TO: BOARD OF SUPERVISORS
FROM: MAURICE M. SHIU, PUBLIC WORKS DIRECTOR
DATE: October 23, 2001
SUBJECT: Determine there is a need to continue the Emergency Action regarding the
repair of Briones Valley Rd Bridge, Brentwood area, Supervisor District 5
Project No.: 0662-6U4094-01, [CP# 01-42]
SPECIFIC REQUEST(S)OR RECOMMENDATION(S)&BACKGROUND AND JUSTIFICATICN
I. Recommended Action:
DETERMINE that there is a need to continue the emergency action taken by the
Board of Supervisors on July 24, 2001, pursuant to Public Contract Code Sections
22035 and 22050, to repair the Briones Valley Road Bridge, Brentwood area.
Continued on Attachment: X SIGNATURE: Z4,0� 00� O�
RECOMMENDATION OF COUNTY ADMINISTRATOR
RECOMMENDATION OF BOARD COMMITTEE
—APPROVE OTHER
SIGNATURE(S):
ACTION OF BOARD ON APPROVED AS RECOMMENDED OT#ER
VOTE OF SUPERVISORS
—p` UNANIMOUS (ABSENT
AYES: NOES: I hereby certify that this is a true and correct copy of an
ABSENT: ABSTAIN: action taken and entered on the minutes ofthe Board
of Supervisors on the date shown.
BF:mp
G:\GrpData\Design\Board Orders\BO 2001\
Briones Valley Road Cont.3..doc r1 ^�
Orig.Div: Public Works(Design) ATTESTED: OG�L!(7Br a3 )00
Contact: B. Fernandez-313-2294 JOHN SWEETEN, Clerk of the Board of Supervisors
c: M.Hollingsworth,Design and County Administrator
Public Works Accounting
By Deputy
SUBJECT: Determine there is a need to continue the Emergency Action regarding the
repair of Briones Valley Rd Bridge, Brentwood area, Supervisor District 5
Project No.: 0662-6U4094-01, [CP# 01-42]
DATE: October 23, 2001
PAGE 2
II. Financial Impact:
Estimated cost is $50,000 (100% Road Funds).
III. Reasons for Recommendations and Background:
A. On July 24, 2001, the Board of Supervisors declared an emergency and
authorized the Public Works Director to proceed in the most expeditious manner
to repair the Bridge.
B. Repair status:
The proposed solution uses sections of a prefabricated Bailey style bridge to
span the creek.
Steel decking has been delivered.
Maintenance crews have assembled the bridge components at the County
yard on Waterbird Way.
Hess Construction Company has been hired to construct the foundation and
install the bridge.
Foundation work is underway.
IV. Consequences of Negative Action:
A negative action would slow the process of the replacement structure and would
cause the project to be delayed to 2002.