Loading...
HomeMy WebLinkAboutMINUTES - 12052000 - C130 e, 1.?""' TO: BOARD OF SUPERVISORS CENTRA .'--' FROM:: Phil Batchelor '; COSTA County Administrator - COUNTY DATE: DECEMBER 5, 2000 SUBJECT: PROPOSED PRODUCTIVITY INVESTMENT FUND PROJECTS FOR FISCAL YEAR 2000-2001 SPECIFIC REQUEST(S)OR RECOMMENDATION(S)S BACKGROUND AND JUSTIFICATION RECOMMENDATIONS: 1. AUTHORIZE the County Administrator to approve the expenditure of $201,850 for six projects: Library- "Microfilm for historical newspapers" $42,850 General Services- "Variable Frequency Drive" $35,000 "Electric Conduit Bender" $6,000 "High-speed digital copier" $50,000 Public Works/Assessor- "Study of Mapping Operations" $50,000 Public Works- "Sign making hardware" $18,000 BACKGROUND: The Productivity Investment Fund (PIF) is a highly successful revolving loan program designed to improve the efficiency and effectiveness of departments. Departments may apply for funding of one-time investments that will have hard dollar savings or generate revenue for on-going operations. Loans must be paid back within two years. The program was established in 1986, and a total of 42 projects have received loans from the Fund for a total allocation of$ 2,019,568 (see Attachment A). CONTINUED ON ATTACHMENT: X YES SIGNATURE: EMENDATION OF COUNTY ADMINISTRATOR RECOMMENDATION OF BOARD COMMITTEE APPROVE —OTHER SIGNATURE(S): ACTION OF BOAR �3ecem er APPROVED AS RECOMMENDS OTHER ACTION OF B 7 VOTE OF SUPERVISORS I HEREBY CERTIFY THAT THIS IS A XX UNANIMOUS(ABSENT_ *a } TRUE AND CORRECT COPY OF AN AYES:_ _ NOES: ACTION TAKEN AND ENTERED ABSENT: ABSTAIN: ON MINUTES OF THE BOARD OF SUPERVISORS ON THE DATE SHOWN, Contact: Tony Enos(5-1094) CC: County Administrator ATTESTED ]pe}ber 5, 2U00 Library PHIL BATCHELOR,CLERK OF General Service THE BOARD OF SUPERVISORS Public works AND CM�q= ** Supervisor V seat is vacant B UTY In September, the County Administrator's Office solicited requests for proposals from Departments. Proposals were received and reviewed by a five member Board with representatives from the County Administrator, Employment and Human Services, Health Services and the Sheriffs Department. The PIF Board evaluated the proposals using the criteria included as Attachment B and recommended that the following proposals be approved: 1. Library—"Microfilm for Historical Newspapers," $42,850 The project involves the purchase of microfilm for historical newspapers currently being stored on-site. Benefits include the improvement of customer access to the documents via microfilm, a reduction of the fire hazard of storing old, dry newspapers on site, reduction of storage space, and the elimination of staff time spent on archival maintenance. Savings will result from the elimination of storage costs. 2. General Services —"Variable Frequengy Drive", $35,000 The project involves the purchase and installation of a Variable Frequency Drive (VFD) to the HVAC system at 595 Center Avenue. The VFD will reduce the energy consumption in the building by approximately 10% and will provide the occupants with better air quality. Savings will result from the reduction of energy usage at 595 Center Avenue. 3. General Services—"Electric Conduit Bender", $6,000 The intent of this purchase is to reduce the number of hours spent manually bending conduit, thereby reducing the cost of the process. The electric conduit bender will provide cost savings and higher quality customized conduit to customer departments. Savings will result from the reduction of staff time spent bending conduit. 4. General Services —"High Speed Digital Copier", $50,000 The department will install a high speed, digital duplicating system at the Copy Center in the basement of 651 Pine Street. The intent of this is to reduce County labor and equipment costs for high speed duplicating by offering departments the option of sending work currently done within departments and by outside vendors to the Copy Center. Payback of the PIF loan will be possible from revenue attained by the increased use of the Copy Center by County departments. 5. Public Works/Assessor— "Study of Mapping Operations", $50,000 The intent of this joint project will be to hire a consultant to review the mapping operations of the two departments and recommend improvements to reduce the duplication of effort in the maintenance of parcel maps. The consultant will also evaluate and recommend ways to further integrate and coordinate with other County systems. Savings are expected to result from the map maintenance cost within each department after implementation of the consultant's recommendations. 6. Public Works—"Sign Making Hardware", $18,000 The department will purchase additional sign making equipment to increase the productivity and capability of the current sign making operation. Savings will be the result of increased productivity of the sign making operation. ATTACHMENT A SUMMARY OF PRODUCTIVITY LOANS TO DATE Title Department Amount 1 Microfilming Sheriff-Coroner $42,345 2 Jury summoning Superior-Municipal Court $66,000 3 New Payroll System Auditor-Controller $35,000 4 *New Printing Press General Services --- 5 CameralPlatemaker General Services $17,664 6 Automation Clerk-Recorder $25,000 7 Inmate Baking Program Sheriff-Coroner $32,000 8 Boiler Modifications General Services $20,000 9 Water Recycling System General Services $25,000 10 Computerization CCHP Health Services $20,270 11 Freon Recycling System General Services $5,500 12 Case/Mgt. Automation Probation-Municipal Court $27,960 13 Billing Automation Health Services $51,090 14 Desktop Publishing Sheriff-Coroner $5,912 16 Automation "Collection" CAC'}-Revenue Collection $12,964 16 Desktop Publishing CACI-Data Processing $20,000 17 Voice Response System Municipal Courts $70,000 18 *Computer Graphic Health Services --- 19 Parcel Manifest System General Services $11,564 20 Jet Wash Station General Services $9,576 21 Video Recording System Superior Court $75,000 22 Automation "Collection" Probation-Municipal Court $27,960 23 Audio Video Recording Superior Court $113,000 24 Centralized Jury Svcs Municipal/Superior $140,000 * PIF projects absorbed by the department ($29,000)and($32,300)respectively. SUMMARY OF PRODUCTIVITY LOANS TO DATE Iq Title Department Amount 26 Library Coordinator Library $50,000 26 Lighting Retro Library $9,400 27 PBX Switch General Services $135,000 28 Lift Program General Services $5,500 29 On-line Budget System County Administrator/Auditor $230,000 30 Electronic Reports Probation $89,000 31 Tape System Clerk of the Board $2,500 32 Homeless Feeding Program Sheriff $14,080 33 Self Check-out System and Other Automation Library $60,788 34 Predictive Dialer Office of revenue Collection $121,675 35 Computer Automation Animal Services Dept $112,000 36 Self Check-out System Expansion Library $20,000 37 Automated Book Renewal & Patron Notification Library $38,100 38 Digital Video Server CCTV $50,000 39 Replacement Vacuums General Services $9,000 40 Two-Color Printing Press General Services $100,000 41 Simulated Weapons Training System Sheriff $90,000 42 Staff Workstation -Automated Check-in System Library $28,500 TOTAL: $2,019,568 ATTACHMENT B Criteria for Evaluation I Short payback projects have priority over long payback projects. a. Allows for fast turnover of funds that generate monies for additional projects. b. Maximum of two years for payback. c. Priority for those projects which exceed payback amount. 2. Projects that are innovative or significantly improve current operations are encouraged. a. Projects that request funds for an expansion of current operations without introducing changes or innovations in policies and practices or systems and procedures are not appropriate. 3. Projects with a larger payback ratio will receive higher ranking for funding. a. The payback ratio is defined as net revenue increases and/or net savings as compared to investment. b. Gross revenue increases will be reduced by factors not related to the project such as rate increases and increased costs to obtain revenue. c. Gross savings attributed to cost reductions will be reduced by factors not attributable to the project such as service level reductions and budget cuts. 4. Projects with applicability to other departments will receive higher ranking. a. Project with broad applications and transferability to other departments will receive higher priority. 5. Projects that are partially financed with department funds will receive additional consideration. a. Partial financing by departments indicates a greater commitment towards the project and frees up funding for other projects. 6. Projects that will have a positive impact on the General Fund will have priority. 7. Projects that have positive impacts on other departments will have priority over projects that have negative impacts on other departments. Negative impacts associated with a project will be considered in determining the net benefit to the County. 8. Interdepartmental proposals resulting in combined hard dollar savings are encouraged.