TO; BOARD OF SUPERVISORS CONTRA
00
COSTA
FROM: Family and Human Services Committee , COUNTY
DATE. February 2, 1999 cour�r�
SUBJECT: Status Report on the Juvenile Systems Planning Advisory Committee (JSPAC)
SPECIFIC REQUEST(S) OR RECOMMENDATION(S) & BACKGROUND AND JUSTIFICATION
RECOMMENDATIOMIS).
I. ACCEPT the attached report from the Juvenile Systems Planning Advisory Committee
(JSPAC) On their current focus and activities, including:
Juvenile Mall replacement
>_ Grin Allen Rehabilitation Facility expansion
Juvenile ball expansion
SafeFutures program
>_ Girls program
. CONCUR with the recommendation of JSPAC to provide informational meetings for the
neighbors surrounding Juvenile Hall to brief them on the Juvenile Mall replacement project,
3. REQUEST the County Administrator to provide information on how the County will be
financing its proposed 30% match for the Juvenile Hall replacement project grant application.
4. REQUEST the County Administrator to provide a report on the status of construction of the
girls program project and urge the County Administrator to take any action possible to
accelerate its completion.
CONTINUED ON ATTACHMENT: X--YES SIGNATURE,
RECOMMENDATION OF COUNTY ADMINISTRATOR—RECOMMENDATION Of BOARD COMMITTEE
—APPROVE —OTHER
SIGNATURES): MARK DESAULNIER AYLE B.ulMA
ACTION OF BOARDON � �° 77-77 APPROVED AS RECOMMENDED _
VOTE OF SUPERVISORS
I HEREBY CERTIFY THAT THIS IS A
UNANIMOUS(ABSENT } �:' .r } TRUE AND CORRECT COPY OF AN
AYES; NOES: ACTION TAKEN AND ENTERED
ABSENT. ABSTAIN: ON MINUTES OF THE BOARD OF
SUPERVISORS ON THE DATE SHOWN.
Contac Sara Hoffman,335-1090 � 57
ATTESTED �`� �����-���r� A �,�'�`
PHIL BATC LOR,°Ci.ERk O�-F
THE BOARD OF SUPERVISORS
oe: CAO AND COUNTY ADMINISTRATOR
George Roemer,GAO
`terry Stag,Probation
Chris Adams,JSPAC(via Probation) BY � .-° _.r ,«;� r.• ,DEPUTY
FHS#3
BACKGROUND/REASONS FOR RECOMMENDATIONS:
At its January 25, 1999, the Family and Human Services Committee heard the attached report on the
status of Juvenile Systems Planning and Advisory Committee (JSPAC) activities by its chair, Chris
Adams. The report covers the status of
Juvenile Wall replacement
Cerin Allen Rehabilitation Facility expansion
Juvenile Hail expansion
SafeFutures program
>- Girls program
Discussion focused around the Juvenile Full replacement project and the girls program.
Juvenile Hall_Replacement Project
Ms. Adams explained that the Juvenile Hall replacement project is financially feasible due to the infusion
of state and federal grant monies. Contra Costa County will be submitting an application in mid March
for$22.5 million. The grant requires at least a 25% match, with preference berg given where matches
are greater. The County is proposing a 30% match of $9.75 million. At this time, the County has
identified $5 million in bond monies to ensure the match. Plans are underway to identify the remaining
match.
Supervisor Gayle Uilkema expressed concern that the match monies have not yet been clearly identified
and that, if the funds are not available, the project should not go forward. She suggested that the
County Administrator be asked the source of the match money; when it will be known if the full $9.75
million will be available; and whether more than the 30% match could be available. She felt that this
information needed to be provided quickly, since she did not feel comfortable about informing the
community of the proposed project if the County's match is not secure.
Terry Starr explained that JSPAC felt it was very important to have an informational meeting with the
neighborhoods about the Juvenile Wall project. Juvenile Hall has been a very good neighborhood in
the past. There has only been one escape in four years and no complaintsfrom the neighborhood.
However he felt it was very important to alert the neighborhood of the proposed construction and to
respond to concerns, Mr. Starr and Ms. Adams requested that Supervisor Uilkema be involved in those
meetings since it is within her district. Supervisor Uilkema stated that she would be happy to work with
JSPAC on the meetings as long as the County truly has the ability to respond to neighborhood concerns.
Mr. Starr stated that they both can and cannot respond to concerns. There are no alternative locations
for the project; however, they could take actions to make the construction process less bothersome for
the neighborhood. Linda Baker, JSPAC member, concurred that it really need's to be an informational
meeting so that neighbors are not surprised when construction begins.
Girls Program
Ms. Adams stated that the girls program project is slated for completion by the end of December 1999.
She had hoped it would be completed by Spring. Mr. Starr stated that there had been problems in
putting the project'together since it had to be redone to meet budgetary constraints.
Both Supervisors Uilkema and DeSaulnier expressed concerns about the delay of the project.
Supervisor Uilkema asked for a report on the status of the project and why it,is being delayed. Both
supervisors agreed that this concern needed to be expressed to the County Administrator and that he
should be requested to accelerate completion as much as possible.
2
�.}v.
!�
Cvnva Costa County 50 Douglas give
Suite 201
JUVENILE SYSTEMS PLANNING Martinez, CA 94553
ADVISORY COMMITTEE
(510) 313-4152
Chris Adams,Chair
DATE: January 25, 1999
TO: Family&Deman Services Committee
FROM: Chris Adams,Chairperson,JSPAC
SURTECT: ISPAC Report
Today,the Juvenile Systems Platuting Advisory Committee(JSPAC)is rna ing a report to the
Board of Supwsrisors' Family,fir.Human Services Committee cones its current focus and
activitics<
Met Hist
The Beard of Supervisors initially fonnw-' JSPAC in June of 1992 to provide counsel and advise
to the Board of Supervisors on replaeemeW and/or remodel of the Coxmty's antiquated)juvenile
hall facility.
The conumittea members were appointed by the Board from all parts of the:community,inclluding
private citizentat,irw enforcement and members rs+of various county agencies.cies. A substantial number
of the or oW comminee members have remained active:throughout the seven years of JSPAC"s
existence and continuer to serve today.
Over the.years,in addition to its primary role of exploring possibilities for a new juvenile hall
complex,JSPAC telt on the need to identify a continuum of came for y+oungstm who find
thcme:lves in the Contra Costa County Suve�rdle Justice System.
PruuTms
JSPAC continues to be a very high energy organization that meets monthly,which has been
involved in many individual issues. If anything,the JSPAC enthusiasm for the following
projects is more energirAd now than it has been at anytime in the process.
The;Probation Department has provided sta tg for the past three years and continues to work
closely with JVAC and its various aomsnittaes,
02 _
�'`•tlr�'� �+f�I�7� Actiyit�ec
This project continues to be the leo. 1 project for JSPAC members.
As a result of an infusion of federal money, as well as almost$140 million dollars in state
money, counties are finally going to be able to compete for monies to build and remodel
juvenile hall facilities. In the current year, 199898, there is approximately $180 million
dollars available for these projects statewide. Because Contra Costa County has been
actively preparing for replacing its juvenile hall complex, and because there is a great
deal of energy in the community, and because we can certainly demonstrate the need,we
are very encouraged that our grant proposal will be successful.
In that context, the CAC), along with JSPAC and the Probation Department,has enlisted
the talents of Mark Morris to help in drafting the grant proposal which must be completed
in mid-March. An executive steering committee will be meeting in April and the grants
will be announced at the:Board of Corrections meeting in May of 1999.
The County Administrator's office has been meeting on a regular basis with members of
JSPAC and other interested parties to deal with such issues as the required 25%match.
The CAC)has been able to secure some$5 million in bond monies and plans are
underway to identify the remaining match. While that money needs to be committed up
front, the requirement is that the match be available as construction proceeds and plans
are being actively pursued to mare sure that there is at least a 25%match.
Currently, the groups that have been working on this project foresee the building of pods
on an existing site at juvenile hall to house some 160 wards. There may or may not be
money to refurbish or construct a new kitchen facility and it will be necessary to utilize
some 50 beds .from the existing juvenile hall for a total of 210 beds.
One of the reasons for this report being made to Family&Human Services Committee at
this time is to talk about the need to have some type of a community gathering so that the
neighborhood surrounding the new juvenile hall facility would have an opportunity to ask
questions and express any concerns. Since the juvenile hall is located in Supervisor
Uilkerna's district,we would like to propose working with Supervisor Uilkema and her
staff to accomplish a community meeting sometime in the near future.
The CAO has prepared a more detailed draft Juvenile Hall construction grant proposal
which is attached. This will be further refined and presentd to the Board of Supervisors
at the March 2, 1999 meeting.
- 3 -
2. ab bion F ran:
'Phis 26 bed expansion is due to open within the next few weeks. There will be a
dedication ceremony for the new dormitory held at the facility on February 1, 1999. The
additional 26 beds at Orin.Allen should have an immediate effect on the overcrowding at
juvenile hall and will allow the Probation Department to better work with younger wards
who are committed to the camp in the future.
3. JuvenileHall lac n:
Currently,the County has secured a million dollar grant from the federal government to
expand the secure unit(Tamalpais)by some 10 hard beds. In any new juvenile hall
construction, Tamalpais would remain and would continue to function as the unit
designed to detain the county's most serious wards.
4. SafJeFutu=& rpgram:
The County is currently in its third year of the SafeFutures program and all of the
components of that program are operating in a positive fashion. The 20 bed boys'
program.at Summit Center has been especially valuable to Probation as it has offered
residential care for up to 20 boys who otherwise would have been placed in group homes.
The short, intense program, in collaboration with Mental Health and County Schools has
Tilled a critical need in dealing with this type of youth for the County. It must be noted
that, despite verbal assurances from Federal administrators, a signed third year grant
award has not been received.
5. Girls_ _' ogra :
The Chris Adams' Girls' Program is on-line for completion by the end of December,
1999. This facility is considered crucial in terms of the continuum of care for the County
and JSPAC's only concern on this project revolves around the length of time it's taken to
get this facility online.
JSPAC will continue to pursue all of these projects and is always available to answer questions
or to be of assistance to the Board of Supervisors and to this committee in particular.
CA/TS:ds
Attachment
JUVENILE HALL CONSTRUCTION CRAFT PROPOSAL
1. Grant Application Schedule
RFP Issued DRAFTmber 12, 1998
Bidders Conference December 3, 1998
Operating Costs Estimate January 21, 1999
Needs Assessment Update February 8, 1999
Public Meeting Mid February, 1999
Completion of Application February 24, 1999
Presentation to Board of Supervisors March 2, 1999
Filing Deadline March 17, 1999
SCLC Technical Review March 26, 1999
SCLC Preliminary Ratings April 6, 1999
County Presentations April 9, '1999
BOC Considers Funding Recs May 20, 1999
Funding Awards June, 1999
2. Phase I — Construction of New Juvenile Hall Facility
Meed
The need for increased Juvenile Nall capacity in Contra Costa County is well-
documented. A needs assessment done several years ago indicated that the
County would need at least 300 secure detention and/or treatment beds by the
year 2005.
The current capacity at the Hall is 180, however, the average daily population
(ADP) has been hovering at around 175 for the past year, at times exceeding
185. The ADP has increased steadily despite the Probation Department's efforts
to control it through such detention alternatives as the California Youth Authority,
home supervision, electronic monitoring, private placement and placement, at
rather county juvenile halls. For example, utilization of home supervision and
electronic monitoring has increased about 200% in the last five years from 40 to
120 youths, but the ADP continues to rise. The County has also resorted to
emergency measures. In 1992, the Juvenile Court Judge ordered that an
administrative cap be placed on the Nall to control population. For awhile,
enforcement of this order coupled with more stringent intake criteria seemed
successful. However, police agencies complained that the limited Nall capacity
was not meeting their incarceration needs and that community safety was at
issue. As a result, the administrative cap has not been enforced for the last
several years.
In addition to population control measures, the County .has also taken
Intermediate steps to increase bed capacity by constructing new units at the Hall,
adding 30 beds since 1992. Additional bed space is currently under construction
t the Ranch facility to increase capacity at the Ranch by 26 beds, from 74 to
100. However, these intermediate steps Will not address the longer-term needs
for juvenile detention, StAk
Project Cost
Grant Application $22,500,000
30% Cash Match $ 9,750,000
Total Project Cost $32,250,000
Project Scope
The proposed facility would be constructed on the grounds of and adjacent to the
existing Juvenile Hall. The new facility would comprise eight 20--bed units
constructed in pairs, to allow for separation of a pair of units during the day and
unification by night. The feature of joining the units at night will allow the
Probation Department to staff the facility more efficiently than in a traditional
configuration.
An option being considered is to construct half of the rooms in each unit at 70
square feet in dimension and the other half at 100 square feet, which would still
allow for future expansion of capacity of each unit from 20 to 30 beds, but at a
lower project cost. This option would have the advantage of allowing for the
maximum expansion permitted while minimizing the cost per bed ratio, key
elements on which grant applications will be rated. This option may also enable
the County to lower the total project cost and increase the match ratio, another
key rating element.
The new facility would include the following physical components:
Juvenile Hall
Admissions and Release
Administration
Central Control
[Detention Housing (8 units with a total of 160 beds, expandable to 240 beds)
Food Service
Health Services
Laundry
Staff Support
Visiting
Exterior Areas
Field
Recreation Storage
Unit Recreation (paved, one per each unit)
Activity Courtyards (2)
Parking LmAFT
Sallyport
3. phase 2. The second phase of the proposal would be the renovation of the
existing Juvenile Hall. Most of the Juvenile Hall facility was built in 1949 and is
presently in poor condition and does not meet current standards for juvenile
facilities. For example, .standards for living unit size, wash basins and toilets,
sleeping room size are not met but excused because due to the date of
construction and the "grandfathering" in of past standards for old facilities. Due
to the need to have at least 160 juvenile hall beds operational at all times,
proceeding with the Phase 2 proposal would be contingent on a grant award for
Phase 1,
The County Juvenile Hall Replacement Team is currently in the process of
estimating the cost to renovate the existing Juvenile Hall.