HomeMy WebLinkAboutMINUTES - 10012002 - C.4 TO: BOARD OF SUPERVISORS, as the Governing Body of the Contra Costa Countyfood Control and Water Conservation District FROM: MAURICE M. SHIU, CHIEF ENGINEER DATE: October 1, 2002 SUBJECT: EBMUDfWalnut Creek-San Ramon Valley Improvement Project — Common Use Agreement for South Broadway and Tunnel Portions, Walnut Creek area. CP#02-46 Project No.: 0678-6X5146 SPECIFIC REQUEST(S)OR RECOMMENDATION(S)&BACKGROUND AND JUSTIFICATION APPROVE and AUTHORIZE the Chief Engineer of the Contra Costa County Flood Control and Water Conservation District (Flood Control), to execute a Common Use Agreement between Flood Control and the East Bay Municipal Utility District (EBMUD), effective upon the issuance of an Encroachment Permit from Flood Control to EBMUD related to EBMUD's installation of a 69" water pipeline in the County's San Ramon Transportation Corridor, Walnut Creek area. if. Financial }rnna There will be no financial impact from this action. Continued can Attachment:_X_ SIGNATURE. S22 Aix --RECOMMENDATION OF COUNTY ADMINISTRATOR —RECOMMENDATION OF BOARD COMMITTEE APPROVE e--'� HER • r' SIGNATURE(S): ACTION OF BOAi``01ON OCTOBER 01, 200,&PPROVED AS RECOMMENDEDxx OTHER VOTE OF SUP > 6SORS xx UNANIMOUS(ABSENT ) AYES: NOES: ABSENT: ABSTAIN: I hereby certify that this is a true and correct ORA:eh copy of an action taken and entered on the C:NGrpOata\RealProp12002-Fiiesl02-9\92602EBMUD Common Brd.doc minutes of the Board of Supervisors on the Orig.Div: Public Works(R/P) date shown. Contact: Dick Awenius (313-2227) cc: County Administrator ATTESTED:_ OCTOBER 01, 2002 CDD,K. Piona JOHN SWEETEN, Clerk of the Board of P.W.Accounting Supervisors and County Administrator P.W.Environmental Svcs.,T.Torres Board orders Senior Clerk,Adm. By Deputy Flood Control, Dean Eckerson Steve Boeri, EBMUD Subject: EBMUD/Walnut Creek-San Ramon Valley Improvement Project ® Common Use Agreement for South Broadway and Tunnel Portions, Walnut Creek area Date: October 1, 2002 Page: 2 III. Rsnsqnnc for Rpmammandatinns andBackground: EBMUD desires to install a 69" diameter water pipeline in an approximately 2.2 mile stretch of the County-owned San Ramon Transportation Corridor (SRTC). The Pipeline will be installed in three phases identified as the Southern Reach section running from Danville Boulevard to Stone Valley Road in the Alamo area, and the South Broadway and the Civic Park to Newell Avenue sections in the City of Walnut Creek. In some locations, the pipeline will be located underneath the concrete box culvert installed by the Flood Control District resulting in the need for a common use agreement between EBMUD and Flood Control. The Board authorized the execution of the easements for the Southern Reach section on July 16, 2002. This action represents only the authorization for the execution of the Common Use Agreement. The Board's authorization to execute a Temporary Right of Entry agreement, easement agreements for the South Broadway and Civic Park to Newell Avenue sections of EBMUD's project, and a Purchase and Sale Agreement between County and EBMUD, will be the subject of future Board Orders. Flood Control is concerned that construction activities performed by EBMUD may cause damage to Flood Control's facilities in the future in a way that is not foreseeable at this time. Flood Control and EBMUD both desire to have a clear understanding of each party's responsibility in having facilities sharing the same right of way. Although EBMUD and Flood Control recognize that it is difficult to plan in advance for unforeseeable problems, the attached Common Use Agreement includes provisions for EBMUD to repair, at EBMUD's expense, damage to Flood Control's facilities caused by EBMUD's activities. General Plan Conformance for the entire project has been received from the City of Walnut Creek. On July 16, 2002, the Board determined that EBMUD's project was not subject to the California Environmental Quality Act (CEQA) pursuant to Article 5, Section 15061 (b)(3) of the CEQA Guidelines. IV, nne , _n _ _c of N ;gam ive Ar-ficin: The Common Use Agreement will not be executed, and Flood Control will not issue an Encroachment Permit for EBMUD's project. Common Use Agreement RECORDING REQUESTED BY East Bay Municipal Utility District AND WHEN RECORDED MAIL TO East Bay Municipal Utility District P.O. Box 2.4055 Oakland, CA 94623 Attn: Real Estate Services Stephen J. Boeri SPACE ABOVE THIS LINE FOR RECORDER'S USE COMMON USE AGREEMENT Effective , the CONTRA COSTA COUNTY FLOOD CONTROL AND WATER CONSERVATION DISTRICT, a subdivision of the State of California (hereafter "Flood Control'), and the EAST BAY MUNICIPAL UTILITY DISTRICT, a public corporation organized and existing under the laws of the State of California (hereafter "EBMUD"), enter into this common use agreement ("Agreement") on the terms and conditions contained herein: RECITALS A. County is the owner of that certain strip of land of varying width that runs from north Concord through the City of Walnut Creek to the City of San Ramon in Contra Costa County. This strip of land is commonly known as the San Ramon Transportation Corridor("SRTC"). B. Flood Control has condemned an easement over a portion of that strip of land wherein Flood Control has placed a concrete box culvert flood control channel (the "Channel"). C. EBMUD desires to acquire one (1) permanent subsurface easement (the "Tunnel Easement"), in the form attached hereto as Exhibit "A" and incorporated herein, below portions of the SRTC and Channel to bore an approximately ten foot (10') diameter tunnel ("Water Pipeline Tunnel") within a thirty foot by thirty foot (30' X 30') square easement for the purpose of installing, maintaining, and operating a sixty-nine inch (69") wide water pipeline (the "Water Pipeline"), and all necessary appurtenances. D. EBMUD also desires to acquire one (1) permanent surface easement and one (1) permanent subsurface easement (the "South Broadway Easements"), in the form attached hereto as Exhibit "B" and incorporated herein, over, across and below portions of the SRTC to access, install, maintain, and operate the Water Pipeline and all necessary appurtenances. The KI-DRA:eh G:\GrpData\Rea?Prop\EBMUD Pipeline\92602EBMUD CommonUse SoBroadTunnel.doc Page I of 6 9/26/2002 8:10 AM Common Use Agreement Tunnel Easement and the South Broadway Easements are collectively referred to as the "Permanent Easements." E. EBMUD also desires to acquire one (1) temporary construction easement ("TCE") also included in the form attached hereto as Exhibit "B," over a portion of the SRTC for the storage of material and the operation and storage of equipment during the initial construction of the Water Pipeline. F. On December 22, 1986, a Final Order of Condemnation ("Final Carder") in Superior Court Case No. 262946 was recorded at Book 13339, Page 328 in the Official Records of Contra Costa County, pursuant to which a perpetual, non-exclusive easement was condemned to Flood Control across a portion of the SRTC. Flood Control has constructed a permanent concrete flood control channel (the "Channel") within the real property condemned to Flood Control. The Judgment in Condemnation ("Judgment") entered in Superior Court Case No. 262946 provides that in the event County grants any subsequent easements or licenses within the real property condemned to Flood Control, as described in Exhibit "A" to the Judgment, County shall require each subsequent grantee to enter into a common use agreement with Flood Control, which agreement shall contain, at a minimum, the terms and conditions set forth in Section 13. of the Judgment. Since portions of the Permanent Easements will overlay or overlap the area condemned to Flood Control, County requires that EBMUD enter into this Agreement. AGREEMENT 1. PURPOSE: Flood Control and EBMUD hereby acknowledge and agree that portions of the Permanent Easements and the TCE described herein will overlap or overlay the real property described in Exhibit "A" to the Judgment described above, necessitating the execution of this Common Use Agreement between Flood Control and EBMUD. Flood Control specifically acknowledges and agrees that the execution of this Agreement by EBMUD satisfies all of County's obligations under the Judgment with respect to the Permanent Easements and the TCE being conveyed to EBMUD. 2. EBMUD's PRIOR NOTICE TO FLOOD CONTROL: EBMUD acknowledges the presence of Flood Control's Channel and agrees not to, at any time, use, or permit others to use, the Permanent Easement areas in any manner that will interfere with, damage, or impair the Channel. EBMUD shall, prior to any construction, reconstruction, remodeling, excavation, installation, or plantings within the Property boundaries, submit specific plans and specifications ("Plans and Specifications") to Flood Control for Flood Control's review and written approval; provided, however, normal maintenance and repair by EBMUD of its facilities within the Permanent Easement areas that does not include excavation or any activity that may potentially result in disturbance of the Channel, but consisting of routine inspection and servicing of the Water Pipeline and/or the Water Pipeline Tunnel in a manner that will not create a public disturbance, shall not require prior notice to Flood Control. Such written approval, together with KI_:DRA:eh G:\Grp Data\RealPi-op\EBMUD Pipeline\92602EBMUD Common Use SoBroadTunnel.doc Page 2 of 6 9/26/2002 8:10 AM Common Use .Agreement any additional requirements, shall be in the form of an Encroachment Permit issued by Flood Control. 3. CONSTRUCTION OF WATER PIPELINE: EBMUD hereby accepts all liability, and shall be solely responsible, at its sole cost and expense, to design, engineer, construct, reconstruct, modify, and maintain its Water Pipeline and the Water Pipeline Tunnel in a manner that will withstand the significant weight, vibration, or other conditions that are conducive to Flood Control's Channel. EBMUD hereby acknowledges and accepts Flood Control's right to maintain, operate, repair, reconstruct, and remodel the Channel, including any excavation, in a manner not intended to damage the Water Pipeline and/or the Water Pipeline Tunnel. 4. FLOOD CONTROL'S OPERATION OF CHANNEL: Flood Control shall have the right to repair, replace, reconstruct, relocate, or perform any other work that Flood Control deems, in its sole discretion, to be necessary for the operation of the Channel. In the event that Flood Control determines to undertake a project that will require construction, excavation, drilling, and/or the driving of any type of piling(s) into the earth below an elevation of three feet (3') under the filter blanket or foundation of the Flood Control Channel, or any activity that will require blasting and/or exploding (together known as "Penetrating Improvements"), or that, in Flood Control's sole discretion, may otherwise affect the Water Pipeline, Flood Control shall, not less than one hundred-eighty(180) days prior to awarding a contract for construction, submit detailed construction plans and specifications to EBMUD for all proposed improvements for EBMUD to review and determine whether such improvements will endanger, damage, and/or interfere with EBMUD's tunnel located within the Permanent Easement area. Within sixty (60) days after its receipt of said plans and specifications, EBMUD shall then determine what measures are reasonably necessary to protect EBMUD's Water Pipeline and Water Pipeline Tunnel from the construction of the improvements, and shall notify Flood Control in writing of said measures. EBMUD shall be responsible for designing, constructing, installing, and maintaining, at its sole cost and expense, those protective measures made necessary by the penetrating Improvements, or other construction activities, and EBMUD shall be solely responsible to provide and install said measures at its sole cost and expense in a manner that will not inhibit, delay, reduce, or negatively affect Flood Control's construction. The protective measures for which EBMUD is responsible shall be submitted to Flood Control for an Encroachment Permit as required herein. Flood Control reserves the right to require EBMUD to reasonably modify its facilities to accommodate Flood Control's construction. Said modifications shall not include relocating the Water Pipeline and the Water Pipeline Tunnel, but may include alteration of sub-surface features of the Water Pipeline and the Water Pipeline Tunnel. In the event that, after the installation of EBMUD's Water Pipeline and the Water Pipeline Tunnel, EBMUD determines, in its sole discretion, that the Water Pipeline and the Water Pipeline Tunnel must be relocated or modified to withstand the effects of the Channel, then EBMUD shall be solely responsible to perform said relocation or modifications, at EBMUD's sole cost, expense, and liability. KUDRA:eh G:IGrpData\Rea1ProptEBM,UD Pipelinel92602EBMUD COmmonUse SOBroadTunnel.doc Page 3 of 6 9./26%2002 8:10 AM Common Use Agreement 5. DAMAGE TO FLOOD CONTROL'S FACILITIES: Any damage to Flood Control's facilities caused by EBMUD, its employees, contractors, or agents during construction of the Water Pipeline and/or the Water Pipeline Tunnel, or at any time thereafter, shall be repaired by EBMUD under the direction, and to the specifications, of Flood Control, and all costs, including, but not limited to design, construction, review, inspection, and administration for said repairs shall be paid in full by EBMUD. In the event that EBMUD fails to repair or replace, as determined solely by Flood Control, any portion of the Channel as required by Flood Control, or by this agreement, Flood Control can perform the work, and EBMUD shall reimburse Flood Control for all expenses that Flood Control incurs in completing said work, including, but not limited to all costs of engineering and administration. In the event that any survey monitoring points, including, but not limited to, extensometers placed under the Channel, shows settlement in excess of three hundred seventy-five one thousandths of an inch (.375") for the conventional boring (TBM) portion and twenty-six one hundredths of an inch (0.26") for the microtunnel section, the Channel will be considered to have been damaged, and shall be replaced or repaired by EBMUD, at its sole cost and expense, to the satisfaction of Flood Control and the United States Army Corps of Engineers. b. POST-CONSTRUCTION REPORT: Within forty-five (45) days following completion of construction of EBMUD's facilities in the Tunnel Easement and South Broadway area, EBMUD shall prepare a post-construction report describing the tunneling methods and remedial measures, if any, that were used in the construction and installation of the EBMUD facilities, and the locations in which the described tunneling methods and remedial measures were used. The report shall also contain all inspection logs and all settlement data gathered during the construction of EBMUD's facilities, noting whether any settlement in excess of the limits set forth in Section 5. Damage to Flood Control's Property has occurred. 7. EMERGENCY SITUATIONS: In the event that EBMUD identifies an emergency situation involving EBMUD's Water Pipeline and/or its Water Pipeline Tunnel, EBMUD agrees to immediately notify Flood Control so that Flood Control can take appropriate emergency actions, as necessary. An "emergency" shall be defined as a situation, which causes discontinuation of, or immediate threat to, the operation of the EBMUD's Water Pipeline and/or the Water Pipeline Tunnel, or of the operation of Flood Control's Channel, or harm, danger, or inconvenience to the general public. 8. INDEMNIFICATION: EBMUD shall defend, indemnify, save and hold harmless Flood Control and its officers, agents, employees, and contractors from any and all claims, costs and liabilities for any damages, injury or death arising from or connected with the performance hereof, due to or claimed or alleged to be due to negligent or wrongful acts, errors, or omissions of EBMUD or any other person under the EBMUD's control, including but not limited to liability arising from injury or death to members of the public using the property described in the Permanent Easements or the TCE, save and except claims or litigation arising through the sole negligence or willful misconduct of Flood Control, and EBMUD shall make good to and reimburse Flood Control for any expenditures, including reasonable attorney's fees, Flood KL:DRA:ei, G:\G-pData\Rea1Prop\EBMUD Pipe1ine\92602EBMUD CornmonUse SOBroadTunnel.doc Page 4 of 6 9/26/2002 8:10 AM Common Use Agreement Control may make by reason of such matters. EBMUD further agrees that EBMUD shall save and hold Flood Control harmless from any and all damages arising out of inverse condemnation concerning such matters, except that Flood Control shall be responsible for a share of liability corresponding solely to the actual percentage of the cause in fact of Flood Control's facilities as deliberately designed and constructed. EBMUD further agrees to assume all joint and several liability for tort actions to the extent such liability exceeds the actual percentage of fault attributable to the actions of Flood Control and its officers and employees. 9. NO ASSIGNMENT: EBMUD shall not transfer, apportion, or assign this Agreement without Flood Control's prior written consent, which may be withheld in Flood Control's sole discretion. 10. ENTIRE AGREEMENT: This Agreement, including the Recitals and the terms and conditions of the exhibits attached hereto, contains the entire agreement between the parties hereto and shall not be modified in any manner except by an instrument in writing executed by the parties hereto or their permitted successors or assigns. 11. CONSTRUCTION: This Agreement shall not be construed as if it had been prepared by one of the parties, but rather as if both parties have prepared it. The parties to this Agreement and their counsel have read and reviewed this Agreement and agree that any rule of construction to the effect that ambiguities are to be resolved against the drafting party shall not apply to the interpretation of this Agreement. 12. SUCCESSORS AND ASSIGNS: Subject to Section 9. No Assignment above, this Agreement and all of the covenants contained herein shall inure to the benefit of and be binding upon the heirs, successors, and assigns of the respective parties hereto. 13. WAIVER: A waiver of any breach of any covenant or provision in this Agreement shall not be deemed a waiver of any other covenant or provision in this Agreement, and no waiver shall be valid unless in writing and executed by the waiving party. 14. SEVERABILITY: If any term or provision of this Agreement shall, to any extent, be held invalid or unenforceable, the remainder of this Agreement shall not be affected. Kl-:DRA:eh G:At,rr.Data\ReaiPi-op\EBIMUD Pipeline\92602BBMUD CommonUse SoBroadTunnei.doe Page 5 of 6 9/2612002 8:10 AM Common Use Agreement 15. GOVERNING LAW AND VENUE: This Agreement shall be governed by and construed in accordance with California law. The venue of any litigation pertaining to this Agreement shall be Contra Costa County, California. IN WITNESS WHEREOF, this Common Use Agreement is signed and executed this day of ) 2002. FLOOD CONTROL: EBMUD: CONTRA COSTA COUNTY FLOOD EAST BAY MUNICIPAL UTILITY DISTRICT CONTROL AND WATER CONSERVATION DISTRICT By Maurice M. Shiu, By: Chief Engineer Stephen J. Boeri, Manager, Real Estate Services APPROVED AS TO FORM: By: Lynelle M. Lewis, Secretary of the District By Silvano B. Marchesi, APPROVED AS TO FORM: County Counsel By District Counsel KL:DRA:eh G:\GrpData\Rea1Prop\EBMUD Pipe1ine\92602ESMUD CommonUse SoBroadTunnel.doe Page b of b 9/26/2002 8:10 AM