Loading...
HomeMy WebLinkAboutMINUTES - 02122002 - C17 4 3�� �. 17 TO: BOARD OF SUPERVISORS,AS THE GOVERNING BOARD OF CONTRA COSTA COUNTY FLOOD CONTROL AND WATER CONSERVATION DISTRICT FROM: MAURICE SHIU, CHIEF ENGINEER DATE: February 12, 2002 SUBJECT: Consulting Services Agreement with Subsurface Consultant,Inc. for geotechnical services for the Upper and Lower Sand Creek Basins project, Antioch area. (Drainage Area 104) SPECIFIC REQUEST(S)OR RECOMMENDATION(S)&BACKGROUND AND JUSTIFICATION I. Recommended Action: APPROVE and AUTHORIZE the Chief Engineer to execute a contract with Subsurface Consultants,Inc.,in the amount of$208,550 to provide geotechnical services to the Flood Control and Water Conservation District for the Upper and Lower Sand Creek Basins project, for the period February 12, 2002 through January 31, 2003, Antioch area. (Drainage Area 104) II. Financial lmnact: There will be no impact to the County General Fund. This consulting services contract will be paid for by Drainage Area 104 funds. Continued on Attachment: X SIGNATURE: , !MCMRMENDA'F1ON OF COUNTY ADMINISTUM —RECOMMENDATION OF BOARD COMMITTEE �-APPROVE TITER r SIGNATURE (S): ACTION OF BOA"PN APPROVED AS RECOMMENDED OTHER I hereby certify that this is a true and correct VOTE OF SUPERVISORS Copy of an action taken and entered on the minutes of the UNANIMOUS(ABSENT — 1 Board of Supervisors on the date shown. AYES: NOES: ABSENT:. ABSTAIN: ATTESTED:_ February 12, 2002 G:lC,rpData\FldCtilAdnvarstmtion\Board Ord=\BO 2-12-02 CSAAoc JOHN SWEETEN, Clerk of the.Board Orig.Div: Public Works Flood Control CCss t'+ Contact: D.Eckerson(313.2271) of r.3LlpeMsors and County Administrator Auditor-Controllers Office E.Kuavor,CAO M.Avalon,Admin. R.Gilchrist,Accounting By , Deputy Subsurface Consultants SUBJECT: Consulting Services Agreement with Subsurface Consultants,Inc. for geotechnical services for the Upper and Lower Sand Creek Basins project, Antioch area. DATE. February 12, 2402 PAGE 2 III. Reasons for Recommendations and Background: The Upper and Lower Sand Creek Basins are regional detention basin facilities planned to remediate storm waters generated by the future urban development in the Cities of Antioch and.Brentwood,within the Sand Creek watershed. Both basins are large facilities capable of holding large quantities of storm waters. As part of the development of these basins,large quantities of soils must be removed from the sites to construct the basins. The soils must be tested for contaminants,and classified by type before they will be accepted by potential disposal sites. Additional testing is also required for design and construction parameters,and to meet the submittal requirements for the State Division of Dam Safety. All of this testing must be done by a certified geotechnical engineer. IV. Consequences of Negative Action: If this Board Order is not approved, the consulting services agreement will not be executed and future construction of the basins will be delayed.