HomeMy WebLinkAboutMINUTES - 12182001 - C.124 S P.', TO: BOARD OF SUPERVISORS 2. CONTRA COSTA COUNTY FROM: John Sweeten, County Administrator � C'UVK'� DATE: December 18, 2001 SUBJECT: Review of Energy Policy SPECIFIC REQUEST(S) OR RECOMMENDATION(S) & BACKGROUND AND JUSTIFICATION RECOMMENDATION(S): 1. ACCEPT the report on the overview of County policies designed to increase the energy efficiency of County operations; to increase the use of cost effective alternative power sources; and to minimize the County's cost for electricity and natural gas. 2. EXPRESS appreciation to County employees and departments for their successful efforts to reduce the County's energy use. 3. AMEND the County's Energy Reduction Plan to increase winter thermostat settings to 67° in recognition of temperature variances in many buildings. 4. ACKNOWLEDGE that some County facilities may be required by state or federal law or regulation to adjust their thermostat settings above the 67° standard for County facilities and to AMEND the policy as needed for compliance with federal and state law and regulation. 5. ACCEPT the guidelines on use of generators for County faci 'ties. CONTINUED ON ATTACHMENT: AYES SIGNATURE: �� j RECOMMENDATION OF COUNTY ADMINISTRATOR_RECOMMENDATION OF A OMMITTEE —APPROVE _OTHER SIGNATURE(S): ACTION OF BOARD ON December IS- 2001 APPROVED AS RECOMMENDEDyX OTHER VOTE OF SUPERVISORS I HEREBY CERTIFY THAT THIS IS A X_UNANIMOUS(ABSENT None I TRUE AND CORRECT COPY OF AN AYES: NOES: ACTION TAKEN AND ENTERED ABSENT: ABSTAIN: ON MINUTES OF THE BOARD OF SUPERVISORS ON THE DATE SHOWN. Contact:Sara Hoffman,335-1090 ATTESTED December 18, 2001 JOHN SWEETEN,CLERK OF THE BOARD OF SUPERVISORS AND COUNTY ADMINISTRATOR cc: CAO IM, 4( Mickey Davis,General Services Laura Lockwood,CAO B DEPUTY Davida Amenta,CAO Department Heads _ BACKGROUND/REASON(S) FOR RECOMMENDATION(S): On June 19, 2001, the Board of Supervisors accepted a report on implementation of the County's Energy Reduction Plan. At that time, the Board also requested a summation and consolidation of all energy policy adopted by the Board for review in December 2001. This report responds to that request and includes: ➢ Energy Reduction Plan and plan implementation; Alternative power suppliers; ➢ Alternate power production; Sustainable building policy ➢ Energy reliability - generators and UPS back-up systems; and ➢ Blackout/power loss preparedness. Energy Reduction Plan On March 6, 2001, the Board of Supervisors approved the County's Energy Reduction Plan, designed to implement the Board of Supervisors' policy of reducing electrical use by at least 10% with an overall minimum energy use reduction of 8%. The Energy Reduction Plan (see Attachment 1) provides a framework for a coordinated countywide effort to achieve the Board's policy, addressing: operational standards; facility standards; equipment standards; ➢ responsibilities; communication; and ➢ tracking and monitoring. As part of the Energy Reduction Plan, departments identified two levels of energy contacts: 1) Site Contacts who act as a central point of dissemination for information about energy savings as well as documenting energy saving actions at their sites and 2) Department Contacts for receiving and distributing notices of blackouts and for ensuring coordinated departmental efforts. Contra Costa County's Energy Reduction Plan was among the first developed by a California County and has been viewed as a model for other counties. CSAC has the plan posted on their website. Currently, the Energy Reduction Plan standard for heating County facilities in the winter is 66° for thermostat settings. However, it has come to staffs attention that, in some cases, state or federal law or regulation may require thermostat settings above 660. For example, Head Start regulations require temperatures of 68°. In addition, General Services has received complaints from some departments that the offices are "too cold." Many of the complaints are from departments that occupy smaller buildings where internal temperatures are more influenced by the external temperature. Consequently, staff recommends that the standard be modified to allow for thermostat settings of 670 . 13% Reduction in Electrical Use Overall County use of electricity has declined significantly due to implementation of the Energy Reduction Plan. For the period of January through April 2001, usage decreased by 13 %. Annually, this equates to a reduction of 4,885,000 kilowatt hours. At the budgeted energy cost of 22.8¢ per kilowatt-hour,' the County can expect a savings of over $1.1 million for the calendar year. With the conversion of service from ABAG Power to PG&E, new meters needed to be installed in many buildings. This process is not yet complete. Monthly usage data since April is still suspect and often not timely. Staff is continuing to work with PG&E to resolve this difficulty. In analyzing I The contract with ABAG Power electricity was billed at a flat rate. In May, the County was forced to convert back to PG&E, which charges both flat and time-of-use rates. Time-of-use rates have different charges for peak, partial-peak and off-peak periods, which results in lower average costs per kilowatt-hour than the budgeted figure for 24-hour, seven- day facilities such as the Regional Medical Center and the Martinez Detention Facility. For example, electricity costs averaged 15.3¢ per kilowatt hour for the Martinez Detention Facility for the period of July 4 -August 2, 2001, while they averaged 14¢ per kilowatt hour for the Regional Medical Center for the period September 3 - October 2, 2001. These variances affect the estimated annual savings. 2 usage data over several months, however, it is clear that energy usage is down and that the January to April figures are indicative of a sustained downward trend. Departments and Employees Responsible for Savings Much of the credit for the County's significant reduction in energy use is due to the commitment of County employees and departments. Special thanks go to the departments and staff in buildings who have demonstrated sustained and significant decreases in the electrical use: 31% reduction - 4333 Pacheco Building, Health Services Hazardous Materials 26% reduction - 2425 Bisso Lane, multiple County departments 23% reduction - 1220 Morello Ave., General Services Department 20% reduction - 20 Allen St., Health Services Administration On a department-wide basis, kudos go to Superior Court, with an overall 15% electrical use reduction in four facilities and the Library with reductions ranging from 22% to 50% in eight of the libraries. In addition to reducing electrical use in their own facilities, the General Services Department has acted as the central coordinator and facilitator for much of the County's energy reduction effort. The commitment and dedication of General Services staff in supporting the departments in their efforts and facilitating/making the changes necessary to achieve the 13% electrical use reduction deserves special recognition. For example, General Services electricians, in partnership with Public Works, replaced red and green incandescent traffic light bulbs with LEDs (Light Emitting Diodes), which save an average of 134 watts per lamp. This has resulted in a 30% decrease in electricity use from January through August 2001, an overall savings of 220,927 kwh. Energy Retrofit in County Facilities Consistent with the Energy Reduction Plan, the County initiated 19 energy retrofit projects in FY 2001-02. The projects vary and include digital control systems, lighting retrofits and new HVAC systems and components. Digital Control Systems - Major County facilities have been, and are being, upgraded with digital control systems. These systems reduce energy usage by improving the coordination of HVAC components (fans, cooling units, boilers, etc.) and by reducing temperature swings. Some of the projects also include installation of variable frequency drive (VFD) fans, which modulate airflow from the fans, reducing overall energy requirements. Two projects are completed, another eight will be done by the end of this fiscal year. Cost of the digital controlNFD projects run over $2 million, funded through a combination of 3% loans from California Energy Commission, bond funds and the General Fund. Return on investment (ROI) of these projects is very favorable. For example, installation of digital controls and VFDs at the Martinez Detention Facility reduced electricity demand by 20% in June 2001 compared with the prior year. Even projecting a more conservative year round savings of 15%, the ROI on the Detention Facility retrofit is 33%. Lighting Retrofits - Lighting retrofits replace older fluorescent fixtures and bulbs with newer versions, which use at least 30% less energy. In FY 01-02, all lighting at the Los Medanos Health Center was replaced, an ROI of 15% (Note: lighting retrofits have already been completed on all other major County facilities). HVAC Systems - Eight HVAC system projects are slated for completion in FY 01-02. While the County will reap significant energy savings benefits from the projects, they were necessitated by the condition of the systems. All are more than 15 years old, some more than 30 years old. All are either failing or expected to fail imminently. These projects are expected to reduce energy use by 10-25% due to advances in energy efficiency in HVAC equipment over the past 20 years. Alternative Power Suppliers The Board also requested staff to investigate the feasibility of receiving power from a supplier other than PG&E. Staff looked into several alternatives, including direct access, publicimunicipal utility districts and energy production by the County itself. 3 Direct Access - Until May 2001, the County participated in ABAG Power, a direct access consortium. However, earlier this year a state bill was enacted that prohibits direct access in California. Apparently, the state felt it needed to be able to assure perspective buyers of California State Energy Bonds that jurisdictions would not be able to "escape" from paying their portion of the bond repayments. Public/Municipal Utility Districts - Based upon a review of case law and statutory authorities, County Counsel has advised that they do not believe that the County currently has the ability to enter the power business, either as a member of a public/municipal utility district or by establishing its own public/municipal utility. County Counsel's opinion did not address the issue of whether or not the County would have the legal authority to purchase power from a public/municipal utility district. Currently, the County does not have any facilities within the boundaries of a public/municipal electrical utility district; however, the East Bay Municipal Utility District (EBMUD) is currently evaluating the feasibility of an expanded EBMUD role in public power. The ramifications of that for Contra Costa County are not clear at this time. Energy Production - The County appears to have limited authority to produce electricity for use in its own facilities. Hydroelectric power and wind power are clearly authorized under Sections 25730 and 25731 of the Government Code. In addition, Sections 2801 and 2802 of the Public Utility Code authorize the County to produce energy from alternative sources for its own use, such as solar water heating and photovoltaics. More research would be necessary if the Board wishes to pursue the possibility of producing electricity from natural gas or other conventional fuels. Alternative Power Production Evaluation of alternative power production is an integral component of the County's Capital Facilities program. As with other projects, cost effectiveness is a major criterion. Recently, the Capital Facilities Committee reviewed proposals to install photovoltaic cells at 50 Douglas Drive and the Martinez Detention Facility. Those projects are listed separately on the Board's agenda for its consideration. In addition, as part of the building maintenance program, Capital Facilities staff is continuing to evaluate the cost benefit of solar water heaters, as conventional water heaters need replacement. Sustainable Building Policy On August 7, 2001, the Board of Supervisors approved a report from the Internal Operations Committee on sustainable building policy. The goals of the policy are to ensure that County facilities are models of energy, water use and materials efficiency, at the same time providing healthy, productive and comfortable indoor environments for employees, customers and clients. The policy further states that emerging building technologies should be incorporated into the design of future major remodels and new building projects whenever it is practical, cost effective and affordable (see Attachment 2). Energy Reliability When it appeared that summer blackouts were imminent, the Board of Supervisors requested an assessment of back-up generation capacity in County facilities. At the same time, General Services began receiving inquiries on the feasibility of generator installations. In response, General Services inventoried generators by location and capacity and developed guidelines for evaluating the advisability of installing generators in County facilities. In total, 30 generators provide back-up capacity for 26 County facilities. Some of these facilities have generators with sufficient capacity to continue facility operations, including the Regional Medical Center, Martinez Detention Facility, West County Justice Center, the Dispatch Center, the Forensics Science Building, the Sheriffs Administration (seventh floor, 651 Pine Street) and DoIT's Computer Room (30 Douglas Drive). Generators at the other facilities typically operate just emergency lights and an elevator (see Attachment 3). General Services also developed guidelines on the use of generators for County facilities (also see Attachment 3). The purpose of the guidelines is to provide information to departments on generator costs, appropriate uses and alternatives. The guidelines point out that generator installation in 4 existing buildings is usually very costly, because of the need to rewire the building to connect the sub-panels to the generator. Consequently, it is usually not cost effective to use generators to power normal continuation of services, such as during an extended period of electrical loss, except in 24- hour institutions and/or essential life saving operations. Most of the departments identified a need for continued electrical supply for phones and/or computers during a blackout. The most cost effective means of ensuring electrical reliability for this equipment is usually UPS (uninterrupted power supply) devices. Preparing for Blackout/Power Losses. To be prepared for potential blackouts/power losses, the County Administrator convened a committee of departmental representatives to identify issues related to electrical blackouts and to recommend appropriate policies and procedures to help the County both plan for and manage blackouts safely and effectively while maintaining work activities to the extent possible. The committee's work resulted in the issuance of the Contra Costa County Blackout Policy and Procedural Guidelines, which addressed the issues of communication, facility readiness/safety, work practices and timekeeping and personnel (see Attachment 4). As part of that effort, the County Administrator amended Administrative Bulletin 316 on timekeeping in emergency situations (see Attachment 5) and Administrative Bulletin 115.8, Emergency Management Plan (see Attachment 6) to include the loss of electrical power. Also, in recognition of the need for each department to be ready for potential blackouts and power losses, departments were advised to develop policies, plans and procedures consistent with the Administrative Bulletins and the Blackout Policy and Procedural Guidelines to prepare their department for receiving communications on anticipated blackouts; internally communicating such notices throughout the department; ensuring the readiness of each facility in case of blackout; and managing and maintaining work and service delivery activities in the event of a blackout. In addition, the County Administrator worked with Agency and Adult Services to identify and publicize the location of sites where frail seniors and others could be sheltered from excessive summer heat during blackouts (see Attachment 7). 5