HomeMy WebLinkAboutMINUTES - 02272001 - C.162 A/D File No.: 135-0104/B.4.1
To: BOARD OF SUPERVISORS
,,e-_°°-�-�=�'�.
FROM: BARTON J. GILBERT, DIRECTOR OF GENERAL SERVICES Contra;
Costaol. ,1
DATE: February 27, 2001 ^ County
s UX�
SUBJECT: REPLACEMENT OF HVAC SYSTEM AT RICHMOND HEALTH
CENTER, 100-38TH STREET, RICHMOND (WH254F)
SPECIFIC REQUESTS OR RECOMMENDATION(S)&BACKGROUND AND JUSTIFICATION
I. RECOMMENDATION
DETERMINE that there is a need to continue the Board action taken by the Board on October 3, 2000
pursuant to Public Contract Code Sections 20134 and 22050 to replace the HVAC system at the
Richmond Health Center, 100 - 38th Street, Richmond for Health Services.
II. FINANCIAL IMPACT
Funding will be identified once the scope of work is determined.
II1. BACKGROUND
A. On Tuesday, September 19, 2000 the Kathabar dehumidification system at the Richmond Health
Center failed, causing Kathene solution and condensation to drip from the ceilings and the
HVAC system to be shut down. This resulted in the facility having to close until temporary
repairs could be made.
B. The existing system was originally installed in 1966 and is an unconventional.system which is
difficult to maintain and repair, and does not provide adequate ventilation in a significant portion
of the building. A complete new modern energy efficient HVAC system needs to be installed
since the system can now only operate at 50% capacity and may fail again.
C. It will be necessary to relocate all, or at least a portion of, the operations of the facility to
temporary space in order to accomplish the work in an efficient manner and to avoid disruption
during construction.
CONTINUED ON ATTACHMENT: X YES &6�&JGNATURE:
✓RECOMMENDATION OF COUNTY ADMINISTRATOR RECOMMENDATION OF BOARD COMMITTEE
--'APPROVE OTHER
l
SIGNATURE(S):
ACTION OF BOA O February 27, 2001 APPROVED AS RECOMMENDED XX OTHER
VOTE OF SUPERVISORS
UNANIMOUS(ABSENT — — — — — — 1
AYES: NOES:
ABSENTS: ABSTAIN:
MEDIA CONTACT: BARTON J.GILBERT(313-7100)
CC: General Services Department I HEREBY CERTIFY THAT THIS IS A TRUE
Architectural Division AND CORRECT COPY OF AN ACTION TAKEN
AND ENTERED ON THE MINUTES OF THE BOARD
Accounting OF SUPERVISORS ON THE DATE SHOWN.
File: 135-0104/A.5
County Administrator's Office ATTESTED February 27, 2001
County Counsel PHIL BATCHELOR,CLERK OF THE BOARD OF
Auditor-Controller SUPERVISOR AN COUNTY ADMIN TRATOR
BY DEPUTY
H:\2001\1350104\01100424b.doc Page 1 of 2 M382(10/88)
:'•REPLACEMENT OF HVAC SYSTEM AT RICHMOND HEALTH A/D File No.:135-0104/B.4.1
CENTER, 100-38TH STREET, RICHMOND (WH254F) February 27, 2001
D. The replacement of the HVAC system is vital to Health Services' ability to deliver health care
and treatment services to their patients, and is therefore necessary for the life, health, welfare,
and safety of the citizens who rely on Health Services for critical health care services and
medical treatment.
E. To reduce the remodeling construction schedule so that the work can be completed before spring,
the County Administrator and Health Services recommend a findingthat an emergency exists
that will not permit the delay resulting from a competitive solicitation for bids, and that Board
action is necessary to respond to the emergency.
F. Consequently, on October 3, 2000 (Agenda Item D.3), the Board 1) found that an emergency .
exists, 2) delegated authority to the General Services Director to proceed in the most expeditious
manner with the replacement of the defective HVAC system at the Richmond Health Center, 100
— 38`h St., Richmond for Health Services, 3) directed the General Services Director to make
reports to enable the Board to review the emergency actions and to determine that there is a need
.to continue the action, and 4) declared that the project, as an emergency, is exempt from the
provisions of the California Environmental Quality Act.
G. The condition that the Board found to be an emergency on October 3, 2000 continues to exist.
Therefore, it is necessary to continue the emergency action previously taken by the Board so that
the work can be completed in the shortest time possible.
H. Contract for equipment and equipment installation has been executed with Martinez Sheet Metal,
Inc.
1. Engineering has been completed except for support platform. Equipment submittals have been
reviewed and approved.
J. Dehumidification equipment has been delivered to Contractor's facility .
K. Site preparation work has started.
L. Construction documents have been submitted to County Building Inspection for permit.
LDR:an1c
H:\2001\1350104\01100424b.doc Page 2 of 2 M382(10/88)