HomeMy WebLinkAboutMINUTES - 12182001 - C.115 . f
TO: BOARD OF SUPERVISORS CONTRA
FROM: John Sweeten -� = COSTA
County Administrator COUNTY
.o
DATE: DECEMBER 18, 2001 q,coiir
SUBJECT: PROPOSED PRODUCTIVITY INVESTMENT FUND PROJECTS
FOR FISCAL YEAR 2001-2002
SPECIFIC REQUEST(S)OR RECOMMENDATION(S)&BACKGROUND AND JUSTIFICATION
RECOMMENDATIONS:
1. AUTHORIZE the County Administrator to approve the expenditure of$216,750 for three
projects:
Feet Services- "Natural gas line and dispenser system" $160,000
"Wastewater treatment and pressure washer" $52,000
Building Maintenance- "PowerSight 3000" $4,750
BACKGROUND:
The Productivity Investment Fund (PIF) is a highly successful revolving loan program designed to
improve the efficiency and effectiveness of departments. Departments may apply for funding of
one-time investments that will have hard dollar savings or generate revenue for on-going
operations. Loans must be paid-back within two years. The program was established in 1986,
and a total of 50 projects have received loans from the Fund for a total allocation of$ 2,342,733
(see Attachment A).
CONTINUED ON ATTACHMENT: X YES SIGNATURE:
W_EZ8MMENDATION OF COUNTY ADMINISTRATOR_RECOMMENDATION OF BOARD COMMITTEE
_APPROVE OTHER
SIGNATURE(S):
ACTION OF BOAR N 42z, 4 r--s a Y [tZ0 APPROVED AS RECOMMENDED OTHER
VOTE OF SUPERVISORS
I HEREBY CERTIFY THAT THIS IS A
_ UNANIMOUS(ABSENT ) TRUE AND CORRECT COPY OF AN
AYES: NOES: ACTION TAKEN AND ENTERED
ABSENT: ABSTAIN: ON MINUTES OF THE BOARD OF
SUPERVISORS ON THE DATE SHOWN.
Contact: Tony Enea(5-1094) nn
CC: County Administrator ATTESTEDY/.000i7vPI>Z,),�
General Servics JOHN SW15ETEN,CLERK OF
THE BOARD OF SUPERVISORS
t— AND COUNTY ADMINISTRATOR
Post-it®Fax Note 7671 Date °ges��U BY DEPUTY
To /a-- From
z
Co./Dept. n Co.
I Phone# Phone#
! Fax# ;t ,�
Q Fax#
.J
t
_a,4 ,��
��4', 3
y � �ry
`..�._�
In September, the County Administrator's Office solicited requests for proposals from
Departments. Proposals were received and reviewed by a five-member Board with
representatives from the County Administrator, Employment and Human Services, Health
Services and the Sheriff's:Department. The PIF Board evaluated the proposals using the criteria
included as Attachment B and recommended that the following proposals be approved:
1. Fleet Services — "Natural gas line and dispenser system," $160,000
The project involves the purchase and installation of a direct supply natural gas line with a
two-nozzle, fast fill compressed natural gas (CNG) dispenser system at the Waterbird
Fueling Station. Currently, Fleet Services uses a CNG fueling trailer which needs to be
picked up and taken off site for refueling. The new system would be connected directly to
PG&E's natural gas supply,thereby allowing a constant supply of CNG at a lower rate than
the current system. Fuel therms for the new system can be purchased at 79% less than
the current system.
2. Fleet Services —"Wastewater treatment system and pressure washer", $52,000
The project involves the purchase and installation of a wastewater treatment system,
natural gas hot water pressure washer, and wash slab replacement at Fleet Services. The
wastewater treatment system will allow water to be treated as well as recycled. The
current system.is unable to treat wastewater and the Department has had to have it hauled
off-site for treatment. -The water pressure washer will help the Department to avoid repairs
caused by corroded and unclean vehicles as well as shorten the amount of staff time
needed to hand wash equipment. Savings will result from the ability to treat and recycle
wastewater on site and savings in staff time as the result of improved technology.
3. Buildinq Maintenance — "PowerSight 3000", $4,750
The intent of this purchase is to enable electricians to analyze power usage "in house"
versus hiring outside contractors to perform the same service. The equipment will be able
to analyze how energy is used during high and low power usage periods.
ATTACHMENT A
SUMMARY OF PRODUCTIVITY LOANS TO DATE
Title Department Amount
1 Microfilming Sheriff-Coroner $42,345
2 Jury summoning Superior-Municipal Court $66,000
3 New Payroll System Auditor-Controller $35,000
4 *New Printing Press General Services ---
5 Camera/Platemaker General Services $17,864
6 Automation Clerk-Recorder $25,000
7 Inmate Baking Program Sheriff-Coroner $32,000
8 Boiler Modifications General Services $20,000
9 Water Recycling System General Services $25,000
10 Computerization CCHP Health Services $20,270
-1-1—Freon Recycling.System. _ General Services _._. ..____$_5_,.5_00___..
12 Case/Mgt. Automation Probation-Municipal Court $27,960
13 Billing Automation Health Services $51,090
14 Desktop Publishing Sheriff-Coroner $5,912
15 Automation "Collection" CAO-Revenue Collection $12,964
16 Desktop Publishing CAO-Data Processing $20,000
17 Voice Response System Municipal Courts $70,000
18 *Computer Graphic Health Services ---
19 Parcel Manifest System General Services $11,584
20 Jet Wash Station General Services $9,576
21 Video Recording System Superior Court $75,000
22 Automation "Collection" Probation-Municipal Court $27,960
23 Audio Video Recording Superior Court $113,000
24 Centralized Jury Svcs Municipal/Superior $140,000
* PIF projects absorbed by the department. ($29,000) and($32,300)respectively.
-
ATTACHMENT A
SUMMARY OF PRODUCTIVITY LOANS TO DATE
Title Department Amount
25 Library Coordinator Library $50,000
26 Lighting Retro Library $9,400
27 PBX Switch General Services $135,000
28 Lift Program General Services $5,500
29 On-line Budget System County Administrator/Auditor $230,000
30 Electronic Reports Probation $89,000
31 Tape System Clerk of the Board $2,500
32 Homeless Feeding Program Sheriff $14,080
33 Self Check-out System and Other Automation Library $60,788
34 Predictive Dialer Office of Revenue Collection $121,675
35 Computer Automation Animal Services Dept $112,000
36 Self Check-out SystemExpansion Library -- $20-000----
37 Automated Book Renewal & Patron Notification Library $38,100
38 Digital Video Server CCN $50,000
39 Replacement Vacuums General Services $9,000
40 Two-Color Printing Press General Services $100,000
41 Simulated Weapons Training System Sheriff $90,000
42 Staff Workstation -Automated Check-In System Library $28,500
43 Archive Microfilm Library $42,850
44 Variable Frequency Drive General Services $35,000
45 Electric Conduit Bender General Services $6,000
46 High-Speed Digital Copier General Services $50,000
47 Study of Mapping Operations Public Works/Assessor $50,000
48 Sign Making Hardware Public Works $18,000
49 Automated Collection Development Analysis Library $30,315
50 MDF HVAC System & Energy Mgmt System General Services $91,000
TOTAL: $2,342,733
ATTACHMENT B
Criteria for Evaluation
1. Short payback projects have priority over long payback projects.
a. Allows for fast turnover of funds that generate monies for additional projects.
b. Maximum of two years for payback.
c. Priority for those projects which exceed payback amount.
2. Projects that are innovative or significantly improve current operations are
encouraged.
a. Projects that request funds for an expansion of current operations without
introducing changes or innovations in policies and practices or systems and
procedures are not appropriate.
3. Projects with a larger payback ratio will receive higher ranking for funding.
a. The payback ratio is defined as net revenue increases and/or net savings as
compared to investment.
b. Gross revenue increases will be reduced by factors not related to the project
-- -- — -- such -as-rate-increases-and-increased-costs to obtain-revenue --- —
c. Gross savings attributed to cost reductions will be reduced by factors not
attributable to the project such as service level reductions and budget cuts.
4. Projects with applicability to other departments will receive higher ranking.
a. Project with broad applications and transferability to other departments will
receive higher priority.
5. Projects that are partially financed with department funds will receive additional
consideration.
a. Partial financing by departments indicates a greater commitment towards the
project and frees up funding for other projects.
6. Projects that will have a positive impact on the General Fund will have priority.
7. Projects that have positive impacts on other departments will have priority over
projects that have negative impacts on other departments. Negative impacts
associated with a project will be considered in determining the net benefit to the
County.
8. Interdepartmental proposals resulting in combined hard dollar savings are
encouraged.