnerlt� th-18% mentioned In the af5dravit l hwa had MrUM GA"VY"M"shGAMANP Custom C ewr#c,Kjsfr and I still have charge of all advettisemorte {ltlood i oc�tisr CJraar C31 ,G sit and ridoes published In said newspaper; Ste+R � m oil' es' tat said€agal nonce of which the ennead Is g a true printed copy was publshed In the BIoLIe1G.°fwt;3 1%2M2*2WPM above named newspaper on the following Pm43M6AaWa1MKrwgtn days to wit Tmsdwsa mbe@�r 10,2M at 940 AM Aierrtsda.CA 94601 1 certify(or declare)under penalty of perjury P3~+fB Phow 510-523-1825 Rax 510-623.20 that the foregoing is trues end correct.. C•ordaa Sdan 814m3'CXt.205 pe"J-P, �a11Lf i� �I�h�9r�Ctg i�iiia�r9 iS�l'j�D�OCl7, ° C rsraoc sthe ctxriw �4a :1. 'lec Signed. +�yi 1' t� ara#ar� }913 7X1 Chlef Clerk trios prtd t6 r3r>r�st #e lri ct$�afslo uBtAl, ,y�� ;�laaalAertlityr�db 'l�rs, we Pf Z1AL4qrtA t or so PfYra "triune �st�E^�s,C'e d� B020M DIXDAYS Fit SMOONTPACTIVM 1625 Van Meas,3d Floor NEAREAN EnU&OPPOMMYSUPLOYSt San Francisco,CA 94109 usr > t � �J ATTENTION: ESTIMATING DEPARTMENT To: Doug Snodgrass Organization: DMIta p y � W 441 Fax number. 510-544-526,5 j buestad From: Brian Stein E ritr aae' construction Date: 9r9/02 Ric. Pg. 1 of 2A/O E� ` o r- /D M /" /O t C INVITATION TO BID PROJECT: RESTROOM FACILITY IN PLEASE YAR.X THE FOLLOWING AND RETt3R11 EXISITNG HEADSTART CLASSROOMS CONTRA COSTA COUNTY 0 1 AM INTERESTED IN MORE INFORMATION f^yyf RICHMOND COMMUNITY SERVICES DEPT. PLEASE CALL OR FAX FURTHER ADDENDUMS, ECT. LOCATION: 1001 Sa 57"' STREET, RICHMOND CA. 0 I WILL NOT BE BIDDING ON THIS PROJECT ARCHITECT / ENGINEER: CLAUDIA J. FALCONER, A.I.A. P.O. BOX 70232 0 I WILL NOT BE BIDDING ON THIS PROJECT PT. RICHMOND CA. 94807-0232 BUT SEND US FURTHER INFORMATION ON FUTURE PROJECTS. PROJECT VAIN RANGE (APPROX.) : $120,400" TENTATIVE SCHEIDM.E: PER SPECFICATION DOCUMENTS , `lte-4- Yy. ESTIMATE PROJECT DURATION: 100 CALENDER DAYS PER SPECFICATION DOCUMENTS THIS IS A 3 PHASE PROJECT , DIVISION #1 - GENERAL REQUIREMENTS 019000 FACILITY DECOMMISSIONING (ASBESTOS ABATEMENT) :. ENVISION 1#2 - SITE CONSTRUCTION 022205 DEMOLITION (HARD) DIVISION #3 - CONCRETE � p , 030000 CONCRETE (BUILDING) 01+' 7- ho*)e aLr DIVISION #4 - MASONRY ft't 4✓r Y t~il� �sssaro DIVISION #d - METALS DIVISION 46 - WOODS 061100 ROUGH CARPENTRY 064000 CABINETS I ARCHITECTURAL WOODWORK 064:150 COUNTERTOPS DIVISION #7 - THERMAL & MOISTURE PROTECTION DIVISION+' #8 - DOORS & WINDOWS 082000 WOOD DOORS & FRAMES 087000 FINISH HARDWARE � .j p 4�e War/< 088100 GLASS & GLAZING 088300 MIRROR DIVISION #9 - FINISHES 092500 INTERIOR GYPSUM 096000 FLOOR COVERING 0990000 PAINTING & COATINGS a DIVISION #10 - SPECIAL'T'IES 101500 TOILET PARTITIONS 1081x0 TOILET ACCESSORIES (COMMERCIAL) DIVISION #11 .- E;UIPI-MNT ✓ °Gf Wo r DIVISION #12 _ FURNISHINGS DIVISION #13 - SPECIAL CONSTRUCTION DIVISION #14 - CONVEYING SYSTEMS DIVISION #15 - bZ-HA_NICAL 154000 PLUMBING DIVISION #15 - ELECTRTCA:.� 160000 ELECTRICAL )WALK THROUGH SC DULEt7 FOR., TUESDAY, 8 SEPT. 10"o, 2002 0 9:00 am BID PROPOSALS DUE BY: THURSDAY, SEPTEMBER,191", 2002 no later than 2:00 pm (PST) FOR PROPER EVALUATION PLEASE SUBNEITT 4 HOURS IN ADVANCE NOTES: - BIDS TO BE BASED ON COMPLETE SET OF BID DOCUMENTS (NOT SPECIFIC PAGES, SPECIFICATION SECTIONS, ETC., BID TO BE BASED ON PREVAILING WAGES FOR FEDERALLY- ASSISTED CONSTRUCTION PROJECTS, CONSULT SPECIFICATION BOOK, AFFIRMATIVE ACTION REQUIREMENTS ARE IN EFFECT PER SPECIFICATION DOCUMENTS FOR MBE,WBE,OBE,SBE,LBE,& MSM (MANDATORY SUBCONTRACTING MINIMUN) - WE RESERVE THE RIGHT TO REJECT any/and ALL BIDS, - OWNER TO OCCUPY PROJECT SITE, DURING CONSTRUCTION, - SOME TRADES ARE REQUIRED TO MAINTAIN ACCESS THROUGH WORK AREAS SUBCONTRACTOR'S WILL BE REQUIRED TO FURNISH PROOF OF A CURRENT CALIFORNIA STATE CONTRACTOR'S LICENSE, - SUBCONTRACTOR'S WILL BE REQUIRED TO NAME: BUESTAD CONSTRUCTION, THE OWNER, AND ARCHITECT, ETC ADDITIONALLY INSURED (FORM CG2010 11/85), NOTE: IF YOU NA25.E "ALL CALIFORNIA. OPERATIONS" YOU DO NOT HAVZ TO g SPECIFICALLY NAM THE OWNER, SUBCONTRACTOR'S WILL BE REQUIRED T INTAIN $I 10 gi # g � SUPPLI _ REE aH .. Y3 UT$Q�Nca IN A PROPOSAL THEY AGREE i TO ALL STANDARD (UNMODIFIED) TERMS & CONDITIONS AS SET FORTH IN THE BUESTAD CONSTRUCTION SUBCONTRACTOR & PURCHASE ORDER AGREEMENTS, A COMPLETE SET OF PLANS, SPECIFICATIONS, AND ADDENDA (IF ANY) ARE AVAILABLE FOR C .dt �6^tAv� INSPECTION AND USE IN OUR PLAN' ROOM. PLEASE CALL BRIAN STEINER (510) 523-1925 x 205 FOR AN APPOINTMENT TO REVIEW THE CONTRACT DOCUMENTS.PLANS AVAILIBLE IN MOST BUILDERS EXCHANGES AND PURCHASE FROM THE GSA CONTRA COSTA COUNTY 925-313-7200 FOR $25 510 5231925 !ax 523 2088 788 Stewart court , re5� l-tc�h� aiarneda ca 04501-2100 B 3 8 0 3 7 6 . 4. tU VAA 0XV JLJ LUQU 3.fuesunu uo nSLruction U }1 s s s TX REPORT t TRANSMISSION OK TX/RX NO 4960 CONNECTION TEL 3468925 SUBADDRESS CONNECTION ID ST. ITT 00,31 12:46 S-10- 3 6 PGS. SENT 2 RESULT OK 0 d-� - - d ATTENTION: EBTZMATING DEPARTbm I"i 5JR it GSA* L"t*'� - To: organization: Bluewater Enviromeata.l Fax number: 51.0-346-8924 b u a sta d From: Briars Steiner nnstructi n Date: 9/9/02 inc Pg, 1 of 2 M INVITATION TO BID PROJECT; RESTROOM FACILITY IN PLEASE MARK THE LLOWING AM RE*fi'MW EXISITNG READSTAR'T CLASSROOMS CONTRA COSTA COUNTY 0 I AN INTERESTED IN MORE INFOP4MATION RICHMOND CO NI`IY SERVICES DENT. PLEASE CALL OR FAX FURTHER ADDENDUMS, ECT, LOCATION: 1001 S. 57" STREET, RICHMOND CA, 0 I WILL NOT HE BIDDING ON THIS PROJECT ARCHITECT / Ett30'X1Q31EE£Z: CLAUDIA J. FALCONER, A.I.A. P.O. BOX 70232 0 I WILL NOT BE BIDDING ON THIS PROJECT _T. RICHMOND CA. 94907-0232 BUT SEND US FURTHER INFORMATION ON FUTURE PROJECTS. PROJECT VALLZ RANG (APPROX.) : $120,40011 TENTATIVE SCNZDME; PIER SPECIFICATION DOCUMENTS ESmIMI&TE PROJECT DLRATIr9N: 100 CALENDER DAYS PER SPECFICATION DOCUMENTS THIS 15 A 3 PHASE PROJECT DIVISI0N #1. - GENERAL REQUIRENENTS 019000 FACILITY DECOMMISSIONING (ASBESTOS ABATEMENT) DIVISION #2 - SITE CONSTRUCTION 022205 DEMOLITION (HARD) DIVISION #S - CONCRETE 0302000 CONCRETE (BUILDING) DIVISION #4 - MASONRY DIVISION #5 - ilETALS DIVISION #6 - WOODS 061100 ROUGH CARPENTRY 064000 CABINETS 1 ARCHITECTURAL WOODWORK �` is . a arsn a u ats &vb tSuesLF3u uonstruction 001 �c TX REPORT *$* TRANSMISSION OK TX/RX NO 4957 SCONNECTION TEL 2591715 UBADDRESS CONNECTION ID ST. TIME 09/09 12:20 �Y tyG�t USAGE T 01,00 PGS. SENT 2 / RESULT OI{ 175 ATTENTION: ESTIMATING DEPARTbdENT To: Sal Vaccarro Organization: Synergy Fax number: 510-259-1715 buestad From: Brian ;Steiner construction Date: 9/9/02 inn Pgt 1 of 2 low M'M INVITATION TO BIL) PROJECT: RESTROOM FACILITY IN PLEASE MARPC THE HOLLOWING AND RETURN EXISITNG HEADSTART CLASSROOMS CONTRA COSTA COUNTY 0 I AM INTERESTED IN MORE INFORMATION RICHMOND} COMMUNITY SERVICES DEPT. PLEAS: CALL OR FAX FURTHER ADDENDUMS, ECT. LOCATION: '1001 S. 37"N STREET, RICHMOND CA. 0 I WILL NOT BE BIDDING ON THIS PROJECT ARCHITECT / ENGINEER: CLAUDIA J. FALCONER, A.I.A. P.O. BOX 70232 0 I WILL NOT BE BIDDING ON THIS PROJECT PT. RICHMOND CA. 94807-0232 BUT SEND US FURTHER INFORMATION ON FUTURE PROJECTS PROTECT VALUE RANGE (APPROX.) . $120,400" T AT SCHIDLW: PER SPECFICATIONI DOCUMENTS ESTItMTB PROJECT DURATION- 100 CALENDER DAYS PER SPECFICATION DOCUMENTS THIS IS A 3 PHASE PROJECT DIVISION #1 - GENERAL REQUIREMNTS 019000 EACIL`1TY DECOMMISSIONING (ASBESTOS ABATEMENT) DIVISION #2 - SITE CONSTATJCTION 022205 DEMOLITION (IHARD) IIIVISIO #3 - CONCRETE 030000 CONCRETE (BUILDING) DIVISION #4 - MASONRY DIVISION #5 - I-MTALS DIVISION #6 - WOODS 061100 ROUGH CARPENTRY A I_`A nn(I. r'AMTi VTQ' 1 °t�t7('t":7�T+'G'l""'TTIAIlT. TATflnriulnpK t{l. Uui : TX REPORT :�s E TRANSMISSION OIC TX/RX NO 4955 CONNECTION TEL5445296 '' S BADDRESS CONNECTION ID ST. TIME 09/09 12:17A USAGE T 01`42 PGS. SENT 2 —/b— OZ — 3 i 36P vj RESULT OK ibr y ' ATTENTION: 'ESTIMATING DEPARTMENT To: bong Sri �a�a Organization: DMI Fax numzaer: 510-544-5266 ue8tad From, Brian Steiner construction Data: 9/3/02 inc Pg. I of 2 MM ' 1 ww : INVITATION T4 BID I PROJECT, RESTROOM FACILITY IN PL E MARX THE VOLLO ING A2JI) i73RN EXISITNG HEA,DSTAR'T CLASSROOMS CONTRA COSTA COUNTY 0 I AM INTERESTED IN MORE INFORMATION RICW61OND COM14UNITY SERVICE'S DEFT. PLEASE CALL OR FAX FURTHER ADDENDUMS, ECT. LOCATION: 1001 S. 5 iTH STREET, RICHMOND CA, 0 I WILL NOT BE BIDDING ON THIS PROJECT ARCHITECT / ENG12 EER: CLAUDIA J. FALCONER, A.I.A. P,O. BOX 70232 0 I WILL NOT BE BIDDING ON THIS PROJECT PT, RICHMOND CA. 94807-0232 BUT SEND US FURTHER INFORMATION ON FUTURE PROJECTS. PROJECT VX= RANGE (APPROX.) : $120,400' TENTATI`i7E SCHEDULE: PER SPECFICATION DOCUMENTS ESTIMATE PROJECT DURATION: 100 CALENDER DAYS PER SPECFICATION DOCUMENTS THIS IS A 3 PHASE PROJECT DIVISION #1. - GENERAL REQUIRE NTS 013000 FACILITY DECOMMISSIONING (ASBESTOS ABATEMENT) DIVISION #2 - SITE CONSTRUCTION 022205 DEMOLITION (HARD) DIVISION #3 - CONCRETE 030000 CONCRETE (BUILDING) DIVISION #4 - MASONRY DIVISION #5 - METALS DMVISION #6 - WOODS 06II00 ROUGH CARPENTRY n c n nnn r`UnT"W T q / AT2r 9TTFF"Tf!RAT, WOnMWCORK ..,•. �......v arsaa ws,v u�Qv 4Uvu 15i1CCtiLF2LL l.U11hL1'UCL1O11 001 $S TX REPORT :k:R �S�$S3�Cdk���C��5�5��$�8C�S8CiIu�K� TRANSMISSION OIC TX/RX NO 4954 CONNECTION TEL 19256851774 ,j � SUBADDRESS CONNECTION ID q ST. TIME 09/09 12:12 USAGE T 04'51 kerb LalrG IGS. SENT `�� RESULT OK ATTENTION: ESTIMATING DEPARTMENT To: Walter Lunning Organization: ACM Fax number: 925-685-1.774 byes -ad Frost: Bra an Seiner ConstrUCt1Qn Date: 9/9/02 !no i Pg. 1 Of 2 ww : II INVITATION TO BID o cT: RESTROOM FACILITY IN PLEASE MARK THE FOLLOWING AND RETURN EXISITNG HEADSTART CLASSROOMS CONTRA COSTA COUNTY �a y�� ��a y y 0 1 AM gqINTERESTED �IyN MORE INFORMATION RICHMOND COMMUNITY SIRVICES DEPT. ?LEASE CALL OR FAX FURTHER ADDENDUMSr ECT. LOCATLON: 1001 S. 57" STREET, RICHMOND CA. 0 I WILL NOT BE BIDDING ON THIS PROSECT ARCHITECT / M2 GXNZ ,. CLAUDIA +7. FALCONER, A.I.A. P.O. BOX 70232 0 I WILL NOT BE BIDDING ON THIS PROJECT PT. RICHMOND CA. 94807--0232 BUT SEND US FURTHER INFORMATION ON FUTURE PROJECTS. PP.0 ECT VALUE RANGE (APPROX.) : $120,400" TENTATIVE SCHEDULE: PER SPECdICATION DOCUMENTS EST TR PROv"EC`i' SURATXON: 100 CALENDER SAYS PER SPECFICATION DOCUMENTS THIS IS A 3 PHASE PROSECT DIVISION #1 - GENERAL REQUIEtEI-dENTS 019000 FACILITY DECOMMISSIONING (ASBESTOS ABATEMENT) DIVISION #2 - SITE CONSTRUCTION 022205 DEMOLITION (HARD) DIVISION #3 - CONCRETE 030000 CONCRETE (BUILDING) DIVISION #4 - MASONRY DIVISION #B - NMTALS DIVISION #6 - WOODS 061100 ROUGH CARPENTRY __ e -- -....,....,,- i w r.,-, mr..nm rin" r<Tnh:lT'.7o"1L7 Yt -••• v••• v� aLtCbt,tCLl 1.illi!!Llluc L lull 'c{/ilU01 s TX REPORT TRANSMISSION OK i TX/RX NO 4953 �� .' ,2.030 CONNECTION TEL 4444930 SUBADDRESS CONNECTION ID J ` ST. TIME 09/09 12:10 USAGE T 00'57 PGS. SENT 2 RESULT OK ATTENTTON: ESTIMATING DEPARTMENT ToJim Martin Ora nization: Lignum Vitae Fax number: 510--444-4930 buestad Frc::c:: Brian Steiner construction 9/9/02 inc pg. i Of 2 MM low i INVITATION TO BID I PROTECT: RESTROOM FACILITY IN gLEASM MARx THE FOLLOWING AND FZ"SMW EXISITUG HEADSTART CLASSROOMS CONTRA COSTA COUNTY 0 I AM INTERESTED IN MORE INFORMATION RICHMOND COMMUNITY SERVICES DEFT. PLEASE CALL, OR FAX FURTHER ADTDENDUMS, ECT. LOCATION, 1001 S. 57" STREET, RICHMOND CA. 0 I WILL NOT BE BInnING ON THIS PROJECT ARCHITECT / =GINEER: CLAUDIA :7. FALCONER, A.I.A. P.O. BOX 70232 0 1 WILL NOT HE BIDDING ON THIS rROUECT PT, RICHMOND CA. 94807-0232 BUT SEND US FURTHER INFORMATION ON FUTURE PROJECTS. AR03SC'T VALUE MANGE (APPROX.) : $120,400" TENTATIVE SCRE;DXMM: PER SPECFICATION DOCUMENTS .ESTIMATE PROJECT D1JRA'"ION: 100 CALENDER DAY'S PER SPECF?CATION DOCUMENTS THIS IS A 3 PHASE PROJECT DIVISION #1 - GENERAL REgUIRE�_NTS 019000 FACILITY DECOMMISSIONING (ASBESTOS ABATEMENT) DIVISION #2 - SITE CONSTR7JCTION 022205 DEMOLITION (HARD) DIVISION #3 CONCRETE 030000 CONCRETE (BUILDING) DIVISION #4 - MASONRY DIVISION #5 - XXTALS DMSION #$ - WOODS 061100 ROUGH CARPENTRY t nr r<v RL+.^mT1A2 7. TxTllfli1Tn71! 2TC -- ----- lltLUbLla %lWlbLr*ucLf011 1c,001 t e TX REPORT TRANSMISSION OK i { TX/RX NO 4952 CONNECTION TEL 19252152251 SUBADDRESS CONNECTION IIS ST. TIME 09/09 12:07 USAGE T 00'59 PGS. SENT 2 RESULT OK ATTzNTION. ESTIM&TING DEP'ARTWNT To: Justin Gosnell, Organization: Complete Door Systems Fax number: 925-215-2251 buestad From.: Briar. Steiner construe-tion gate: 9/9/02 1C3C PG, 1 of 2 M' INVITATION TO BID PROJECT: RBSTROOM FACILITY IN PI-EASE tGM THE VOLIZWING AM RETURN SSCISITNG HEADSTART CLASSROOMS CONTRA COSTA COUNTY 0 I ANS INTERESTED IN MORE INFORMATION RICHMOND COMMUNITY SERVICES DEPT, PLEASE CALL OR FAX FURTHER ADDENDUNIS, ECT, LOCAT»ON: 1001 S. 57" STREET, RICHMOND CAn 0 I WILL NOT BE BIDDING ON THIS PROJECT ARCHITECT / ENGINEER: CLAUDIA J. FALCONER, A.I.A. P,O, BOX 70232 0 3 WILL NOT BE RIDDING dV THIS r-RojECT PT. RICHMOND CA. 34807-0232 BUT SEND US FURTHER INFORMATION ON FUTURE PROJECTS. PROw`'ECT VALT.IR RANG (APPROX.) : $120,400" TENTATIVI SC:HMULZ: PER SPECF—CATION DOCUMENTS ESTIMPeTZ PROJECT DVISATTON, 10; CA.LENDEI2 GAYS PER SPFCFICATION DOCUMENTS THIS IS A 3 PHASE PROJECT DIVISION #1. - GENERAL RE UIREbZNTS 019000 FACILITY DECOMMISSIONING (ASBESTUS ABATEMENT) DIVISION #2 - SITE CONSTRUCTION 022205 DEMOLITION (.HARD) DIVISION #3 - CONCRETE 030000 CONCRETE (BUILDING) DIVISION #4 - MASONRY DIVISION #S - NETALS O1: SION #6 WOODS 061, 100 ROUGH CARPENTRY 064000 CABINETS 1 ARCHITECTURAL WOODWORK 09/09/02 12:07 FAX 510 523 2085 Buestad Construction �001 p.. TX REPORT 11.ms+• i i :ksk�ks���sk�R���ksksk:�8s�ea�si€�:kY,t i TRANSMISSION OK See TX/RX NO ' 4951 CONNECTION TEL 2810131 i # SUBADDRESS CONNECTION ID ST. TIME 09/09 12:06 ! USAGE T 00'54 PGS. SENT 2 RESULT OK # ATTENTION: ESTn4XTING DEPARTMENT To. Mask Pence organization: Economy Lumber Tax number; 510-251-0131 b u e.$tad From, Brian Steiner construction Date: 9/9/02 i00 Pg. 1 of 2 ft M I 1ww INVITATION TO BID3 PROJECT: RESTROOM FACILITY IN PLEASE MARK THE FOLLOWING AND RETURN EXISITNG HEADSTART CLASSROOMS CONTRA COSTA COUNTY 0 I AM INTZRES ED IN MORE INFORMATION RICELM014D COMMUNITY SERVICES DEPT. PLEASE CALL OR FAX FURTER ADDENDUMS, ECT. LOCATION- 1001 S. 57T" STREET, RICHMOND CA. 0 I WILL NOT BE BIDDING ON THIS PROJECT ARCHITECT / ZNG-n4ZMR: CLAUDIA J. FALCONER, A.I.A. P.O. BOX 70232 0 I WILL NOT BE BIDDING ON THIS PROJECT PT. RICHMOND CA, 94807-0232 BUT SEND US FURTHER !NrORMATION ON FUTURE PROJECTS. PROJECT VALt-l- RANGE (APPROX.) : $120,400" TENTATIVE SCH=`UI *. PER SPECFICATION DOCUMENTS ESTnGLTZ PROJECT DtMILTION: 100 CALENDER DAYS PER SPECFICATION DOCUMENTS THIS IS A 3 PHASE PROJECT DIVISION #1 - GENERAL REQK-IREMNTS 019000 , FACILITY DECOMMISSIONING (ASBESTOS ABATEMENT) DIVISION #2 - SITE CONSTRUCTION 02220..5 DEMOLITION (HARD) DIVISION #3 - CONCRETE 030000 CONCRETE (BUILDING) DIVISION ##4 - MASONRY DIVISION #5 - METALS DIVISION #6 - WOODS 061100 BOUGH CARPENTRY 1F411!11 rAfiTNXTS / ARCHITECTURAL WOODWORK -S gip oe 02 12: 50p Eccnom�d Lumber Oakland (v 1 Eva 3 261 -0131 P. 1 Conr�i;rucC.on flt31✓Ot7? ? ATTENTION. ESTUtkT1NQ DEPARTMENT 7—16 To s Mark Pence _ organizat-'O.1: Economy :,untie. ' ` ' f �' lr i ✓� i} Fax nunber: 510-261-01;31 bueisia ErOTtt; Brian cat! St@?net i g �es�rrod�yae construction � Date; 9/9/02 ,� ,`SfJ�r 6+"� � I INVITATION TO BID RESTROOM FACILITY IN PV:,ASP zeUtx THE T=,LLWrHG i3YD PSTUPW EXISITNG SF,ADSTAR£ CLASSROOMS C✓3NTP.A COSTA COUNTY I AM INTERESTED 1N MORE I-Ny V-kMTION RICHMOND Ci0fiOMNITY SERVICES DEPT. PLEAst CALL OR 6A% FJR°t`Ftmt AntSENt]uw, ECT. LOCATZt7OT 1001 S. 57y" STREET, RICHMOND CA, 0 1 WILL NOT BE BIVOING OI THIS PROJECT ARCHI ECT i MGINNSA: CLAUDIA 3. FALCON", A.I.A. P.O. BOX 70232 0 a !$ILL NOT BE BIDDING ON THIS PROJECT P:. RICHMOND CA, 94801-0232 4L'T "sF.ND U5 FURTHER INF'04ATION ON FUTURE PRWECTS. VROnCL VALM RAMS (APPA07C.): $120,400" 'iZW2ATr.M 9C'HE9ULE: PER SPECFICATION DOCUMENTS ESTIMATZ PAO=T IAMATION: 100 CALENDER DAYS PER SP T_CFICATTON, DOCUMENTS THIS TS A 3 PHASE PRCJE:T aOZVES$rJN 1#3 GEMER,A`s. REQUIRE, LITS 019000 FACILITY DECOMMISSIONING (ASEES'T:)S ABATFMFNT) OIVTSIOX t#2 - SITE CONSTRUCTION 022205 DEMOLITION (fl ARD) Y3MSION #3 - CONCRETE 030000 CCNCRET : (BUILDING) DIVISION #4 - MASONRY DIVISION #5 - IaT.ALS ���,�,t� r DIVISION #6 - S V Vf 061100 ROUGH CA?,PZNT'RY 064000 CABINETS / ARCHITECTURAL WOOD`~ORV 064150 COUNTERTOPS DIDISION #1 - THERMAL & -MOISTURE wTucTION TrDI BION #8 -� DOORS & '4n2�DOWS w.._ 082000 WOOD BOORS & FRAMES 081000 FINISH HARDWARE 088100 GLASS & GLAZING 088300 MIRROR DIVISTONT $9 - 1'I14ISHSS� 092500 INTERIOR GYPSUM 096000 FLOOR COVERING 099000 PAINII`ING f COATINGS / r � 1 vv/Va/ vc ".vu VAA asv uZa Gvba buestaa Lonstruct2021 �00� i E TX REPORT { TRANSMISSION O TX/RX NO 4950 CONNECTION TEL 1.6502597584 SUBAD33RESS CONNECTION ID ST. TIME 091139 12:04 USAGE T 01'52 PGS< SENT 2 RESULT Ox e40, c� , ATTENTION' ESTIMATING DEPARTMNT To: Frank Norman Organization: Bair Area Builder's Hardware Fax number.- 650--259-7584 buestad From: Brian Steiner construGtion Bate: 9/9/02 Pg. 1 of 2 MMImm i i INVITATION IOLy TO BID PROJECT: RESTROOM FACILITY IN PL$ASZ MARK THE FOLLOWING XM RZT-UM EXIST NG HEADSTART CLASSROOMS CONTRA COSTA COUNTY 0 I AM INTERESTED IN MORE INFORMATION RICHMOND COMMUNITY SERVICES DEPT. PLEASE CALL OR FAX FURTHER ADDENDUMS, ECT. LOCATION: 2001 S a 57'4 STREET, RICFL'+St7ND CX. 0 I WILL NOT BE BIDDING ON HIS PROJECT ARCHITECT / ENGINEER: CLAUDIA J. FALCONER, A.T.A. P.O. BOX 70232 0 I WILL NOT BE BTDDING ON THIS PROJECT PT. RICHMOND CA. 54807-0232 BUT SEND US FURTHER INFORMATION ON .FUTURE PROJECTS. PROJECT VALUE R MCE (APPROX.) : $120,400" 2v"'TATIVE SCHEDULE: PER SPECFICATION DOCUMENTS ZSTIMATE PROJECT DURATION, 100 CALENDER BAYS PER SPXCFICA:ION DOCUMEINTS THIS 19 A 3 PHASE PROJECT DIVISION ##1 -- GENERAL RE221REMNTS 01.9000 FACILITY DECOMMISSIONING (ASBESTOS ABATEMENT) DIVIS10K. #2 - SITE CONSTRUCTION 1022205 DEMOLITION (HARD) DIVISION #S - C014CRETE 080000 CONCRETE (BUILDING) DIVISION ##4 - bOLSONRY DMSION ##5 - METALS DIVISION #6 - WOODS 061100 ROUGH CARPENTRY • . ._�.._........«4...,.,.,.. ..ter.s.:-.w.ror.ntr --- uav r.uvu DUUb"Lu tst333S�L"Eli E I{3Z1 s �UJ1. r, v TX REPORT �x k TRANSMISSION OK TX/RX NO 4949 CONNECTION TEL 19258271583 SUBADDRESS CONNECTION ID ST. TIMT i�1 01,S1 51 12:24 ✓�e � �" � �"�. 4 �/ 7 USAGE T PGS. SENT 2 . RESULT OSI w.�7"�;- ATTENTION: ESTII4ATING DEPAR',t'NENT Kevin Lowe Organization: Diablo Valley Drywall Fax number: 925-921-1593 buestad From; Brian Steiner construction Data: 9/9/02 It 1 Pg. 1 of 2 INVITATION TO BID } PRR3=CT: RESTROOM FACILITY IN PL SE MARX THE FOLIDMM AM RETLMN EXISITNG HEADSTART CLASSROOMS CONTRA COSTA COUNTY 0 I AM INTERESTED IN MORE INrORHAT"ION RICHMOND COMMUNITY SERVICES DEPT, PLEASE CALL OR FAX FURTHER ADDENDUIMS, ECT. LOCli'I'ION.- 1001 S. 57"" STREET, RICHMOND CA. 0 I WILL NOT BE BIDDING ON THIS P'_xOa.CT AR,CF:IT'RCT / zrYG ER: CLAUDIA J. FALCONER, A.I.A. P.O. BOX 70232 0 I WILL NOT BE BIDDING ON THIS PROJECT PT. RICHMOND CA, 94807-0232 BUT SEND DS FURTHER INFORMATION 011 FUTURE PROJECTS. PROJECT VALUE R7L''gGZ (AF X.): $120,400" TENTATIVE SCHEDULE. PER SPECrICATION DOCUMENTS ES'TIMTZ PROJECT DURATION: 100 CALENDER DAYS PER SPECF°ICATION DOCUMENTS THIS IS A 3 PHASE PROJECT Dryisiox #I. - GENERAL REgtJIREMNTS 019000 FACT-LIT-Y DE,COMIMISSION`ING (ASBESTOS ABATEMENT) DIVISION #2 - SITE CONSTRUCTION 022205 DEMOLITION (HARD) DIVISION #S - CONCRETX 030000 CONCRETE (BUILDING) DIVISION #4 - XhSONRY DIVISION #5 - MTALS DIVISION #6 - WOODS 061100 ROUGH CARPENTRY ; Lta(`Tdf7&t ^'(iRAi WCODIWORK -- --- -- f UeNLaa uonsrruction 001 TX. REPORT :�RSSSffi5�:��S��S�S�E9��Ss& TRANSMISSION OK TX/RX NO 494$ ' CONNECTION TEL 4367550 SUBADDRESS CONNECTION ID //,, ST. TIME 09/09 12:00 �� "" ` 4 6`23 116 USAGE T 01`42 PGS. SENT gra, RESULT OIC ATTEiviON: ESTIMATING DEPARTMENT T0. Armondo El tondo Organization: Elizondo Drywall .G`17f a►tc. Fax number: 510-436-7550 buestad From.: Brian Steiner Late: 519/02 ot5cJe +f 'C Z l6�tc construction k °Pg. 1 of 2 aarrr. INVITATION TO BID E PROJECT: RESTROOM EACILI Y IN PLZASE MARK THE FOX NG AND PZr,.&tN EXISITNG HEADSTART CLASSROOMS CONTRA COSTA COUNTY 0 I AM INTERESTED IN MORE INFORMATION RICHMOND COMMUNITY SERVICE'S DEPT. PLEASE CALL OR FAX FURTHER ADDEN;UYS, ECT. LOCATION: =001 S. 57'' STREET, RICHMOND CA. 0 I WILL NOT BE BIDDTNG ON THIS PROJE'C'T` ARCHITSCT / ENGINEER: CLAUDIA J. FALCONER., A.I.A. P.O. SOX 70232 0 I WILL NOT BE 'BIDDING ON THIS PROJECT PT. RTCHMOND CA. 94907-0232 BUT SEND US FURTHER INFORMATION ON FUTURE PROJECTS. PRoaECi VAnTUZ RANGE (APPROX.) TWTATM SCHEDULE; PER SPECFICATION DOCUMENTS ESTIMATE PROJECT =tA.TION* 100 CALENDER DAYS PER SPECFICATICN DOCrMENTS THIS IS A 3 PHASE PROJECT DIVISION ##1 - GENERAL REQUIREIVZNTS 019000 FACILITY DECOMMISSIONING (ASBESTOS ABATEMENT) DIVISION #2 - SITE CONSTRTZCTION 022205 DEMOLITION (HARD) DIVISION #3 - CONCRETE 030000 CONCRETE (BUILDING) DIVISION #4 - MASONRY DIVISION #5 - METALS DIVISION #6 - WOODS 061100 ROUGH CARPENTRY i W n(lnWORK buestaa construction 1 001 TX REPORT s** TRANSMISSION OK TX/RX NO 4547 CONNECTION TEL 6525344 SUBADDRESS CONNECTION ID / ST. TIME 09/05 12:22 ,�/�`f'" GJ-2 16 USAGE T 00'45 PGS. SENT 2 ,1 RESULT OK 77 ATTENTION. ESTIMATING DEPARTMENT To: Andrei Wallace Organization: Anderson Carpet. Fax number: 510-652-5544 bue$tad From: Brian Steiner construction Date: 9/9/02 Etc Pg. l o--f 2 INVITATION TO BID PROJECT: RESTROOM FACILITY IN PLEASE HAM THE FOLLOWING Amis RETtMN EXISITNG HEADSTART CLASSROOMS CONTRA COSTA COUVTY 0 I AM INTERESTED IN MORE INFORMATION RICHMOND COMMUNITY SERVICES DEPT. PLEASE CALL OR FAX FURTHER ADDENDUMS, ECT. LOCATION: 1001 S. 57" STREET, RIC LMOND CA. 0 I WILL NOT BE BIDDING ON THIS PROJECT AR,CHI",%CT / ENGINEERt CLAUDIA J. FALCONER, A.I.A. P.G. BOX 70232 0 I WILL NOT BE BIDDING ON THIS PROJECT PT_ RICHMOND CA. 949107-0232 BUT SEND TIS FURTHER INFORMATION ON FUTURE PROJECTS. P'ROJEC'T VALUE P"GE (APPROX.) : $120,400" TENTATIVE $CHID=, PER SPECFICATSON DOCUMENTS ESTIMATE P'RO.79CT DMkATION.' 100 CALENDER DAYS PER SPECFICATION DOCUMENTS THIS IS A 3 PHASE PROJECT DIVISION #1 - GENERAL REQLSIRSbZ-NTS 019000 FACILITY DECOMMISSIONING (ASBESTOS ABATEMENT) DIVISION #2 - SITE CONSTRUCTION 022205 DEMOLITION. (HARD) DIVISION #3 - CONCRETE 030000 CONCRETE (BUILDING) DIVISION _#4 - MASONRY DIVISION #5 - METALS DIVISION #6 - WOODS 061100 ROUGE: CARPENTRY 064000 CABINETS / ARCHITECTURAL WOODWORK ss v4u 6.Vt7 r! ... ..:: ... .... ..... .. ....... se TI REPORT TRANSMISSION OK TI/RI NO 4946 CONNECTION TEL 19256740338 SUDADDRESS i CONNECTION ID ST. TIME 09/09 11:58 USAGE T00'58 '2 - 6 `3 PGS, SENT 2jrl. RESULT OK 17-0 4 .. p .{.`�' vlle',S"5 6 ,fir '`11.014'1-le ito'°�-� ATTENTION: ESTn4ATXNC DEPARTMNT f~e;a To. Andrew Burke organization; CFI Floors Fax nuT e.r: 925-674-0338 b ectad From, Brian Steiner construction Date: 9/9/02 4f�0 PCS. 1 of 2 INVITATION TO BID PRO CT: RBS'TROOM FACILITY IN ?LTCAw xkRx Tnm FmLownm ATOD RETURN EXISITOG XADSTART CLASSROOMS CONTRA COSTA COUNTY 4 1 AM INTERESTED IN MORE INFORMATION RICHMOND COMMUNITY SERVICES DEPT. PLEASE CALL OR FAX FURTHER ADDENDU14S, ECT. LOCATION: 1001 S. 57'"" STREET, RICHMOND CA. 0 I WILL NOT BE BIDDING ON THIS PROJECT ARCHITECT? / TONC,12 ZZR: CLAUDIA J. FALCONER, A.I.A. P.O. BOX 74232 4 I WILL NOT BE BIDDING ON THIS PROJECT PT, RICHMOND CA. 94807-0232 SGPT SEND US FURTHER INFORMATION ON FUTURE PROJECTS. PRO,TZCT VALUE RANGE (APPROX.) : $120,40011 VENTATIVE SCMMULE: PER i?v-CFICA.TION DOCUMENTS EST -TR PROJECT DURATION: 140 CALENDER BAYS PER SPECFICATION DOCUMENTS THIS IS A 3 PHASE PROJECT F3:tTTSI4N #1 - GENBRALt3ZREMENT S 0190100 FACILITY DEuONIISSIC�NING (ASBESTOS AHAr E:3EIIT) DrVISICIN #2 - SITE CONSTRUCTION 022205 DEMOLITION (HARD) DIVISION #S - CONCRETE 030000 CONCRETE (BUILDING) DIVISION #4 - M&SONRY DIVISION #$ - METALS DIVISION #6 - WOODS 061100 ROUGH CARPENTRY - w .nrsn 1m Yn7J"nnrATnP;( v�rvsry tf,:�t cYa «��u AL3 LtifiF? @iuestau construction {701 ���4sR��#SSsR�sfik�S��sks�skE TX REPORT SS�S:k�sks���RS��sk��k�k�sB�k i TRANSMISSION OK TX/RX NO 4945 CONNECTION TEL 19254559034 SUBADDRESS J CONNECTION ID �� ST. TIME 09/09 11:57 USAGE T 00,53 ( -�" -O-Z 10 PGS. SENT 2 RESULT OK ATTENTION: ESTIMATING DEPAR7NT To: E. Turman Organization: Jim Staggs Fax number: 925-455-9034 buestad I From: Brian Steiner construction f Date: 9/9/02 Inc Pg. _ of 2 M t INVITATION TO BID i PROJECT, RESTROOM FACILITY IN PLZA.SZ MAK THE POlX'0wXNG AND RETURN ISITNG HEADSTART CLASSROOMS CONTRA COSTA COUNTY 0 I AM INTERES'TE'D IN MORE INFORMATION RICHMOND COMMUNITY SERVICES DEPT. PLEASE CALL OR FAX FURTHER ADDENDUMS, ECT. LOCATION: 1001 S. 57" STREET, RICHMOND CA. 0 I WILL NOT BE BIDDING ON THIS PROJECT ARCHITECT J ENGINEER; CLAUDIA JD FALCONER, A.I.A. P.O. BOX 70232 0 I WILL NOT BE BIDDING ON THIS PROJECT PT. RICHMOND CA. 94807--0232 BUT SENO VS FURTHER INFORMATION ON FUTURE PROJECTS. PROJECT VALUE RANGM (APPROX.) : $120,400" +ENTATSVH SCHEDULE: PER SPECFICATION DOCUMENTS ESTn4ATE PRO MOT DURAfi?C,N; 300 CALENDER DAYS PER. SPECFICATION DOCUMENTS THIS IS A 3 PHASE PROJECT DI'V'ISION #1_ GENES RE UIRZMENTS 019000 FACILITY DECOMMISSIONING (ASBESTOS ABATEMENT) DIVISION #2 _ SITE CONSTRUCTION 022205 DEMOLITION (HARD) DIVISION #3 - CONCRETE 030040 CONCRETE ',BUILDING) DIVISION #!'4 - MASONRY DIVISION #5 w MS'TALS DIVISION #6 - WOODS 061 100 ROUGH CARPENTRY 064000 CABINETS / ARC-HITECTORAL WOODWORK "Ucobau 11ullb l.l'UUL lull 001 TX REPORTa� { TRANSMISSION OR TX/RX NO 4944 CONNECTION TEL 19252299501 SUBADDRESS CONNECTION ID ST. TIME 09/09 1.1.55 ` USAGE T 00'54 PGS. SENT 2 RESULT OTS ATTENTION- ESTIMATING DEPARTMENT To; Joe Darden Organizations J. Darden Painting Fax numbers 9257229-9501 buestad From: Brian Steiner construction Pg 9/9/02 Inc `-'�1 1 of 2 INVITATION TO BIO E PROJECT: RMSTROOM FACILITY IN PLEASE b0JM THZ FOLLOWING AND RETURN EXISITNG HEAD5TART CLASSROOMS CONTRA COSTA COUNTY 0 I APS INTERESTED IN MORE INFORMATION RICHMOND COW—UNITY SERVICES DEPT. PLEASE CALL OR FAX FURTHER AD08NDUMS, ECT. LOCATICV� 1001 S. 57T" STREET, RICHMOND CA. 0 I WILL NOT BE BIDDING ON THTS PROJECT ARCHITECT / ENGINEER. CLAUDIA J. FALCONER, A.I,A. P.O. BOX 70232 0 1 WILL NOT BE BIDDING ON THIS PROJECT PT. RICHMOND CA, 99807-0232BUT SEND US FURTHER INFORMATION ON FUTURE PROJECTS. PROJECT VALUE RANGE (APPROX.) : $120,400" TZRTA'TTVE SCHEMMZ-: PER SPECEICATION DOCUMENTS ESTIMATE PROJECT VUPATION: 100 CALENDuR DAY'S PER SPECFICATION DOCUMENTS THIS IS A 3 PHASE PROJECT DIVISION #1 — GZNZRAL REQUTREMENTS 019000 FACILITY DECOMMISSIONING (ASBESTOS ABATEMENT) DTV�LSION #2 — SITE CONSTRUCTION 022205 DEMOLITION (HARD) DIVISION #3 Y CONCRETE 030000 CONCRETE (BUILDING) DIV'"SION #4 — MASONRY DIVISION #5 METALS DrVISION #6 ^ WOODS 051100 ROUGH CARPENTRY 01 ;4 n'Mr) CABINETS / ARCHITECTURAL WOODWORK i TX REPORT t TRANSMISSION OK TX/RX NO 4943 CONNECTION TEL 2869993 CONNECTION ID 5Y> G. TIit31 PSON>SUBADDRESSv" ✓ y ST. TIME 09/09 11.54 USAGE T 0(1'84 �w(���?� " ��� J� , PGS. SENTOK ! E✓�z3 {/ 2 RESULT ATTENTION: ESTIMATING DEPARTMENT To: John Fish Organization: W. G. Thompson Painting Fax number: 510-236-9993 bus-stad From: Brian Steiner construction Date. 9/9/02 1nr. Pg. 1 of 2 INVITATION TO BID I S PROJECT: RESTROOM FACILITY I:4 PLEASE MAM 192 rOLLOXING AND RXTUR.N EX:SITNG HEADSTART CLASSROOMS CONTRA COSTA COUNTY 0 I AM INTERESTED IN MORE INFORMATION RICHrNIaOND COMMUNITY SERVICES DEPT. ?LEASE CALL OR FAX FURTIHER ADDE:3DUMS, ECT. LOC,'ATMON: 10101 S. 57'x" STREET, RICHMOND CA. 0 I WILL NOT BE BIDDING 014 THIS PROJECT ARCHITECT / ZtCINEER: CLAUDIA J. FALCONER, A.Z.A. P.0, BOX 70232 0 I WILL NOT BE BIDDING ON THIS PROJECT PT. RTCHMOND CA. 94607-0232 BUT SEND CTS FURTHER INFORMATION ON FUTURE PROJECTS. PROJECT VALUE V14GE (APPROX.) : $120,400" TENTATIVE SCHEDULE. PER SPECFICATION DOCUMENTS ESd3MATE PROJECT DUPATION: 100 CALENDER DAYS PER SPECFICATION DOCUMENTS THIS IS A 3 PHASE PROJECT DIVISION #1 - GENES REQ 3. ErtTs 019000 FACILITY DEaCOMMISSIONING (ASBESTOS ABATEMENT) DIVISION #2 -- SITE CONSTRUCTION 022205 DEMOLITION (HARD) DIVISION #3 - CONCRETE 030000 CONCRETE (BUILDING) DIVISION #4 - MAS014RY DIVISION #.S - METALS DIVISION #6 .. WOODS 061100 ROUGH CARPENTRY 064000 CABINETS / ARCHTTECTURAL WOODWORK 064150 COUNTERTOPS __. _ _ _____ _ ,, ucic�zccia rwxiacaut Lieu 1gju0 . skKs ie TX REPORT i TRANSMISSION OK TI/RSC NO 4942 CONNECTION TEL 6553118 SUBADDRE S S CONNECTION ID ST. TIME 09/09 11:53 USAGE T 00,53 JT�� OK SENT 2 ATTENTION: EsTnaTING DEPART1XXT To: Jay Garner Organization; Global Steel Products Fax number: 510-655-3118 buestad 1 From: Brian. Steiner CG� 15CtSO€1 Tate: 919/OZ f 2 !no o MM 3 INVITATION TO BID { PR,Oa3C`Y9 RESTROOM FACILITY IN PLEASE MAIM TIM 73V LZOW:ING AND "'aURN EX: SITNG HEADSTART CLASSROOMS CONTRA COSTA COUNTY 0 I AM INTERESTED IN MOM INFORMATION RICHMOND COMMUNITY SERVICES DEPT. ?LEASE CALL OR FAX FURTRER ABi3ENDUMS, ECT. LOCATION: 1001 S. 57" STREET, RICHMOND CA. 0 1 WILL NOT BE BIDDING ON THIS PROJECT ARCHITECT / ENGn ER, CLAUDIA J. FALCONER, A.I.A. P.C. BOX 70232 0 I WILL NOT BE BIDDING ON THIS PRO,;ECT FT. RICHMOND CA. 94907-0232 BUT SEND US FURTHER INFORMATION ON FUTURE PROJECTS. PRO=C'T VALLA RANC9E (APPR=.) . $120,400" TENTATIVE SCHEDULE, PER SPECFIC:ATION DOCUMENTS E°ST MkTZ PROJECT DURATION*1x.00 CALENDER DAYS PER SPECFICATiON DOCUMENTS THIS IS A 3 PHASE PROJECT DIVISION #1 - GENERAL QUI NTS 019000 FACILITY DECOMMISSIONING (ASBESTOS ABATEMENT) DIVISION #2 - SITE CONST'RUC'TION 0222035 DEM07-ITION (HARD) DIVISION #3 - CONCRETE 030000 CONCRE'T'E (BUILDING) DIVISION #4 - MASONRY DIVISION #a - bSTALS DIVISION #S - WWDS 061100 ROUGH CARPENTRY 064000 CABINETS 1 ARCHTTECTU AL WOODWORK TX REPORTxs TRANSMISSION OE TX/RX NO 4941 CONNECTION TEL 588486 SUSADDRE S S CONNECTION IO � ST. TIME 09/09 11:51 USAGE T 01,00 PGS. SENT 2 RESULT {IK q- y ATTENTION. ESTIMATING DEPAF2TMEN7 To: Estimator Organization: Service Steel Products Fax number: 510--558-4836 b€ a tad prom* Brian Steiner c.o nstructic n Date: 9/5/02 iI1G Pg. 1 of 2 INVITATION TO BIDI PROJECT: RESTROOM FACILITY IN PLZASE HARK THE MLLOWING AM RETURN EXISITNG HSADSTART CLASSROOMS CONTRA COSTA COUNTY 0 1 AM INTERESTED IN MORE INFORMATION RICHMOND COMMUNITY SERVICES DEPT, PLEASE CALL OR FAX FURTHER ADDENDUMS, ECT. LOCATION: 1011 S. 57Tx STREET, RICHMOND CA. 0 I WILL NOT BE BIDDING ON THIS PROJECT ARCHITECT / ENCINEER. CLAUDIA J. FALCONER, A.I.A. F.O. BOX 70232 0 I WILL NOT BE BIDDING ON THIS PROJECT E£. RICHMOND CA. 54807-0232 BUT SEND US FURTHER INFORMATION ON FUTURE PROJECTS. PROJECT VALUE RANGE (APPROX.) -. 4120,400" TENTATIVE SCHEDULE. PER SPLCFICATION DOCUMENTS ESTn&-'E PROJECT MIRATIONs 1.00 CALENDvR DAYS PER SPFCFICATION DOCUMENTS THIS IS A 3 PILA-5F; PROJECT DIVISION #I - GENERAL REQlgn E 6 NTS Oi9O0O FACILITY DECOMMISSIONING (.ASBESTOS ABATEMENT) DIVISION #2 - SITE CONSTRUCTION 022205 DEMOLITION (HARD) DIVISION #2 - CONCR TZ 030000 CONCRETE (BUILDING) DIVISION #4 - MASONRY DIVISION #5 M TALS DIVISION #6 -- WOODS 061100 ROUGH CARPENTRY 064000 CABINETS / ARCHITECTURAL WOODWORK %,uj4be.l UUL1U11 t t301 TX REPORT TRANSMISSION OK TX/RX NO 4940 CONNECTION TEL 19169$$102$ SUBADDRE S S CONNECTION Ib q ~� 09/09 11:49 't � ( ST. TIME {j USAGE T 01,53 PGS. SENT 2 RESULT OKw:11 ATTENTION- ESTSNSATINC i)EPARTMENT To: Greg Whelan organization: Whelan Fax number: 926-988-1028 buestad From: Brian Steiner Construction Date., 9/9/02 illi pg. 1 of 2 mm INVITATION TO BID PROo-ECT< RESTROOM FACILITY IN PLZASE bVULK TRE FOLLOWING AkM REQ EXISITNG HEA2DSTART CLASSROOMS CONTRA COSTA COUNTY 0 1 AM INTERESTED IN MORE INFORMATION RICHMOND COMMUNITY SERVICES DEPT. PLEASE CALL OR FAX FURTHER ADDENDLMS, ECT. I=ATION; 1001 S. 57" STREET, RICHMOND CA. 0 1 WILL NOT BE BIDDING ON THIS PROJECT ARCKITECT / ENOTMER: CLAUDIA J. FALCONER, A.I.A. P.O. SOX 70232 0 S WILL NOT BE BIDDING ON THIS PROJECT PT. RICHMOND CA. 54$07-0232 BUT SEND IIS FURTHER IN€'ORMATION ON FUTURE PROJECTS. PROJECT VAI." RANGE (APPROX.) : $120,400" `IENTA,TM SCR9OMM: PER SPECF'ICATION DOCUMENTS ESTIbMTZ PROJ3CT D[SPATION: 100 CALENDER DAYS PER SPECKCATION DOCUMENTS THIS IS A 3 PHASE PROJECT DIVISION ##I - 6ENER RE L3IREMENTS 019800 FACILITY DECOMMISSIONING (ASBESTOS ABATEMENT) DIVISION ##2 - SITE CONSTRUCTION 022205 DEMOLITION (HARD) DIVISION #3 - CONCRETE 030000 CONCRETE (BUILDING) r)IVISION ##4 - MASONRY DIVISION ##5 -- METALS DIVISION ##S - I)S 61100 ROUGH CARPENTRY 064000 CABINETS / ARCHITECTURAL WOODWORK 064150 rn?jZT7PTnp," __. __. -_ _�, ... _.;<. .,�., .,.,., �v„v uur:r,�.ecu �yate�c.a•uc:�tcsaa t�#t3t31 TX REPORT TRANSMISSION OK E TX/RX NO 4939 CONNECTION TEL 14157522309 °] / SUBADDRESS ' 1 I "` 2" � ,26 CONNECTION ID ST. TIME 09/09 11:48 USAGE T 00,56 PGS. SENT 2 sl:! 4 �. RESULT OE ATTENTION: ESTIMATING DEPARTMENT 0p-"-°p/ `s4X 7' 5<.ej" C' To: Estimator e Organization: Black Sea Corporaton E Fax n{amber: 415-752-2309 buastaa From, Brian Steiner-ml-6211 cons-truction � Date. 9/9/02 ✓1��� t��'y 4 4141 ...e inc Pg. 1 of 2 ' INVITATION TO BID PROJECT: RESTROOM FACILITY IN PLEASE bv.R`!C THE FOLLOWING ANIS RETURN EXISITNG HEADS"TART CLASSROOMS CONTRA COSTA COUNTY 0 I AM !VTERESTED IN YORE INFORMATION RICHMOND COMMUNITY SERVICES DEPT. PLEASE CALL OR FAX FURTHER ADD RUMS, ECT. LOCATION: 1001 S. 57" STREET, RICHMOND CA. 0 I WILL NOT BE BIDDING ON THIS PROJECT ARCHITECT / ENGINEER: CLAUDIA u'. FALCONER, A.I,A. P.O. BOX 70232 0 1 WILL NOT BE BIDDING ON THIS PROJECT PT. RICHMOND CA. 94807-0232 BUT SEND US FURTHER INFORMATION ON FUTURE PROJECTS. PROJECT VALUX MANCE (APPROX.). $120,40011 TE—STATIVE 9CHECAZ,E: PER SPECFIC.ATION DOCUMENTS ESTIMATE PROJECT DtWATION: 100 CALENDER DAYS PER SPECFICATION DOCUMENTS THIS IS A 3 PRASE PROJECT DIVISION #1 — GENERAL REQUIREMENTS 019000 FACILITY BECOMMISSTONING (ASBESTOS ABATEMENT) DIVISION #2 -- SITE CONSTRUCTION 022205 DEMOLITION (HARD) DIVISION #3 -- CONCRETE 030000 CONCRETE (BUILDING) DIVISION #4 — MASONRY DIVISION #5 — METALS DIVISION #S — WOODS 061100 ROUGH CARPENTRY nrlcnnn rARTMI TR / ARrRT'"fRrTURAT: WOODWORK WJuui a.+ucc+�au W4raiss Gdtkt'LiVaa E :ce TX REPORT 4 TRANSMISSION OK TX/RX NO 4934 19253729448 CONNECTION TEL SUBADDRESS CONNECTION ID ST. TIME 09/09 11:40 USAGE T t10'S5 PCS. SENT 2 RESULT OK _� ;� ' '• 5 5✓�l'�E ATTENTION: ESTIMATING DEPARTMENT To: Jahn Charpion organization: Champion's Plumbing �+ypp.�y\rt 1i{q�(.a� F�a�/x number: ��9yy25-372i-e9�4n4 e8�v+ buestad From: Dylan S-1-e ne construction Date: 9/9/02 inc Pg. 1 of 2 INVITATION TO BIL' PROJXCT: RESTROOM: FACILITY 'IN PLEASE XhRK THE FOILONIXG AND FATURN ZXISITNG READSTART CLASSROOMS CONTRA COSTA COUNTY 0 1 AHS INTERESTED IN MORE INFORM 110N RICHMOND COMMUNITY SERVICES DEPT. PLEASE CALL OR FAX FURTHER ADDENDUMS, ECT, tOMTIONt 1001 S. 57T4 STREET, RICHMOND CA. 0 I WILL NOT BE BIDDING ON THIS PROJECT ARCHITECT / E=TTMZRe CLAUDIA J. FALCONER, A.I.A. P.O. BOX 70232 0 1 WILL NOT BE BIDDING ON THIS PROJECT PT. RICHMOND CA. 94807-0232 BUT SEND US FURTHER INFORMATION ON FUTURE PROJECTS. PROJECT VALUE RAN= (APPROX.): $120,400" TMMATTIVVE SCHEDULE: PER SPECFICATIDN DOCUMENTS SST TR PROJZGT DURATSGN.' 100 CALENDER DAYS PER SPECFICATION DOCUMENTS THIS IS A 3 PHASE PROJECT DIVISION #1 - GENERAL I EgLTlIRZMNTS 019004 FACILITY DECOMMISSIONING (ASBESTOS ABATEMENT) DIVISION #2 - SITE CONSTRUCTION 022205 DEMOLITION (BARD) DIVISION ##3 - CONCRETE 030000 CONCRETE (BUILDING) DIVISION #4 - MASONRY DIVISION #a -- METALS DIVISION #6 ` WOODS 061100 ROUGH CARPENTRY 064000 CABINETS / ARCHITECTURAL WOODWORK 064150 COUNTERTOPS --. _- -.-•- --,- --- ---- AjUvmLcsu %,Vitb Ll-t2UL1.Vif 'y�l.-U()I TX REPORT 5 TRANSMISSION OK i TX/RX NO 4935 CONNECTION TEL 19258370418 SUBADDRES S CONNECTION ID ST. TIME 09/09 11: 41 USAGE T 91,02 PGS. SENT 2 RESULT OK ATTENTION- ESTIMATING DEPARTMEI3T1�j"�YY' C� ko€"'�s To: Richard Madrid Organization: Madrid Plumbing Y'� Pax number: 925-337-0418 buestad From: Brian Steiner construction Date: 9/9/02 IOC Pg. I of 2 : INVITATION TO BID PFcOvECT: REV-ROOM FACiL%TY IN PLZASE b1ARK THE P=Of ING .ANMD RETURN EXISITNG HEADSTART CLASSROOMS CONTRA COSTA COUNTY 0 I AM INTERESTED IN MORE INFORMATION RICHMOND C;;EM7NITY SERVICES DEPT. PLEASE CALL OR FAX FURTHER ADDENDUMS, ECT. LOCXTIONT: 1001 S. 511" STREET, RICHMOND CA. 0 I WILL NOT BE BIDDING ON THIS PROJECT ARCHITECT / ENG ER: CLAUDIA J. FALCONER, A.I.A. P.O. BOX 70232 0 I WILL NOT BE BIDDING ON THIS PROJECT PT. RICHMOND CA. 94807-0232 BUT SEND US FURTHER INFOR1143ATION ON FUTURE PROJECTS. PROJECT VALUE RANGE (APPROX.) - $120,400" TFATTA.TnM SCREDtILE: PER SPECFICATION DOCUMENTS ESTIMATE PROJECT DURATION: 1.00 CALENDER DAYS PER SPECFICATION DOCUMENTS THIS IS A 3 PHASE PROSECT DIVISION ##1 - GENERAL RRQi3IRZl-ZNTS 019000 FACILITY DECOMMISSIONING (ASBESTOS ABATEMENT) DIVISIO14 #2 - SITE CONSTRUCTION 022205 DEMOLITION (HARD) DIVISION #3 - CONCRETE 030000 CONCRETE (BUILDING) DIVISION #4 - MASONRY DrVISION #5 - 2ZTALS DIVISION i#S - woos 061100 ROUGH CARPENTRY 064000 CABINETS / ARCHITE'C'TURAL, WOODWORK rsues c sou Sufis c x'u�t 3oz1 !"001 e TX REPORT TRANSMISSION OK i TX/RX NO 4935 CONNECTION TEL 5220951 j SUBADDRE S S CONNECTION ID 09/09 11:43 ST. TIME. USAGE T 00'54 BGS. SENT 1,1-Y� fPtyf 1./" ftGh s l G ' RESULT OK �tV r S fi -�"t% fi '`tae t S jam° . ATTENTION: ESTIM&TINO DEPARTMENT To: Jim Cox organization: Olsson Plumbing Fax n?: ber: 510-522-0951 buestad Fror: Brian Steiner CCiI S i'lt lCft I Date: 9/9102 inc Pg, 2 MM low INVITATION TO BID PROZZCT: RESTROOM FACILITY IN I?=&sz mRR Tuz P'Q'Swwnia Am REQ EXISSTNG HEADSTART CLASSROOMS CONTRA COSTA COUNTY 0 T AM INTERESTED IN MORE INFO&MATION RICHMOND COQ UNTTY SERVICES DEPT. PLEASE CALL OR FAX FURTHER ADDENDUMS, ECT. LOCATION, 1001 S. 57TM STREET, RICHMOND CA. 4 I WILL NOT BE SIDDInC ON THIS PROJECT ARCHITECT f ENOXNEZ.: CLAUDIA C. FALCONER, A,T.A. P.O, SOX 70232 D I WILL NOT BE BIDDING 023 THIS PROJECT PT, RICHMOND CA. 94807-0232 BUT SEND 'US FURTHER INFORMATION ON FUTURE PROJECTS. "PR03VCT VALLTF, RANGE (APPROX.) : $120,400" TENTATIVE SCREDMZ: PER SPECFICATION DOCUME;TS ESTIMATE PR CT DMATXONi 100 CALENDER DAYS PER SPECFICATTON DOCUMENTS THIS IS A 3 PRASE PROJECT DIVISION ##1. — GENERAL RE2111REMMTS 019000 FACILITY DECOMMISSIONING (ASBESTOS ABATEMENT) DrV'ISION ##2 - SITE CONSTRUCTION 022205 DEMOT TTION (HARD) DIVISION #3 - CONCRETE 030000 CONCRETE (BUILDING) DIVISION #4 — MASONRY DIVISION 45 - METALS DIVISION #t6 - WOODS 05..10 0, € OUGH CARPENTRY 064000 CABTNE' S l ARCHITECTURAL WOODWORK 09.4 1 Cr rnrzx+.m r�mnnn oat Q)uft9 12.44 PAX 610 523 2085 Duestad Construction ATTENTION; ESTIMATING DEPARTt4ENT To: Organize ion: Express Electric Fax n-amrber: 510 524^2617 buestad ( From: Brian Steiner construction (1 Date: 399IO2 1 of 2 IBM INVITATION TO I XUX tXISSTXG XEADSTART CLASSA00 9 CONTRA (;OSTA COVNT—k` 0 z TAZZMSTXV IN MORE TVTOT.MA'TXON AXCEIMOND C`•CSMUNITY 38RVICES 77EPT. PL SE ; L OR FAX FURTREER ADOZNDM4S, ECT. CATION; '100. 8. b7" S`AZET, RXC�H+.n6ON0 CA. / ILL XOT 8E STDDIN0 ON THZ5 PROJECT AAC4tzTZC'T / ENOlNVXP-- 00LA`UDIA. J. rALCt?lEERe .U. '.3'7X 70252 0 1 WILL NOT' BE 5IDDING ON THIS PROJECT PT, RICHMOND CA. 94S07R0232 BUT SING U8 iUR`."HER INk'ORMATIONC ON EICTURE v20JF:Ci.�i. RAO-JECCT VAXUV PANCX (APPROX.); $120,400" TENT-A:TVI SCR=tME. PXR. 5FECFICAT 0'X DOCUMENTS FSTXXhTX PlkOJ'NCT bt7 ha2O23: 100 CALENbER DAYS PMR SPECF!CArlO,° DOCUMNTTS T415 13 A 17RASE PAOJECT DTVISI`O $#1._- GENERAL MQVI 12 NTS -9000 FACILITY DEECCOWdISSZONING (ASSSSTOS .A.SATEMSNT) 33IVT8I0I4 42- SITE CONSTRUCTION' X22105 -- - 0Ev,OL1TION (HARD) DIVISION #3 - TE "';30000 CONCRETE (BUILDING) DI'V'IF;ON #4 -• HASOVRY DIVISION #5 - WTAuS DTVISIQN #6 - MOBS TROUGH CARPENTRY OCU CABINETS f ARCHT'TECTURAL WOODWORK 1?5th COUNTERTOPS DIVISION #7 - THEP44AL 9. MOISTURE PROTECTION DIVISION#8 - DOOItS & WINDMS WOOD DOORS & PRAMr-S t.,'7000 FINISH HARDWARE +G GLASS & GLAZING ?B OJ MIRROR '�,--42500 INTERIOR GYPSUbd sJOC PAINTING & COATINGS __. __ ___� _ b+uGStGitX tvitacYtit tiVE4lvj U 0 1 TX REPORT p TRANSMISSION OK TX/RX NO CONNECTION QN TEL19255569442 •�" � SUBADDRESS t CONNECTION ID ST. TIME 09/09 11.39 /0;,02Aft USAGE T 9€3"32 / PGS. SENT 2 RESULT OK La t/,- (1�do> 1<40 I ATTENTION: ESTIMATING DEPARTMENT To* Harlan Carlson Organization: Northern States Electric Fax number: 925-556-9442 buestad Front: Brian Steiner construction Date: 9/9102 Inc E Lig. 1 of 2 low INVITATION TO BID PROJECT., RESTROOM FACILITY IN PLEASE bVJM THE FOLLOWING AND RETURN EXISITNG H;A;) TART CLASSROOMS CONTRA COSTA COUNTY 0 I AM INTERESTED IN MORE INFORMATION RICHMOND COMMUNITY S&RVICES DEPT. PLEASE CALL OR TAX FURTHER ADDENDUMS, ECT. LOCATION: 1001 S, 577" STREET, RICHMOND CA. 0 I WILL NOT BE BIDDING ON THIS PROJtCT ARCHITECT 1 ENGINEXR: CLAUDIA J. FALCONER, A,I.A. P.O. BOX 70232 0 I WILL NOT BE BIDDING ON THIS PROTECT PT. RICELMOND CA. 548037-0232 BUT SEND US FURTHER INFORMATION ON EFtT;.`URE PROTECTS. PROJECT VALUE RANGE (APPROX.) : $120,400f1 TENTATIVE SCMMtMV. PER SPECFICATION DOCUMENT'S EB'SIMATP PROJECT 1} TION: 100 CALENDER DAYS PER SPECF ICATION DOCUMENTS THIS IS A 3 PRASE PROJECT DMSION #1 - t NLS RZs2n =NTs 019000 FACILITY DECOMMISSIONING (ASBESTOS ABATEMENT) DIVISION #2 - SITE CONSTRCICTION 022205 DEMOLITION (HARD) DIVISION #!3 -- CONCRETE 0300€79 CONCRETE (BUILDING) DIVISION #4 - MASONRY DIVISION #S w METALS DIVISION #6 - WOODSY O 61'Q 9 ROUGH CARPENTRY 064000 CABINETS / ARCHITECTURAL WOODWORK ...,, v,,. ».. .a.c:.-Lv s•ca�s ��.v...u�.a svts.s .......t3Lft3CiLELt3. trC>I3tiC.C'EfGI.LO.[3 �t3t31 �e TX REPORT i E TRANSMISSION OK TX/RX NO 4935 CONNECTION TEL 19254844548 SUBADDRESS CONNECTION ILS � � 16 �r+�olkrc� i�r ST. TIME 09/09 12:09 00,53 1 V44( 64d pil USAGE T PGS. SENT 2 Gs, RESULT OK ATTENTTO'X: ESTIMATING DEPARTMENT To. Barri eVlGrawOrganization: Gooldctric i Fax number; 925-484-4548 b $ $ From: Brian Steiner conS it C iCi Cate- 919102 ` Pg, 1 of 2 inc INVITATION TO BID PROJECT: RESTROOM FACILITY IN BLZASZ MARX TEE FOLLOWXNG, AND RZTT N EXISITNG HEADSTART CLASSROOMS CONTRA COSTA COUNTY 0 I AM INTERESTED IN MORE INFORMATION RICHMOND COMMUNITY SERVICES DEPT. PLEASE CALL OR FAX FURTHER ADDENDU`4S, ECT, LOCATION: 1001 S. 57Th STREET, RICHMOND CA. 0 1 WILL NOT BE BIDDING ON THIS PROJECT ARCHITECT / ENGnMER: CLAUDIA J. FALCONER, A.I.A< P.O. SOX 70232 0 I WILL NOT BE BIDDING ON THIS PROJECT PT, RICHMOND CA. 94807_+3232 BUT SEND US FURTHER INFORMATION ON FUTURE PRO,-ECTS. PROJECT VALUE RANGE (APPROX.) : $120,40011 TENTATIVE SCHEDULE: PER SPECFICATION DOCUMENTS XSTI &TE PROJECT DURATION: 100 CALENDER DAYS PER SPECFICATION DOCUMENTS THIS IS A 3 PHASE PROJECT DIVISION #1 - G-ENERA'L REQUIREMENTS 019000 FAC-rLITY DECOMMISSIONING (ASBESTOS ABATEMENT) DIVISION #2 -- SITE CONSTRUCTION 022205 DEMOLITION (HARD) DIVISION #3 - CONCRETE 030000 CONCRETE (BUILDING) DIVISION #4 - MASONRY L MSION #5 - METALS 5IVISlold #6 - WOODS 061100 ROUGH CARPENTRY 064000 CABINETS I ARCHITECTURAL WOODWORK __ `.Y t , t Condition 6 PLEASE REFER TO CONDITION 5 SUBSECTION All follow up notes are in the upper right hand side of original solicitation to bid fay.. - 77 WS ARE REOU INN QU T'S`A`l`M S FROM ALL, Dodge .iStttEi flrf News SUBCONTRACTORS QUALif�eD D8E?MWJ1! 66MMS�d�M f AM MATMAL SUPPLIXi S DAILY PACIFIC BUILDER FIM rr4E MLLOWING PA0J l&* CRM LAB EXTENSION FOR MoG rava-ilu,Inc. TM CON+f"F`SA COWA C 3UN TY SHERRI &CCfONIM Construction Now*Publishing Network contra c4sta C'DepiartmWa of t3ermw ,t' M*ford,&AN 201 Pubus5sr's Affidavit Mw*wr,CA F"No--z STATE OF CALIFORNIA XMdU bdLKI%,ttd0mMd-`FcMC&vaift. County of Sen Francisco )83, CaWSWAMhWdural t,Uxk,QxrftetM frtbutr&rs bvrrrsf f'�FkssCsirt�t�ris�,"f�t�hl�r�r.�i�e!I�p I,7erl!2gLMrhg of to City and County of tioint�t�detet l+r,^xd t xs& , San Francisco, Slant* of C1Bf0mra, havrng AWfinu sWrtdc ,R*h Gi=U r duly#seers swum,deposes and says: Qyp-rv� 0QVMV � l am now and at alt tunes taretn err Oodngr.,krPdF%eac6m mmeniioraaPd was a d0zon of the Unite$totos ftedallea,HVAC a$,vK 84peo rr��W of Arnwina, owr twenty-me rare of o9o9 rY.. ♦ •p^i snit cornpotant to be a witness on the 800AM SWC 1d,2M s0 tit PM hearing of the maders mentlorled In the PM-W 9sr Wad1WQ 4C annotod prhted copy notice herainalter set r fiber-%2W2 jft`tib PfW[ forth,1 haw no lntwwt wharixosver In any of the said matters;l am novwd during all the PESTW lr PA YN '. tknes embraced In the pubilcatlon herein /VA,-2 E09714dHOWWARMASSROOM mentioned was tate CHIEF CLERK of the Ax**Owft GooWCountyrrCSorrrtsxJr*SoMkoastZ�l�rrrE Dodge Construction News Dazy Faosto IMI&Wlh~ f?etxer, a newspaper of general circulation l e woukCA7 s printed and published daily In said City and County; as CHIEF CLERK during all the IMAM Mclinja bt Ug mt 1mjW t=AlbactsAbS*rs3nk times mentioned In the affidavit I have had MnIM CA"Mys FfWMV W%Atft Custom C&Sewrxk,Rush and l still have charge of ail advertisements Wood Doom,Door f^ tka clam%GyMurn Sowd end nodcss published In said newspaper RSI r g,ftintang,Tdat as, that said legal notice of whIch the annex Is PUsr1*U&lli, a true printed copy was published In th WOtaA e SEPTEMM 19,2002*IM PM above named newspaper on aha followIng Sea WAWWDt#xt days to Wit Tess+ , enberItl,2=at*WAft 768 St mit Court Aima.CA 94501 1 csrti;y(or ueciare) under neral#y of perfurp Pkohie — PhMW 51"23-IM F 510-W3-20W that the foregoing Is tme and corract. CcntwtBdanSWmrexL205 Frans and 3peca ars torr arx! art ow'�, Signed j 0"MW9d GwvW Sw*" M313-7= Chief Clark sssaa lin! PWxxt Uv%d oma'et rCx t*At ttae trfstda �-`i-,4 VM MC �st'PfUMMIA-UMCAMOM OF RM PACMdAl.fttt+Ut3 c„etAkl' W-WE DUO DATE FRCM SUSCONTPAOMiS 1625 Van Ness,3d Floor MARE AN WJ&CPPORT01M EURZ"tM San Francisco,CA"109 ttgsss ATTENTION: ESTIMATING DEPARTMENT To. Doug Snodgrass organization: D4I +���y e W ry Fax number: 510-544-5266 uestad From: Brian Steiner construct€cry Date: 9/9/02 yyyy inc Pg. 1 of 2 !"�ece `{ry D n a 4:' � INVITATION TO BILA { PROJECT: RESTROOM FACILITY IN PI,EASz MARX THE romolva%NG" AND REtL3RN r,0-., t EXISIT1iCs ArALSTART CLASSROOMS T CONTRA COSTA COUNTY 0 I AM INTERESTED IN MORE INFORMATION ✓Y l�"7 RICHMOND COMUNITY SERVICES DEPT. PLEASE CALL OR FAX FURTHER ADDENDUMS, ECT. LOCATION,: 1001 S. 57" S'TRSET, RICHMOND CA. 0 I WILL NOT 3E BIDDING ON THIS PROJECT ARCHITECT / ENGINEER: CLAUDIA J. FALCONER, A.I.A. P.O. BOX 70232 0 I WILL NOT RE RIDDING ON THIS PROJECT PT. RICHMOND CA. 94607-0232 BUT SEND US FURTHER. INFORMATION ON FUTURE: PRO:7ECTS. PROJECT VALE RANGE (APPROX.) : $120,400" P1 4 'f`Z'NTA'TT"7E SCHEDVILE: PER SPECFICATION DOCUMENTS ESTSMATL PROJMCT nUR.ATZON: 100 CALENDER DAYS PER SPECFICA'TION DOCUMENTS THIS IS A 3 PHASE PROJECT DIVISION #1 - GEN7RAI, R,EQUIRE2✓.ENTS � 019000 FACILITY DECOMMISSIONING (ASBESTOS ABATEMENT) DIVISION t#2 -- SITE CONSTRUCTION 022205 DEMOLITION (HARD) DIVISION #3 - CONCRETE 0300017 CONCRETE (BUILDING) DIVISION ##4 - MASONRY DIVISION ##5 - METALS DIVISION #6 - 'WOODS 051.100 ROUGE: CARPENTRY 064000 CABINETS / ARCHITECTURAL WOODWORK 064150 COUNTERTOPS DIVISION ##7 - T'HE1 .A-L &i MOISTURE PR.OTELTION DIVISION #8 - DOORS & WIN'JOWS 082000 WOOD DOORS & FRAMES 087000 FINISH HARDWARE y;#�v�w�+c{` �,�L3Y" k088100 GLASS & GLAZING 088300 MIRROR :DIVISION #9 - FINISHES 092500 INTERIOR GYPSUM 0960007 FLOOR COVERING 099000 PAINTING & COATINGS w 4 DIVISION #10 - SPECIALTIES 101500 'TOILET PARTITIONS 108100 TOILET ACCESSORIES (COMMERCIAL) � c plVISTON #11 _ kQTJINT DIVISION #12 k"UPVISHINGS DIVISTON #13 - SPtCIAT, CONS T?:,'U=1ON DIVISION #14 - OO�iV'"VEYTNG SYSTEMS DIVISION #15 -• YMCHMTCAL 154000 PLUMBING DIVISION #16 - ELECTRICAL 160000 ELECTRICAL WAZK TIi OUGH SCF3FrDUZZD FOR: 7=SDAY, a SEPT. let 20001 8 9:00 aza BID PROPOSALS DUE BY; THURSDAY, SEPTEMBER,19", 2002 no later than 2:00 pm (PST) FOR PROPER EVALUATION ?LEASE SUBMEITT 4 HOURS IN ADVANCE NOTZS: - BIDS TO BE BASED ON COMPLETE SET OF SID DOCUMENTS {NOT SPECIFIC PAGES, SPECIFICATION SECTIONS, ETC., BID TO By BASED ON PREVAILING WAGES FOR FEDERALLY- ASSISTED CONSTRUCTION PROJECTS, CONSULT SPECIFICATION BOOK, AFFIRMATIVE ACTION REQUIREMENTS ARE IN EFFECT PER SPECIFICATION DOCUMENTS FOR M3E,WBE,OBE,SBE,LBE,& MSM (MANDATORY SUBCONTRACTING MINIMUN) WE RESERVE THE RIGHT TO REJECT any/ani ALL BIDS, OWNER TO OCCUPY PROJECT SITE DURING CONSTRUCTION, SOME TRADES ARE REQUIRED TO MAINTAIN ACCESS THROUGH WORK AREAS SUBCONTRACTOR'S WILL BE REQUIRED TO FURNISH PROOF OF A CURRENT CALIFORNIA STATE CONTRACTOR'S LICENSE, SUBCONTRACTOR'S WILL BE REQUIRED TO NAME: BUESTAO CONSTRUCTION, THE O',WNER, AND ARCH-7-ECT, ETC ADDITIONALLY INSURED (FORM CG2010 11/85), NOTE: 1F YOU NAI "..ILL CALIFORNIA OPERATIONS, YOU DO NOT HAVE TO SPECIFICALLY SA*A—V THE OWNER, - SUBCONTRACTOR'S WILL BE RECUIRED TO YAINTAIN $1,000,000.00 OF GENERAL LIABILITY INSUPANCE FOR THIS PROJECT. insurance and financial assistance is available in ad7arLce of bid, please contact our office for infor-ation. r« - SUBCONTRACTOR'S & SUPPLIERS AGREE THAT IN TURNING IN A PROPOSAL THEY AGREE TO ALL STANDARD {UN MCDIFiED} TERMS & CONDITIONS AS SET FORTH I THE BUwSTAD CONSTRUCTION SUBCONTRACTOR & PURCHASE ORDER AGREEMENTS, A COMPLETM SET OF PLANS, SPECIFICATIONS, AND ADDENDA (IF ANY) ARE AVAILABLE FOR INSPECTION AND USE IN OUR PLAN ROOM. PLEASE CALL BRIAN STEINER (510) 523-1925 t0 x 205 FOR AN APPOINT::ENT TO REVIEW THE CONTRACT DOCUMENTS.PLANS AVAILIBLE IN MOST BUILDERS EXCHANGES AND PURCHASE FROM THE GSA CONTRA COSTA COUNTY 925-3:3-7200 FOR $25 510 5231925 fax 523 2985 158 Stewart COUrt t r �"'r-e k, ;,kle 2lameda ca 94501-2100 8 3 8 0 3 7 6 1�' 4 1 '...mak..� r� -.-;"i ,.�'i b.;' Condition 8 Missed Deadline buestad construction 20 SEPTEMBER 2002 RAMESH KANZARIA ARCHITECTURAL DIVISION GSD CONTRA RA COS'"A COUNTY 1220 MORELLO AVE. _A_R-NEZ,CALIFORNIA 94553-4711 RE:HEADS-ART RESTROOM FACILITY ADDITIONS 1001 S.57 i H STREET, RICHMOND CA.CALIFOIRNIA CONTRA COSTA COUNTY COMMUNITY SERVICES DEAR RAMESH, KEY:rrALIC5 HIDE WT3E LISTED CONTRACTORS BOLD CONTRACTOR THAT WL'„L SE TJSED BELOW IS THEILIST ING OF ALL,7:1-:1 SUB BIDS WE RECErVE D FOR THE ABOVE PROJECT. BDJS RECE-VEE COST DESCK,!I 1ON SUB CATEGORIES CODE MATERIA, SUBCONTRACT DIVISION 41-F">-NERAL f2FOMITtE�IENTS OI9000 FACILITIY DECOMMISSIONING DMI DFMO MASTERS $3,225.00 � SYNERGY $7,250,00 ✓ R.&.CONSTRUCTION,INC. $10,300,00 TUN-SOLIC M- D✓ BLUFWATER ENVIRONMENTAL 511,800.00 DIV[-ION E N$TRTJ TI N 022203 DEMOLITION (TARO)[SAW CUT ONLY] DMI DEMO MASTERS $1,298.00 PENHALL COMPANY $1,733.00 NICSOLS CONCRETE CUITTTNG CAN NOT COMPARE UN-SOLICITED 022205 DEMOLITION (HARD)[BREAK&REMOVE] SCI IN-ROUSE LA13OR 53,480.00 DMI DEMO MASTERS 5:,560.00 023000 EXCAVATION SCI IN-HOUSE LABOR $2,595.00 CHAMPION PLUMBING $12,770.00 }� 17IY U9N# --waal3Cy 064000 CABINETS I ARCHTEC`CURAL WOODWORK 064150 COUNTERTOPS LIGIVUM VITAE $14,497.80 ✓ Y&D CABINET SHO? $13,850.00 UN-SOLICITED 4CM pa E] $16,800.00 ✓ CALIFORNIA CABINET&STORE.FIXTURE $28,795.00 UN-SOLICITED HEADSTA..RT RESTRDOMS PAGE 1 BIDS RECENED LISTLtiG :cc]o"D'T DESCRIIrnON SUB CATEGORIES MA:`ERLkl, SUBCON s RACT 082000 PLUSH WOOD DOORS 087000 FINISH HARDWARE ECONOMY LUMBER SI,342.30 j COMPLETE DOOR SYSTEMS 53,384.00 SAY AREA BUILDERS HARDWARE NO BID DIVISION#9 FINISHES 092500 INTERIOR GYPSUM BCT IN-HOUSE LABOR S2,940.00 DIABLO VALLEY DRYWALL 54,930.00✓ ACCURATE INTERIOR SYSTEMS&CONSTRUCTION,INC. $9,9333.00"r ELIZONDRO DRYWALL[MBEJ NO BID 096000 FLOOR.COVERING BAY FLOORING 53,389.00 LATE SOLICIT ANDERSON CARPET $5,647.00 ✓ FINNEY'S FLOORPNIG,INC. $6,125.00 CALL PIAN LIST Y CF!FLOORS,INC. NO BID 099000 PAINTING&COATINGS ,SATELLITE PAINTING:[MBEJ 53,375.00 LATE SOLICIT E.T(JRMAN&CO., NC. 54,663.00 ✓/ J.DARDEN PAINTING S5,800.v^0✓ W.Cf.THOM?SON PAINTING[MB El NO BID DIVISION 010-SPECLALTIES 108:00 TOILET ACCESSORIES LABOR BCI IN-HOUSE LABOR 5425.00 WHELAN BUILDING SPECIALTIES LABOR I MBEJ S1,169,00 ✓ 108100 TOILET ACCESSORIES(COMMERCIAL) WHELAN B UILDING SPECIALTIES JVBEJ 60%FOR MATERIAL ONLY $2,111.00 Y GLOBAL S14FFL PRODUCTS $2,333.00 ✓/ RDII $2,800.00 d UN=SOL iC, D JD SPECIALTIE-S $4,385.00 UN-SO_ICi D ACCURATE.INTERIOR SYSTEMS&CONSTRUCTION,INC. 54,564.00 UN-SOLICITED✓ SERVICE STEEL PRODUCTS NO BID I3IVISION#15--VT— HANICAL 154000 PLUMBING CHAMPION$PLUMBING&HEATING 537,026.00� f CHRISTOPHER 1.AUOUSTO PLUMBING COMPANY 539,080.00 UN-SOLICI"°£D V MADRID PLUMBING $39,660.00/ CR PLUMBING 542,764.00 CALL PLAN LIST ✓ OLS£N PLUMBING&HEATING 553,483,00 ✓', MSI'PLUMBING COMPANY 579,500.00 UN-SOLICITED BLACK SEA CORPORATION[MBEJ["EJ NO BID LL.IVI5ION 016-ELECTRICAL 160000 ELECTRICAL GOOLD ELECTRIC $3,325.00 NORTHERN STATES ELECTRIC [WREJ NOT BIDDING EXPRESS ELECTRIC[MBEJ NOT BIDDING HEADS TART MSTROOMS PAGE 2 BIDS RECEIVLD LISTING PLEASE CALL ME IF YOU HAVE ANY QUFS"ONS. SINCERELY, BRIAN MINER, NER, PROJECT MANAGER 610 5281525 fax 523 2085 768 stewart court a,amieda ca 94501.2100 8 3 8 0 3 7 6 HEADSTART USTROO,IS PAGE 3 BIDS RECEIVED LIS LING f m x Ic it E � p pf3 Vi it = i PC d IMC p t " d ` 009 = d i = f f 7 S9 3 'r CC�� � 2w � �A D D',�► A Y��� 6 a'ae ig� y$p� d .s.4') • D�0 V SY .} w# �°-� -4 S 11:0cj 0S2 r� ,� sus Y --t I IC■q at. ,« ,» to ! . , . ,»» % to . A \ A� n ! ! { J ` \ � | c � | 3 #i «- � n . .�. . . ! � . a . . Condition 9 Additional Information to show good faith effort I faxed all people that were still interested in project Addendum 1 I can provide copies of fax confirmation addressed to individual entitles if requested buestad construction ADDENDUM NOTICE inc To: Yan Tagon MOrganization: Mack Sea Corporation Pax: 415-762-2309 Imm From: Brian Steiner Date: September 16, 2002 Pages: 1 of 4 ADDENDUM x#001 PROJECT: Restroom Facility in Existing Headstart Classrooms Contra Costa County Community Services LOCATION: 1001 South 57{x' Street, Richmond, CA The following are changes to the Plans and Specifications for the above project. Please acknowledge receipt and inclusion of the items listed below in your bid proposal. BID PROPOSALS DUE BY: THURSDAY, SEPTEMBER 19, 2002 AT 2:00 PM (PST) A complete set of plans, specifications and addenda are available for inspection and use in our office plan room located at 768 Stewart Court, Alameda. For an appointment to inspect the bidding documents, please call BRIAN STEINER at 510-523-1925 x205. 519 523 1925 fax 523 2085 758 Stewart court alarneda ca 94551-2199 13 3 8 9 3 7 6 09J1E/02 12:14 FAX 510 523 2085 Ruestucl Construction Z001 TX REPORT TRANSMISSION OK T-1/RX NO 0047 CONNECTION TEL 14157522309 SUBADDRESS CONNECTION ID W7:2-- ST. TIME 09/15 12:13 USAGE T 01'34 PGS. SENT 4 /-� 5V lq- to ., RESULT OK buestad ADDENDUM NOTICE - �-�---�. construction Inc To: Yan Talton M organization: Mack Sea Corporation Fax: 415-752-2309 From: Brian Steiner Date: September 16, 2002 Pages: 1 of 4 ADDENDUM #001. PROJECT: Restroom Facility in Existing Headstart Classrooms Contra Costa County Community Services LOCATION: 1001 South 57�' Street, Richmond, CA The following are changes to the Plans and Specifications for the above project. Please acknowledge receipt and inclusion of the items listed below in your bid proposal. ** FOR INTERNAL USE ONLY-E'UESTADCONSTRUCTIONINC. WORKPROCIUCT "* SECTION NUMSER: An buestad construction SECTIC)N NAvdrE : + Head start classroom remodel Rich Southalth Richmond,California Inc. BID PROPOSAL DUE:Thursday,99th Sept 2002 Q 2:00 pm i CESCRIPTION LABOR ? MATERIAL SUB EQUIP. i OTHER SUBTOTAL i E i I i ! I I ; s r i ! I e E r e i i 3 I I I I I � I ! �E i i ! i 3 CONTACT Brian Stainer AT(590)528-1926 2205 IF YOU HAVE ANY QUESTIONS, ' VERIFY EXACT DIMENSIONS OF ALL MATERIALS BEFORE ORDERING,(APPROXIMATIONS ONLY), ' VERIFY EXACT QUANITiES w1PLANS&SPECIFICATIONS(APPROXIMATIONS ONLY), 510 5231925 fax 523 2085 SUPPLIER'S&SUBCONTRACTOR'S RESPONSIBLE TO VERIFY EXACT SCOPE OF WORK(THIS WAS 766 3tawart court PREPARED AS A'HELPFULL CHECK LIST ONLY), alatnada ca 94501.2100 3 3 6 0 3 7 6 FORBID PROPOSAL ESTIMATING ONLYIII, THIS IS NOT A PURCHASE ORDER and/or A SUBCONTRACT AGREEMENT AMI pemo mastefs Inc. _ 14+ 6 Wlitltle or, 11lon tessilro. C4 $4671 .UEMOLMON PROPOSAL To* BRM STMNER FAX:510 823-2088 DATE:09/16102 PH: $10 623-1925 COMPANY:SUES 'AD CONSTRUCT)N Joe NAME:RwRooM FAcajTy IN EX1sTlN a HEADsTART CLAsastooms RiciHMOND, CA. Ar DREss:748 ST w'ART CouRT Joe AooREsa:1001 S.47 ST r E AtAMtwa,CA,24801 PJOHMOND,CA. Scapa of Work:CksmolMon limited to(am below) #I)Saw only QtyS restrooms 16inch.X 18'X S'cdc slab trench.Based on 3 move-irs. €.OS$1, .00 #2) Maul only concrete from above trench. Based an 3 move-ins, L1S$1,S8t)DO #3)Rer noval of t 1 00W vattmastle rooms aandS 1 moven. $20005 00 Cs 04)Remove qty,10 windows glass and windrow putty based on 250V of putty.3-moves. L1S4$1,210 0 �. Special Previsions:All lay out,safa off and capp*of utiixti to be done prior to move cc by others.Tbree day notime prior to each.Hove-on.RegWar working hoses. tandard Exclusions: Permits, utility safe-off, capping, layout,engineering,shoring, pedestrian, protractive and dust barricades, safety railings,wall prep,flatr prep, patching or � grouting, removal of glue or mastics, bead/sand blasting or any work with hazardous or contaminated materials. Special Exclusions: Stand by or delays overtime, weekend or holiday work. Excavation. bade fill or compaction. standard Qunl#ications; 1, pn"based on one move-ills.Additional move-ins will be charged$550.00 ewh- 3. las the event of default in any of the tams of this cottrart,or in the event of xr.y action to anforce any of U-ic terms thereof t.16--7vaiiins party shall be enndted to reasonable at*omeys fees and suit 3. RETzli t'ION IS DUE AND PAYABLE W:£T'UD3 30 DAYS AMR COMPUTION, OF OUR WORK Intere%well be atarged.@?.5°i&per month on pW due.accounts. 4. If any dispute arises regarding the perform=under this cwtrwt,the pm ties he gree to arbitrate this dispute purest to the constraction industry miles of the Amer•icaca Arbi I jg�13mC} "We Tt"t People Right ,OPOSAL DATE. 28436 SATELLITE STREET �t5-177 HAYWARD, CA 94545 Ff3POSAL . Phone, 510-259-1700 TART DATE: 1-800-43949610 COMPLETION: SyV%RGY Fix. 6°tt��s9-1715 tris STATS LIC.0 stag ENVIRONMENTAL, INC. EPA 0CACssa04isa cA s7'A"a ASEIM08 AAATEMEYT CEFT.T.A A0481 09HA REG.#77 Job Name FR-_atistart r l assroom Customer L .stadistxuctior. Address R chr.=-ld CEnEuxii.ty Se�rices Address 758 Stewart Court City Riche , CA - -_Zip City Alameda, CAZjp 94501 i Cross St. Contact R3_i a_n St-_PAn-_r I 3 11 Phone No, H( y Phone Na. N ! 1 W{ } I° x { - w( 510 ) 523 .1925 —Fax { 51 523-2085 SCOPE OF WORK r S _ Fnvi rcntrental Inc. X11 )provide all necessary lab=, mat a-Is and equit orrrn the following: I ," a 1 00S.F., of Lligor tienastic. 2. v 10 d--7ar ad windows from classrotrms o i nes . 3. E=LI ul.at= work area. 4. Rroperl'Y dispose of taste. l s i i i i 3 TOTAL �J�0' *Work dote in accordance with rsquiator agencies_ j 66 TERMS AND CONDITIONS 1'y Scope o!work:SYNERGY will supply all labor, equipment,materials,services.and permits to complete work as referenced herein in strict accordance wilh all current applicable Federal, Slate and Local regulations, standards and codes governing asbestos abatement and any other work done in connec#cn with this Scope of Work.. 2) Payments. Custorriam wilt pay a 10% dow a nt of � _0_ to SYNERGY prior to scheduling work. Tile balance of the contract price of __ _-- .250.00 will be due the day the iob Is finished.PAYMENT MUST BE GIVEN TO FOREMAN AT JOB SITE UPON COMPLETION OF WORK. 1 1/29/6 per month will be due on any unpaid balance, 3) Competent Persons (Workers): The Scope of Work shall be partormed by persons trained, and or knowledgeable in the techniques of abatement, handling and disposal of asbestos-containing materials (ACM),and'cleaning of contaminated areas. 4) Site Conditions-. All moveable objects(including wail hangings)are to be removed from work area prior to SYNERGY arrival. Extra work to clear area y SYNERGY will be charged to customer. Additionally, customer will provide use of light, heat, water, power and secure storage space for asbestos ,naterlals sealed for disposal,on the property during performance of Scope of Work. trtcidentai Damage:The necessity,of safety precautions,such as stapling or taping plaetio barriers to,walis, etc.,can involve,some demage to wall and door coverings,suoh as paint,wallpaper,carpet, etc. Customer understands this and will be responsible for all such damage. 3).Site Access:: Customer to insure that prior to and.during any asbeetos abatement operations, the asbestos storaga arca and asbestos control area small be vacated and shall rernein dosed 0 all persons(other than SYNERGY employees)and animals for the duration of the project. In the event that any individual (other than SYNERGY employees) or animals enters the asbestoa storage area and/or asbestos control area, custornar agrees that SYNERGY shall not be hold liable for any health problems or claims relaling to any jNury, loss, or demage and/or asbestos exposure and/or actions that will increasa any claim for exp0s:1re and/or contamination arising therefrom except to tha extent.that such cieirna acme from the sole negligence or wil#ui misconduct of SYNERGY.The customer will indemnify and defend SYNERGY from all such claims. 71 xsme Paa i.B.nant [tato n:�lr understands that SYNERGY can only provide a limited estimate of time required to complete said job. Additional tame t lx li`Isw I;� Via FAX JO-C.�8.9-cc 78 4�c�, _ 510-683-8782 R.B, (A"ONSTRUCTION, INC. GN1' ERAL nUILUING' CONTRACTOR W AS:3EST0S CEIZTIItIFT7 HAZARDOUS - STIE1,9TANCE REMOVAL 89L REMEDIATION CERTIFIE'D CSIX 461,1028 - DOSTI #396 - C1ti.LTRANS D,B.F. SIMBL-' PROPOSAT, TO AD,BIDT)l;ICS: Soptcnibcr l9, 2002 A1.ltba i��•t�lect 1;^Yi��f;�tcsr Pw; Ashcsltos batcniont. T''r0jo0t Loc-,Ltion: 13o1boa Preschool, 101 S. 57th Slrcc;t, Richmond, CA. Providc; all Labor, Equiprnzit and Materials needed to remove and disposc of tlw 1011oMnt;a.,bc tos containing materials as idoutified in the plans and spcciTlcalions.Reviscd price roll cis chatt cs in gmantities in addonr uin 1 &2. Quantity- Pry 1, Xn,,s. 1Q,3,4,5,6,8. Reinovo VAT inn mastic from designated 1,000 si: x;2,000.00 Containtnont sct ups. 6 oa. $4,200,00 2, Ran 1. '92,:3,4,5,6,8. Remove windows w/asbestos patty. 800111 f.. $1,600.40 3, Providc. third party CAC to porform 6 ea. $2,500.00 mandatory AlIERZA. air cic ararces. �. "lt'O°t A1,1111:) PRI CP,': '�310,300.00R All w,-)+•k, ed" rmc d by R.B. Cuui,rttction, T,nx. is 1;i strict comptianc:e with all Fe-doral, Statc and Local co( �s alld rgXulations pcilsltt ing to hixardous materials removal and disposal, ',1'1-''ink yon, 1 INC. CORPORATE, OFFICE C,F,N`I`IxAL VALLEY 893 BCDtr{a;a 'I'VRTIACI+ 4460 S.DfG11WA.Y 99,FRONTAGE Ian. Ii IZ E',N I t l NT, C i. 94539-7095 S'I'COCKTON,CA 95215