HomeMy WebLinkAboutMINUTES - 10082002 - C.75 TO: BOARD OF SUPERVISORS FROM: MAURICE M. SHIU, PUBLIC WORKS DIRECTOR DATE: October 8, 2002 SUBJECT: CONTINUE the emergency action originally taken by the Board of Supervisors on June 4, 2002 regarding the repair Of the erosion along Carquinez Scenic Drive, as recommended by the Public Works Director, Crockett area. [CDD-CP# 02-02] (District Ii) Project No.: 0672-602526-02 SPECIFIC REQUEST(S)OR RECOMMENDATION(S)&BACKGROUND AND JUSTIFICATION I. Recommended Action: DETERMINE that there is a need to continue the emergency action taken by the Board of Supervisors on June 4, 2002, pursuant to Public Contract Code Sections 22035 and 22050, to repair the erosion along Carquinez Scenic Drive, Crockett area. �f Continued on Attachment: X SIGNATURE: ECOMMENDAT1ON OF COUNTY ADMINISTRATOR RECOMMENDATION OF BOARD COMMITTEE APPROVE _OTHER SIGNATURE(S) ,� - ACTION OF BO r}6NOctober 8, 2002 APPROVED AS RECOMMENDED x_OTHER VOTE OF SUPERVISORS X UNANIMOUS (ABSENT Nome ) AYES: NOES: I hereby certify that this is a true and correct copy of an ABSENT: ABSTAIN: action taken and entered on the minutes of the Board of Supervisors on the date shown. NL:mp G:\GrpData\Const\BO\2002\10-October\Carquinez Scenic Drive Slide Repair Emerg Cont 5.doc Orig.Div:Public works(Design) ATTESTED: October 8, 2002 Contact: B.Louis-313-2245 JOHN SWEETEN, Clerk of the Board of Supervisors c: M.Hollingsworth,Design and County Administrator Public Warks Accounting By] f ' Deputy SUBJECT: CONTINUE the emergency action originally taken by the Board of Supervisors on June 4, 2002 regarding the repair of the erosion along Carquinez Scenic Drive, as recommended by the Public Works Director, Crockett area. [CDD-CP # 02-02] (District 11) Project No.: 0672-6U2526-02 [TATE: October 6, 2002 PACE 2 11. Financiallmpact: The total estimated contract cost is$260,000,funded by Local Road Funds(100%). 111. Reasons for Recommendations and Background_: A. Can June 4, 2002, the Board of Supervisors declared an emergency and authorized the Public Works Director to proceed in the most expeditious manner to repair the erosion and failed pavement. B. Repair status: The project was awarded to Upgrade Construction of Danville; construction began August 26, 2002. This project is approximately 60% complete. IV. Consequences of Negative Action: Non-concurrence of the above recommendation will significantly delay repair of the roadway, prolonging impacts to local access and could result in the loss of the entire traveled way.