HomeMy WebLinkAboutMINUTES - 12042001 - C.2 TO: BOARD OF SUPERVISORS FROM: Maurice M. Shiu, Public Works Director DATE: December 4, 2001 SUBJECT: Approve Project Contingency Fund Increase and Contract Change Order No. 2 for.the Bayview Curb Ramps-Phase 2 project, Project No. 0662-6U4057-01, San Pablo area. Specific Request(s)or Recommendation(s)&Background&Justification I. Recommended Action: APPROVE and AUTHORIZE the Public Works Director to issue Change Order No. 2 with John M. Tyson in the approximate of$10,000 and to increase the Project Contingency Fund by$13,000 to $18,520, due to a change in the scope of work for the Bayview Curb Ramps-Phase 2 project. II. Financiallmpact: The project contingency funds are currently insufficient to cover the increased cost. The increase in contingency funds will be funded by Local Road Funds (1 00%). Continued on attachment: X yes SIGNATURE. RECOMMENDATION OF COUNTY ADMINISTRATOR RECOMMENDATION OF BOARD COMMITTEE APPROVE OTHER SIGNATURE (S): ACTION OF BOAR N:December 04, 2001 APPROVED AS RECOMMENDED xx OTHER_ VOTE OF SUPERVISORS I hereby certify that this is a true and correct copy of an xx UNANIMOUS (ABSENT ) action taken and entered on the minutes of the Board of AYES: NOES: Supervisors on the date shown. ABSENT: ABSTAIN: Contact: Mike Carlson,(925)313-2320 ATTESTED: December 04, 2001 JOHN SWEETEN, Clerk of the Board of Supervisors and Orig.Div.: PW(Constr) County Administrator cc: County Administrator Auditor-Controller Public Works Q //JJ�� Accounting,R.Gilchrist By ZyAnt�y Deputy Construction,R.Bruno —� Design Contractor RB:jc G:\GRPDATA\CON ST\BO\2001\12-DEC\4-BVCR2-PCC&CCO2.DOC SUBJECT: Approval of Contract Contingency Fund Increase and Contract Change Order No. 2 for the Bayview Curb Ramps-Phase 2 project, Project No. 0662-61-14057-01, San Pablo area DATE: December 4, 2001 PAGE 2 of 2 III. Reasons for Recommendations and Background: Additional funding is needed to pay the contractor for increases in contract work. The additional work was due to the discovery of an existing pipe not addressed in the original design, a field adaptation of existing and proposed improvements was necessary. This change exceeded the project contingency fund. Approval of the Project Contingency Fund increase is required to compensate the contractor for the extra work. IV. Consequences of Negative Action: The lack of approval would prevent successful completion of this contract and preclude payment to the contractor for required work.