SUBJECT: DETERMINE that the Emergency Action regarding the repair of Briones Valley Rd
Bridge may be terminated, Brentwood area. [CP# 01=42] (District V)
Project No.: 0662-6U4094-01
SPECIFIC REQUEST(S)OR RECOMMENDATION(S)&BACKGROUND AND JUSTIFICATICN
I. Recommended Action:
DETERMINE that the emergency action taken by the Board of Supervisors on July 24,
2001, pursuant to Public Contract Code Sections 22035 and 22050, to repair the Briones
Valley Road Bridge may be terminated, Brentwood area.
Continued on Attachment: X SIGNATURE: / IG
_RECOMMENDATION OF COUNTY ADMINISTRATOR
_RECOMMENDATION OF BOARD COMMITTEE
APPROVE OTHER
SIGNATURE(S):
ACTION OF BOARD ON �G��j�y��� P70VED AS RECOMMENDED OTHER
VOTE OF SUPERVISORS
UNANIMOUS (ABSENT )
AYES: NOES: I hereby certify that this is a true and correct copyof an
ABSENT: ABSTAIN: action taken and entered on the minutes ofthe Board
of Supervisors on the date shown.
BF:mp
G:\GrpData\Design\Board Orders\BO 2001
\Briones Valley Road Cont.6.doc
Orig. (Design) ATTESTED:
Ori Div: Public Works Desi n
Contact: B. Fernandez-313-2294 JOHN SWEETEN, Clerk of the Board of Supervisors
c: M. Hollingsworth, Design and County Administrator
Public Works Accounting
By Deputy
SUBJECT: DETERMINE that the Emergency Action regarding the repair of Briones Valley
Rd Bridge may be terminated, Brentwood area. [CP# 01-42) (District V)
Project No.: 0662-6U4004-01
DATE: December 18, 2001
PAGE 2
II. Financiallmpact:
Estimated cost is $50,000 (100% Road Funds). Final costs pending submittal of
billing from Hess Construction.
III. Reasons for Recommendations and Background:
A. On July 24, 2001, the Board of Supervisors declared an emergency and
authorized the Public Works Director to proceed in the most expeditious manner
to repair the Bridge.
B. Repair status:
Hess Construction has completed the installation of a prefabricated Bailey
style bridge including foundations, deck grating and approach roadways. With
this work completed, the public may now safely traverse the creek, therefore
the Emergency Action may be terminated.
IV. Consequences of Negative Action:
A negative action would have no impact on the replacement of the structure.