Loading...
HomeMy WebLinkAboutMINUTES - 12141999 - C62--C66 TO: BOARD OF SUPERVISORS William Walker, M.D. , Health Services Director FROM: By: Ginger Marieiro, Contracts Administrator Contra DATE: December 1, 1999 Costa County SUBJECT: Approval of Standard Agreement #28-301 with the State Emergency Medical Services Authority SPECIFIC REQUEST(S)OR RECOMMENDATION(S)&BACKGROUND AND JUSTIFICATION RECOMMENDED ACTION: Approve and authorize the Health Services Director, or his designee (Art Lathrop) , to execute on behalf of the County, a Statement of Compliance, the required Drug-Free Workplace Certification and Standard Agreement #28-301 (State #EMS-9044) with the State Emergency Medical Services Authority, in the amount of $80, 000, for the period from October 1, 1999 through September 30, 2000, for the Emergency Medical Services for Children Project . FISCAL IMPACT: Approval of this agreement by the State will result in $80, 000 of State funding for the Emergency Medical Services for Children Project . No County funds are required. BACKGROUND/REASON(S) FOR RECOMMENDATION(S) : On December 12 , 1995, the Board of Supervisors approved the County' s Emergency Medical Services (EMS) Plan to provide a comprehensive system within Contra Costa County that assures the best possible care for ill or injured children. Approval of Contract #28-301 will allow the County to implement the Emergency Medical Services for Children Project, through September 30, 2000 . Three sealed/certif ied copies of this Board order should be returned to the Contracts and Grants Unit for submission to the State Emergency Medical Services Authority. L CONTINUED ON ATTACHMENT: S SIGNATURE A_ RECOMMENDATION OF COUNTY ADMINISTRATOR RECOMMENDATION OF BOARD COMMITTEE APPROVE OTHER SIGNATURE(S): .i�,a A ACTION OF BOARD ON. bfce_h--4er APPROVED AS RECOMMENDED OTHER VOTE OF SUPERVISORS I HEREBY CERTIFY THAT THIS IS A TRUE UNANIMOUS (ABSENT AND CORRECT COPY OF AN ACTION TAKEN AYES: NOES: AND ENTERED ON THE MINUTES OF THE BOARD ABSENT: ABSTAIN: OF SUPERVISORS ON THE DATE SHOWN. ATTESTED PHIL BATCHELOR,CLERK OF THE BOARD OF Contact P&96n-Lathrop (646-4690) SUPERVISORS AND COUNTY ADMINISTRATOR CC: State Emergency Medical Services Authority Health Services Dept (Contracts) BY'­)�- DEPUTY Contra TO: BOARD OF SUPERVISORS Costa FROM: John Cullen, Director x� JCounty Employment and Human Ser esepartment sTA cour DATE: November 30, 1999 SUBJECT: APPROVE and AUTHORIZE the Employment and Human Services Director, or designee, to ACCEPT a California Cooperative Occupational Information System (CCOIS) grant in the amount of$62,647 from the State of California Employment Development Department for the period from January 1, 2000 through January 31, 2001. SPECIFIC REQUEST(S)OR RECOMMENDATION(S)&BACKGROUND AND JUSTIFICATION RECOMMENDED ACTION: APPROVE and AUTHORIZE the Employment and Human Services Director, or designee, to ACCEPT a California Cooperative Occupational Information System (CCOIS) grant in the amount of$62,647 from the State of California Employment Development Department for the period from January 1, 2000 through January 31, 2001. FINANCIAL IMPACT: No County costs. CHILDREN'S IMPACT STATEMENT: Services under this grant indirectly support the third community outcome identified in the Contra Costa Children's Report Card: "Families that are Economically Self-Sufficient". Activities under this grant result in local labor market information for residents to make informed career and job training decisions. BACKGROUND: On January 25, 19941) the Board authorized the Executive Director of the Private Industry Council to execute a CCOIS grant with EDD to conduct labor market information collection and dissemination. Activities under this grant continued with the merger of the PIC into the Employment and Human Services Department. Renewal of the CCOIS grant marks the seventh year of labor market research in Contra Costa County. On September 1, 1999, the State of California Employment Development Department California Cooperative Occupational Information System (CCOIS) office notified the Employment and Human Services Department that it would renew its grant for the collection and dissemination of local labor market information. CONTINUED ON ATTACHMENT: SIGNATURE: I � L N RECOMMENDATION OF COUNTY ADMINISTRATOR RECOMMENDATION OF BOARD COMMITTEE APPROVE OTHER SIGNATURE(S): /_, f ACTION OF BOARD ON b-ee e yh be�' I y, / % APPROVED AS RECOMMENDED X OTHER VOTE OF SUPERVISORS I HEREBY CERTIFY THAT THIS IS A TRUE UNANIMOUS(ABSENT ' ) AND CORRECT COPY OF AN ACTION TAKEN AYES: NOES: AND ENTERED ON THE MINUTES OF THE BOARD ABSENT: ABSTAIN: OF SUPERVISORS ON THE DATE SHOWN. ATTESTED bf C'eVA` 6&' / ql l t 9 9 PHIL BATCHELOR,CLERK OF THE BOARD OF SUPERVISORS AND COUNTY ADMINISTRATOR Contact: RONALD A.WETTER,6-53522 cc: EHSD(CONTRACTS UNIT)-TM COUNTY ADMINISTRATOR BY�- � 'L't'e`t-- ,DEPUTY AUDITOR-CONTROLLER TO: Board of Supervisors jr Contra '� ' FROM: Dennis M. Barry, AICP �;,:k Costa Community Development Director °'r.�- -= County DATE: December 14, 1999 SUBJECT: Bay Area Air Quality Management District Grant for Contra Costa Centre Association Vanpool Program SPECIFIC REQUEST(S) OR RECOMMENDATION(S) & BACKGROUND AND JUSTIFICATION RECOMMENDATIONS Approve, in substantially the form presented, and authorize the Director of Community Development to sign a funding agreement with the Bay Area Air Quality Management District for a grant in the amount of $38,850 for the Contra Costa Centre Association vanpool program. FISCAL IMPACT None. BACKGROUND/REASONS FOR RECOMMENDATIONS On July 20, 1999, the Board of Supervisors adopted a resolution to sponsor a grant application of behalf of the Contra Costa Centre Association (CCCA) to the Bay Area Air Quality Management District (Air District) for the Transportation Fund for Clean Air Program. The CCCA is an organization of property owners in the Pleasant Hill BART Station area that was organized to jointly implement various programs, including a vanpool program to reduce auto trips to the area. The grant proposes to use Air District funds to help underwrite a portion of the lease payments on vans leased by the vanpoolers. More vanpools will reduce auto trips and related air pollution. The Air District approved the grant and now requires that the County, as the CCCA sponsor, sign a funding agreement to release the funds. A funding agreement is attached and is currently under review by County Counsel. The County must execute the funding agreement by January 7, 2000 to remain eligible for the funds. CONTINUED ON ATTACHMENT: X YES SIGNATURE K ACTION OF BOARD ON frek +bfi- 1 y, l 9 9rt APPROVED AS RECOMMENDED ( OTHER VOTE OF SUPERVISORS I HEREBY CERTIFY THAT THIS IS A TRUE AND UNANIMOUS (ABSENT,,& CORRECT COPY OF AN ACTION TAKEN AND AYES: NOES: ENTERED ON THE MINUTES OF THE BOARD OF ABSENT: ABSTAIN: SUPERVISORS ON THE DATE SHOWN. Contact: Steven Goetz (9251335-1240) ATTESTED /q, f 19--1 cc: Community Development Department (CDD) PHIL BATCHELOR, CLERK OF THE Contra Costa Centre Association (via CDD) BOARD OF SUPERVISORS AND COUNTY ADMINISTRATOR DMB\:gs `�,� l/1'1 C � \bob BY . , DEPUTY Gr FUNDING AGREEMENT BETWEEN THE BAY AREA AIR QUALITY MANAGEMENT DISTRICT AND , CONTRA COSTA COUNTY—COMMUNITY DEVELOPMENT DEPARTMENT PROJECT NUMBER 99R64 This Agreement is made and entered into between the Contra Costa County-Community Development Department,hereinafter referred to as"Project Sponsor,"and the Bay Area Air Quality Management District, hereinafter referred to as the "Air District."Attachment A,Project Specific Information;Attachment B, Project Description;and Attachment C,Monitoring of Project Performance are hereby incorporated into this Agreement by this reference. SECTION I RECITALS: 1) Air District is authorized under California Health and Safety Code Section 44223 to levy a fee on motor vehicles registered within its jurisdiction. Funds generated by the fee are to be used to implement projects and programs to reduce air pollution from motor vehicles. 2) Air District administers these funds as the Transportation Fund for Clean Air(TFCA). 3) California Health and Safety Code Section 44241 limits expenditure to specified eligible transportation control measures included in the clean air plan adopted pursuant to California Health and Safety Code Sections 40233,40717, and 40919 and limits the allocation of the funds to public agencies within the Air District's jurisdiction. 4) Air District and Project Sponsor,pursuant to California Health and Safety Code Section 44241,hereby enter into this Funding Agreement(Agreement)to implement a transportation measure(Project)to improve air quality in the San Francisco Bay Area Air Basin. 5) The Project, as used in this Agreement, is described on Attachment B. SECTION II PROJECT SPONSOR AGREES: 1) To implement the Project in accordance with the description and implementation schedule contained on Attachment B. 2) To submit detailed invoices to the Air District for reimbursement of costs and expenses incurred to complete the Project consistent with the budget and schedule contained on Attachment A.Invoices shall specify the time period for the invoice, itemize staff charges to the Project,if any, indicating the number of hours worked on the Project;and itemize any payments to vendors,consultants,or contractors with an explanation of the goods or services provided for the Project. 3) To keep necessary records of Project activities,expenses and charges to document and support invoices submitted to the Air District. 4) To allow and facilitate Air District audit of Project performance and all expenditures relating to the Project funded through this Agreement. TFCA Regional Fund Project 99R64 Page 1 BAAQMD FY99 TFCA Funding Agreement 5) To record on a time sheet those hourly labor costs incurred in the implementation of the Project which are paid with TFCA funds received under this Agreement,or to establish an alternative method approved by the Air District to document staff costs charged to the Project. 6) To use no more than five percent of the TFCA funds received under this Agreement for costs incurred in the administration of the Project consistent with the line item Project budget specified in Attachment A. 7) To keep necessary records of Project performance as specified on Attachment C. 8) To submit to the Air District all reports specified on Attachment C. 9) To use the Air District's approved logo for the Transportation Fund for Clean Air on any vehicles leased or purchased with TFCA funds,or on any other capital property purchased with TFCA funds that is visible to the public. 10) To use the Air District's approved logo for the Transportation Fund for Clean Air,or to acknowledge the Air District as a funding source,on any printed or electronic material for public distribution associated with the Project. Included as printed material are Project related schedules,brochures, handbooks,or promotional material.Included as electronic material are Project related Web Sites, electric signs,or e-mail broadcasts. 11) To acknowledge the Air District as a funding source for the Project in any related media events, articles,news releases or other publicity materials. 12) To assure that all funds received under this Agreement are expended only in accordance with all applicable provisions of law. 13) To expend those"Matching Funds,"if any,as listed on Attachment A,toward completion of the Project as described on Attachment B. In the event funding from other sources for the total cost of the Project as set forth in Attachment A is not received, in whole,by the Project Sponsor,the Air District reserves the right to renegotiate the terms and conditions of this Agreement. 14) To return to the Air District any funds realized from the sale of any motor vehicle(s)purchased with TFCA funds if such sale occurs within the industry standards for the useful life from the date of purchase of the motor vehicle(s). The amount of the funds returned to the Air District shall be proportional to the percentage of TFCA funds originally used to purchase the motor vehicle(s). 15) To place in the public domain any software,written document, intellectual property,process, technique,or product developed with TFCA funds as part of the Project. 16) -To comply with those"Special Conditions," if any, listed on Attachment A. SECTION III AIR DISTRICT AGREES: 1) To pay within 30 calendar days of receipt, invoices for reimbursement of legitimate Project expenses submitted by the Project Sponsor,excepting that the Air District will retain fifteen percent(15%)of the "Total TFCA Regional Funds Awarded"as listed on Attachment A until the Air District's acceptance of the final report as specified on Attachment C. 2) To provide TFCA funds not to exceed the"Total TFCA Regional Funds Awarded"amount for this Project as listed on Attachment A. 3) To provide timely notice prior to conducting an audit. 4) To provide a copy of any fiscal audits of the Project as specified in California Health and Safety Code Section 44242. TFCA Regional Fund Project 99R64 Page 2 BAAQMD FY99 TFCA Funding Agreement SECTION IV IT IS MUTUALLY AGREED: 1) Term: This Agreement will remain in effect for three(3)years after the completion of the Project unless terminated as provided below. 2) Termination: Either party may terminate this Agreement at any time by giving written notice of termination to the other party which shall specify the effective date thereof. Notice of termination under this paragraph shall be given at least ninety(90)days before the effective date of such termination. Upon receiving notice of termination,Project Sponsor shall immediately cease further expenditure of TFCA funds received under this Agreement.The Air District will reimburse Project Sponsor for qualifying expenditures on the Project made prior to the receipt of the notice of termination. 3) Indemnity: Project Sponsor shall indemnify and hold harmless the Air District its officers,employees, agents,representatives,and successors-in-interest against any and all claims,suits or actions resulting from the performance by Project Sponsor of its duties under this Agreement. Air District shall indemnify and hold harmless Project Sponsor its officers,employees,agents, and successors-in-interest against any and all claims,suits or actions resulting from the performance by Air District of its duties under this Agreement. 4) Notices: Any notice which may be required under this Agreement shall be in writing, shall be effective when received, and shall be given by personal delivery service or first class mail,to the addressees set forth on Attachment A,or to such addressees which may be specified in writing to the parties hereto. 5) Contacts: Project Sponsor and Air District persons to act as contacts and liaison with the Air District and the Project Sponsor with regards to the day-to-day activities of the Project are specified on Attachment A. All reports and correspondence are to be addressed to the"Contacts"listed on Attachment A. 6) Project Number: All correspondence shall reference the"Project Number"listed on Attachment A. 7) Additional Acts and Documents: Each party agrees to do all such things and take all such actions, and to make, execute and deliver such other documents and instruments, as shall be reasonably requested to carry out the provisions, intent and purpose of this Agreement. 8) Integration: This Agreement represents the entire Agreement of the parties with respect to the subject matter described in this Agreement,and no representation,warranties, inducements or oral agreements have been made by any of the parties except as expressly set forth herein, or in other contemporaneous written agreements. 9) Amendment: This Agreement may not be changed,modified or rescinded except in writing and signed by the parties hereto. Any attempt at oral modification of this Agreement shall be void and of no effect. The Air District contact person and Project Sponsor contact person identified pursuant to paragraph IV.5 above may jointly authorize, in writing,any schedule revisions,budget line item revisions,or changes to the Project scope of work that do not diminish the emission reductions associated with the Project. Any other amendments to this Agreement must be executed in writing by the signators to this Agreement. Any change in Project scope must be approved by the Air District prior to implementation of the change by the Project Sponsor. TFCA Regional Fund Project 99R64 Page 3 BAAQMD FY99 TFCA Funding Agreement 10) Independent Contractor: Project Sponsor renders its service under this Agreement as an independent contractor. None of the Project Sponsor's agents, subcontractors or employees shall be construed as agents or employees of the Air District. This paragraph does not apply to elected officials serving concurrently on the governing boards of both the Project Sponsor and Air District. 11) Assignment: This Agreement may not be assigned,transferred,hypothecated, subcontracted or pledged by any party without the express written consent of the other party. 12) Severability: Should any part of this Agreement be declared unconstitutional, invalid, or beyond the authority of either party to enter into or carry out, such decision shall not affect the validity of the remainder of this Agreement which shall continue in full force and effect;provided that,the remainder of this Agreement can,absent the invalid portion(s),reasonably be interpreted to give effect to the intentions of the parties. 13) Effective Date: The effective date of this Agreement is the date of signature by the Air Pollution Control Officer as listed on page 5. 14) Schedule for Eligible Costs: Only Project costs incurred after the"Air District Approval Date"listed on Attachment A,and before completion of Project and fulfillment of monitoring requirements or termination,whichever occurs first,are eligible to receive TFCA funds. 15) Cost Reduction: The Air District may reduce its contribution to the Project in the event that the"Total Project Cost"is less than the amount listed on Attachment A.Any reduction in TFCA funding shall be proportional to the percentage of TFCA funds provided toward the total project cost as noted on Attachment A. 16) Penalty: The Air District may decrease the total TFCA Regional Funds awarded for the Project by up to ten percent(10%)for failure of the Project Sponsor to comply with paragraphs 11.9,11.10,and II.11 above. 17) Project Cost: Project cost overruns are the sole responsibility of the Project Sponsor. The Air District's funding obligation is limited to the"Total TFCA Regional Funds Awarded"as listed on Attachment A. Acceptance of this funding agreement obligates the Project Sponsor to deliver the Project according to the terms and conditions of this Agreement. 18) Force Majeure: Neither the Air District nor Project Sponsor shall be liable or deemed to be in default for any delay or failure in performance under this Funding Agreement or interruption of services, directly or indirectly,from the acts of God,civil or military authority,acts of public enemy,war, strikes, labor disputes,shortages of suitable parts,materials, labor or transportation,or any similar cause beyond the reasonable control of the Air District or Project Sponsor. 19) Governing Law: This Funding Agreement shall be construed and interpreted and the legal relations created thereby shall be determined in accordance with the laws of the State of California. TFCA Regional Fund Project 99R64 Page 4 1 7 BAAQMD FY99 TFCA Funding Agreement SIGNATURES: by: by: Date: Dennis M.Barry,AICP Ellen Garvey Community Development Director Air Pollution Control Officer Contra Costa County Bay Area Air Quality Management District Approved as to legal form and content: by: by: Legal Counsel Robert N.Kwong Contra Costa County District Counsel Bay Area Air Quality Management District TFCA Regional Fund Project 99R64 Page 5 BAAQMD FY99 TFCA Funding Agreement ATTACHMENT A PROJECT SPECIFIC INFORMATION [Note: The section numbers shown in parenthesis below refer to Sections in the Funding Agreement.] 1. Project Sponsor: Contra Costa County-Community Development Department 2. Project Number: 99R64 3. Total TFCA Regional Funds Awarded (Section H1.2): $38,850 4. Total Project Cost(Section IV.15): $38,850 5. Matching Funds(Section U.13): $0 6. Total Line Item Project Budget: Line Item Amount Lease Payment Subsidy $38,400 Marketing $450 7. Invoice and Payment Schedule(Section H.2): The Project Sponsor will submit quarterly invoices for reimbursement within fifteen(15) calendar days after the close of a calendar quarter. Invoices shall specify the time period for the invoice, itemize staff charges to the Project, if any, indicating the number of hours worked on the project; and itemize any payments to vendors, consultants, or contractors with an explanation of the goods or services provided for the Project. Invoices are due: January 15,2000; April 15,2000; July 15,2000, October 15, 2000. The final invoice is to be submitted with the final report as listed on Attachment C. 8. Notices(Section IVA): Any written notice required is to be addressed to: Project Sponsor: Air District: Dennis M.Barry Ellen Garvey Community Development Director Air Pollution Control Officer Contra Costa County Bay Area Air Quality Management District 651 Pine St.,4th Fl.,North Wing 939 Ellis Street Martinez,CA 94553 San Francisco, CA 94109 9. Contacts (Section IV.5): Contact persons for day-to-day activities of the Project are: Project Contact: Air District: Steven Goetz Andrea Gordon Planner Environmental Planner Il Contra Costa County Bay Area Air Quality Management District 651 Pine St.,4th Fl.,North Wing 939 Ellis Street Martinez,CA 94553 San Francisco,CA 94109 10. Air District Approval Date(Section IV.14): October 6, 1999 11. Special Conditions(Section U.16): None TFCA Regional Fund Project 99R64 Page 6 BAAQMD FY99 TFCA Funding Agreement ATTACHMENT B PROJECT DESCRIPTION The TFCA funding application dated June 28 ,1999, is incorporated herein by this reference. Project Title: Ridesharing Vanpool Subsidy Project Description: Contra Costa County will provide the funding to the Contra Costa Center Association to subsidize the lease payments for five 8-passenger mini-vans and two 12-passenger club wagons(from Enterprise Leasing Company)for use as long-distance commuter vanpools for employees working at Contra Costa Center employment sites,as well as other nearby employment sites.Vanpools will serve the following areas: Solano County, Stockton and Eastern Contra Costa County. Project Schedule:. Project,Start Date: November 1, 1999 Project Completion Date: November 1,2000 Project Goal: The goal of the project is to reduce motor vehicle emissions by replacing large underutilized commute vans with smaller,more fuel efficient vehicles,and to increase the use of these vanpools by providing a rider subsidy which will make the vanpool commute cost more affordable to riders. TFCA Regional Fund Project 99R64 Page 7 BAAQMD FY99 TFCA Funding Agreement ATTACHMENT C MONITORING OF PROJECT PERFORMANCE Quarterly Reports: Quarterly Reports: Due Dates: January 15,2000;April 15,2000;July 15,2000,October 15,2000 Quarterly reports shall summarize progress in project implementation,the number of vanpools formed,the number of riders per vanpool,and the home origin of the vanpools. Project Monitoring Requirements and Final Report: Due Date: December 1,2000 The Final Report shall provide the following: I. Data summarizing the ridership and commute characteristics for each project vanpool, including: -origin and destination of each vanpool -number of riders per van -one-way daily commute distance -prior commute mode of the vanpool riders(before the vans were available) -means of access from home to vanpool(picked up at home, drive to pick-up spot,walk,etc.) -monthly rider fare 2. Copies of any promotional materials,press releases,newsletter articles,or other media coverage regarding the project. TFCA Regional Fund Project 99R64 Page 8 : Contra TO: REDEVELOPMENT AGENCY/BOARD OF SUPERVISOR Costa Y«nY FROM: Phil Batchelor, Executive Director °sr UK County Dennis M. Barry, AICP, Director of Community Development DATE: December 14, 1999 SUBJECT: Contra Costa County Technical Assistance Contract (CDD-TP) SPECIFIC REQUEST(S) OR RECOMMENDATIONS(S) & BACKGROUND AND JUSTIFICATION RECOMMENDATIONS AUTHORIZE the DEPUTY Director - Redevelopment, on behalf of the Contra Costa County Redevelopment Agency, to execute a Technical Assistance contract with Contra Costa County for Fiscal Year 1999-00 and AUTHORIZE the Director of Community Development or his designee, on behalf of Contra Costa County, to execute a Technical Assistance contract with the Contra Costa County Redevelopment Agency for Fiscal Year 1999-00. FISCAL IMPACT The Redevelopment Agency would use tax increment funds to make reimbursements to the County Community Development Department for transportation planning services rendered in conjunction with Redevelopment implementation. BACKGROUND/REASONS FOR RECOMMENDATIONS In implementing its five redevelopment programs, Agency staff from time to time requires the services of the County's Community Development Department's Transportation Planning Division to provide technical assistance and information. The work program is expected to be primarily related to the Pleasant Hill BART Station Specific Plan implementation, Bay Point- BART Specific Plan adoption as well as implementation activities in Oakley, North Richmond, and Rodeo. In order to reimburse the County Community Development Department for costs incurred, a contract not to exceed $25,000 is recommended for Fiscal Year 1999-00. CONTINUED ON ATTACHMENT: SIGNATURE: ti� 0.444-le 400 RECOMMENDATION OF EXECUTIVE DIRECTORECOMM NDATION OF GENCY COMMITTEE APPROVE OTHER SIGNATURE(S): ACTION OF AGENCY ON ))ecPrhbcr /L099 APPROVED AS RECOMMENDED ,Ix� __--- VOTE OF COMMISSIONERS I HEREBY CERTIFY THAT THIS IS A �C UNANIMOUS (ABSENT ) TRUE AND CORRECT COPY OF AN AYES: NOES: ACTION TAKEN AND ENTERED ON THE ABSENT: ABSTAIN: MINUTES OF THE REDEVELOPMENT AGENCY ON THE DATE SHOWN. Contact: Jim Kennedy 335-1255 ATTESTED J, elf e" bc-r 1q, j99 cc: County Administrator PHIL BATCHELOR County Counsel AGENCY SECRETARY Community Development Redevelopment Agency BY) "- Mae..tle.,_, , DEPUTY 1-1:\Bdordrs\l 2 l 49CC DTP.doc ' TO: Board of Supervisors Contra FROM: Dennis M. Barry, AICP Costa Community Development Director County DATE: December 14, 1999 SUBJECT: Pleasant Hill BART Station Feeder Bus/Shuttle Project SPECIFIC REQUEST(S) OR RECOMMENDATION(S) & BACKGROUND AND JUSTIFICATION RECOMMENDATIONS 1. Authorize the Community Development Director to apply for a Transportation Fund for Clean Air (TFCA) Program grant from the Contra Costa Transportation Authority for the Pleasant Hill BART Station Feeder Bus/Shuttle (Shuttle) Project; 2. Direct the Community Development Director to work with the Central Contra Costa Transit Authority (CCCTA) to operate the Shuttle in a manner that complements existing CCCTA service while serving BART patrons affected by the closure of the temporary park-and-ride lot located adjacent to the Pleasant Hill BART Station; 3. Authorize the Chair of the Board of Supervisors to request CCCTA to seek up to $20,720 in Unallocated Measure C-88 Bus Transit Improvement and Coordination Program Funds from the Contra Costa Transportation Authority to supplement the TFCA grant and, if feasible, to enable the Shuttle to operate free to the public; and 4. Authorize the Chair of the Board of Supervisors to request the support of BART and the Contra Costa Centre Association for the Shuttle project. CONTINUED ON ATTACHMENT: X YES SIGNATURE A p4z�� ACTION OF BOARD ON �c_evv, be r 019 APPROVED AS RECOMMENDED X OTHER VOTE OF SUPERVISORS 1 HEREBY CERTIFY THAT THIS IS A TRUE AND UNANIMOUS (ABSENT CORRECT COPY OF AN ACTION TAKEN AND AYES: NOES: ENTERED ON THE MINUTES OF THE BOARD OF ABSENT: ABSTAIN: SUPERVISORS ON THE DATE SHOWN. Contact: Steven Goetz(925/335-1240) ATTESTED J (e k� 6-o Y- l y, C % 9 Cj cc: Community Development Department (CDD) PHIL BATCHELOR, CLERK OF THE Rick Ramacier, CCCTA (via CDD) BOARD OF SUPERVISORS AND COUNTY ADMINISTRATOR DMB\:gs\slg \bo\shuttle.bo.doc BY) ", , DEPUTY Pleasant Hill BAR T Station Feeder Bus/Shuttle Project December 14, 1999 Page 2 FISCAL IMPACT None to the General Fund. The annual cost of the Shuttle is $90,720. A TFCA grant, would provide $70,000. A Measure C-88 grant of up to $20,720, would fully fund the shuttle and eliminate the need to charge fares. Charging the existing CCCTA fare would generate an estimated $13,600 in fare revenues. If grant funds are not approved and received, the project will not be implemented. BACKGROUND/REASONS FOR RECOMMENDATIONS In 1998, the County amended the Pleasant Hill BART Station Area Specific Plan to encourage the use of alternative modes of transportation to the area in lieu of further expansion in road capacity. County staff has been working with other agencies to develop projects and programs that implement this policy. The objective of the project is to demonstrate if shuttle service can serve a significant number of BART patrons and reduce the need to drive to the BART station. There is a desire to implement this service as soon as possible given the closure of the temporary park-and-ride lot adjacent to the Pleasant Hill BART Station. On October 13, 1999, the Pleasant Hill BART Station Area Steering Committee endorsed implementation of the Shuttle project. On October 14, 1999, TRANSPAC, the regional transportation planning committee for Central County, voted to support and continue investigation of the Shuttle. Support from BART and the Contra Costa Centre Association would also benefit the project. A grant application and project description has been prepared in cooperation with CCCTA, (see Exhibit A). The project, as proposed, would provide weekday, peak period shuttle service using two vans in neighborhoods with a significant number of BART patrons who are not well-served by existing CCCTA service. The grant request proposes to charge the CCCTA fare of $1.25, but free operation of the service would be preferred. The final design of the service would be subject to the findings of an evaluation of existing feeder bus service to the BART station, which CCCTA has underway. CCCTA staff has indicated it can design the service, provide vehicles and operate the service, if funding is provided to CCCTA. The request for TFCA and Measure C-88 grant funds, if approved, would provide the revenues that CCCTA needs to operate the service for a one- year period. • EXHIBIT A TRANSPORTATION FUND FOR CLEAN AIR CONTRA COSTA PROGRAM MANAGER (40%) APPLICATION/PR FY 2000-2001 SUMMARY INFORMATION 1. Project Sponsor (Agency): Application Date: Project Manager: E-mail: S9[)e..-f, (a)-tyaww 2k4s-2 � '?i "iz , ct'nlk . ca us .*01 0- Win Phone No., pvtCal- Street Address: 6& c,-*- 4'0krI. N (i?,,�;) 3 3 S I 240 City/State/Zip: A FA 44o- &A-)Cb T1, eqe I C qq-SG3-&cq< 2. Name/Title of person with authorization to sign the Co-op Agreement with OCTA: e 5+eVe 6v�z-,- 3. Type of Project: (See Attachment A for project list.) -elo 5kWWJ FeeAey-13 Lk;5 +,� qusj� T'4_11 I f�A� 4. Project Name: * P)akscf � l 3 Few bvs 5. Project Budget: TFCA 40% Program Manager funds (this application) $ 761 Mt ju, (applied for thretigh BAAEWD) rgr� $ T-F-GA 68% Regierrmt f a i wl--- Other(list each additional funding source) 9)7'4W $ Total: $ PROJECT INFORMATION (PLEASE ATTACH) 6. Project Description: a. A summary statement, which includes a description of the project scope and goal(s), and details what the funds will be expended on. b. Any additional project attributes that you would like to have considered when this project is evaluated. (See the REFERENCE GUIDE for information on allocation criteria.) c. The correct supplemental form, as indicated in Attachment A, containing required information for your specific project type. (This information will be used in part to evaluate the cost effectiveness of the project. Please refer to Attachment B for additional information on cost effectiveness calculations.) 7. Itemized Annual Project Budget: (Please complete attached spreadsheet.) 8. Project Schedule: Start Date (mo/yr) JUI,4ZbOd Completion Date: (mo/yr) JVt,N,. ZDa 9. Milestone Schedule: (Report on milestones will be submitted with "Timely Use of Funds"surveys, and/or quarterly invoices.) Date (mo/yr) Milestone Description 10. Describe Project Monitoring: (Please refer to Attachment C for project monitoring requirements.) . A ��AGY5 , r e,� ,I, , h ours, ` 11. Is this project supportive of the Action Plan goals for the subarea in which you are submitting this application? Ayes ❑No Explain. 12. Does this project serve a disadvantaged community? (Defined in Attachment D.) OYes XNo If yes, please attach documentation. SUMMARY INFORMATION PAGE 2 U) 0. M (ID 0 0 0 0 -10 owA q- p G CD o 0 71 0 rn LC) LO - 0rno 0 5 ' CD I-ql CD CD CDto CD to (D 0 CD --A U,,) -o -)3 ::Ir 0 e-:r. CD CD CD N rn CD -- -3 0 CD loo o" CD C-- CD (n U) CD C) 0 is CD (D CD C. 0 C 0 - C7- :3 M M 0 CD CD (r) 18 (D CD cr) W00 0 0 IhA 0 (D CD CD QCs- pq ' C: CD CD C-) --% W CD 0 CD cr CD (D (D P CD CD CD C: CD CL c ,,,� �1J `''� O (0 CA cD (D CD FORM B-2 TRIP REDUCTION PROJECTS Shuttle/Feeder Bus, Rail Integration, and Transit Information Systems Reduction/Transit Incentive Campaigns, Other Rideshare 1. Project Sponsor: Cr7l"ir,�L CP51�., 2. Project Title:Bu.,C2Qz� 3. Project Cost Information: TFCA (40% and 60%) Total: $ '70 Total Project Cost: $ q D 2AD 4. Project Sponsor Contact: Name: Phone:6 2's :;�35J 12,+D 5. Number of one-way trips per day to be eliminated.(Explain below) 10 trips/day 6. Average number of days per year that trips will be reduced? 2SZ days/yr 7. What will be the average one-way trip length of the eliminated trips? �� miles 8. How many new vehicle trips per day will be generated by the project? O trips/day (e.g. auto trips to transit stations or Park and Ride Lots.) 9. What will be the average length of the new vehicle trips to transit station miles or Park and Ride Lot? 10. Elaborate on any of the assumptions used to obtain the responses to questions 5—9 above or any areas where you believe the cost effectiveness calculation should use assumptions that are different from the Air District's default assumptions. 6ee, aAvuAl- eA o(e��- ruyll� ATTACHMENT A PAGE 5 FORM B-2(CONTINUED) For Shuttle/Feeder Bus Projects & Vanpools: 1. Is this a new service? X Existing service? ❑ Modification to existing service? ❑ 2. Does the shuttle/feeder bus providing the service meet the ADA vehicle standards for wheelchair accessibility? �es ❑No. 3. Is there comparable paratransit service provided to eligible persons with disabilities? XYes ❑No. 4. For each vehicle: Gross Model Fuel type Passenger One-way Avg. one- Days/yr of Hours of Frequency vehicle year capacity Trips per way trip service operation of service weight day length $moo lbs. (q q 5. Elaborate on any of the assumptions used to obtain the response(s) to question 4 above or any areas where you believe the cost effectiveness calculation should use assumptions that are different from the Air District's default assumptions. Shuttle/Feeder bus projects, please provide the following additional documentation: ■ Map showing shuttle/feeder bus route and stops. Indicate major employment sites to be served. ■ Identify rail or ferry stations to be served. Include the proposed shuttle/feeder bus schedule showing timed connections with arriving or departing train or ferry. ■ For existing shuttle/feeder bus service, attach data showing ridership for the past 3 years. ■ For new or modified service, attach documentation to support estimates for projected number of users (e.g. survey data from local worksites) • Shuttle/feeder bus projects that are not sponsored by a transit agency must document that the shuttle/feeder bus service does not duplicate existing transit agency revenue service, and that the shuttle/feeder bus service has been coordinated with all potentially affected transit agencies. ATTACHMENT A PAGE 6 Pleasant Hill BART Feeder Bus Description: The Pleasant Hill BART Feeder Bus has been designed in coordination with the Central Contra Costa Transit Authority (CCCTA) and BART. The service is targeted to serve BART patrons who drive to the Pleasant Hill BART station in the morning and originate from destinations beyond walking distance of a CCCTA bus stop. In addition, this service has been developed to mitigate the loss of 610 parking spaces at the Pleasant Hill station. Data about Pleasant Hill BART riders was collected in a recent BART station access survey. Patrons entering the BART station were surveyed and the dots shown on the attached map indicate the origins of Pleasant Hill BART A.M. peak riders that drive to the station. The map displays the location of current transit routes in blue. Two zones with significant BART patrons have been targeted for feeder bus service. • Zone 1: South of Treat Blvd., East of Oak Grove North of Ygnacio Valley, and west of Clayton Rd. • Zone 2: west of 680, south of Taylor Rd., North of Geary Rd. and East of Taylor There are approximately 280 BART patrons who drive to the station that live in zone 1 and 230 patrons who drive alone that live in zone 2 for a target population of 510 BART patrons. It is estimated that the shuttle service designed will attract 8 passengers per revenue hour, which equals 48 individuals a day (assuming each individual makes two trips a day). This patronage level translates into an assumption that 9.5% of the target market will be attracted to this new service. To determine the trip length for the purpose of determining the amount of pollutants removed takes into consideration the shuttle portion of the trip from home to the Pleasant Hill BART station and the BART trip to the final destination. Thus the total transit trip length is equal to the drive alone trip length from home to work. The drive alone trip length from home to the BART station in the morning was 3.82 miles based upon BART survey data. The average trip length for passengers exiting at the PHill BART station was 22.1 miles. This totals 25.92 or 26 miles for each one way trip removed. Subscription service would be operated using two buses (one for each zone) in the A.M. and P.M. peak period. Riders would call to request a pick-up time and location then the bus would routinely take them from their home (or other location) to the BART station and back. Only changes would require a phone call. 1999 TFCA Grant Application Pleasant Hill BART Feeder Bus Based upon the location of demand within each zone, a regular route would be established. An assumption of 8 passengers per hour has been used to calculate total ridership as the productivity of this service will be lower than most fixed route service and higher than dial a ride service. Marketing Although the cost estimate does not include an amount for marketing, information about the service will be distributed in coordination with other commute alternatives. Some of the avenues available include the following: • Coordinate with the Commute Alternatives Network. The purpose being to market commute alternatives to employers proximate to BART stations that employ Pleasant Hill residents. • List service on TRAK website. • Include on CCCTA system map and timetables • Place articles in BART riders newsletter Budget The CCCTA has agreed to operate the service after full funding has been obtained. They plan on using the Link contractor and thus the contract cost per hour of$30.00. A three-hour morning and evening peak operation for each bus (2 buses total) that operates five days a week translates into 3,024 revenue hours per year. This multiplied by the cost per hour equals $90,720 for the annual operating cost. If a farebox ratio of 15% is assumed then fares will equal $13,608 leaving the need for $61,986 in subsidy. Because of the $50,000 per ton limit on TFCA funding this grant application is for $70,000. The remainder will be obtained from other sources. Vehicles The service will be operated with vehicles already owned by the CCCTA. The vehicles are new Ford 8,500 lb. GVWR "cut-aways" that meet ADA requirements. They are gasoline powered and carry up to 12 ambulatory passengers and have two wheelchair positions. 1999 TFCA Grant Application Pleasant Hill BART Feeder Bus Nor •.. r. •w $ *\ 0 000 4-1 •• • w • � •1► � t 90 0 Ole • N • • , • •' 00 • •� �k • •• • • • Ww 00 aw M • 'S�:• • �• •• • • • •• • • • t • • �• OP* a r 00 +t • t'• • 44 of , • ,► IN 40 a • , • • • I• ".• • • t • • • i •ri I• • f • �• • • „tt♦,� ♦u • r • • • C. • • , • r, .. .. . 00 ot,• • i • •• •00 S• s••• • ot a • i • 0000 • • 40 • • • 000 r • , _. • • + t • to so 00 •r • r' 4 . • • t Z, • 4 • • •••t• • ••,•. • • f • • • • '� • • r• • as • •• . , • • • .�• •: • • • •. w • • • ,� • • • , • + •• +f f , ,,. • 0j • • • 00, • .air' '' '\ • t • • •' ♦' • •` .,r• , • , • ♦ • • • • • • 00 • • , • • rr •, r • • 0 �i , � ., _ .. Contra TO: REDEVELOPMENT AGENCY/BOARD OF SUPERVISOR Costa .✓•..v 000 . .g �{}�T FROM: Phil Batchelor, Executive Director U County Dennis M. Barry, AICP, Director of Community Development DATE: December 14, 1999 , SUBJECT: Contra Costa County Technical Assistance Contract (CDD-TP) SPECIFIC REQUEST(S) OR RECOMMENDATIONS(S) & BACKGROUND AND JUSTIFICATION RECOMMENDATIONS AUTHORIZE the DEPUTY Director - Redevelopment, on behalf of the Contra Costa County Redevelopment Agency, to execute a Technical Assistance contract with Contra Costa County for Fiscal Year 1999-00 and AUTHORIZE the Director of Community Development or his designee, on behalf of Contra Costa County, to execute a Technical Assistance contract with the Contra Costa County Redevelopment Agency for Fiscal Year 1999-00. FISCAL IMPACT The Redevelopment Agency would use tax increment funds to make reimbursements to the County Community Development Department for transportation planning services rendered in conjunction with Redevelopment implementation. BACKGROUND/REASONS FOR RECOMMENDATIONS In implementing its five redevelopment programs, Agency staff from time to time requires the services of the County's Community Development Department's Transportation Planning Division to provide technical assistance and information. The work program is expected to be primarily related to the Pleasant Hill BART Station Specific Plan implementation, Bay Point- BART Specific Plan adoption as well as implementation activities in Oakley, North Richmond, and Rodeo. In order to reimburse the County Community Development Department for costs incurred, a contract not to exceed $25,000 is recommended for Fiscal Year 1999-00. CONTINUED ON ATTACHMENT: SIGNATURE: O ma.. �C F 41 ,e, RECOMMENDATION OF EXECUTIVE DIRECTORECOMM NDATION OF GENCY COMMITTEE APPROVE OTHER SIGNATURE(S): ACTION OF AGENCY ON ,beeee"J,,ct- /q,/99 APPROVED AS RECOMMENDED,X_,___ VOTE OF COMMISSIONERS I HEREBY CERTIFY THAT THIS IS A UNANIMOUS (ABSENT ) TRUE AND CORRECT COPY OF AN AYES: NOES: ACTION TAKEN AND ENTERED ON THE ABSENT: ABSTAIN: MINUTES OF THE REDEVELOPMENT AGENCY ON THE DATE SHOWN. Contact: Jim Kennedy 335-1255 ATTESTED k" brr l qr 1 cc: County Administrator PHIL BATCHELOR County Counsel AGENCY SECRETARY Community Development Redevelopment Agency BY) "- DEPUTY 11:\Bdordrs112149CC IT.doc TO: Board of Supervisors ` Contra FROM: Dennis M. Barry, AICP Costa Community Development Director County DATE: December 14, 1999 SUBJECT: Pleasant Hill BART Station Feeder Bus/Shuttle Project SPECIFIC REQUEST(S) OR RECOMMENDATION(S) & BACKGROUND AND JUSTIFICATION RECOMMENDATIONS 1. Authorize the Community Development Director to apply for a Transportation Fund for Clean Air (TFCA) Program grant from the Contra Costa Transportation Authority for the Pleasant Hill BART Station Feeder Bus/Shuttle (Shuttle) Project; 2. Direct the Community Development Director to work with the Central Contra Costa Transit Authority (CCCTA) to operate the Shuttle in a manner that complements existing CCCTA service while serving BART patrons affected by the closure of the temporary park-and-ride lot located adjacent to the Pleasant Hill BART Station; 3. Authorize the Chair of the Board of Supervisors to request CCCTA to seek up to $20,720 in Unallocated Measure C-88 Bus Transit Improvement and Coordination Program Funds from the Contra Costa Transportation Authority to supplement the TFCA grant and, if feasible, to enable the Shuttle to operate free to the public; and 4. Authorize the Chair of the Board of Supervisors to request the support of BART and the Contra Costa Centre Association for the Shuttle project. CONTINUED ON ATTACHMENT: X YES SIGNATURE la�4.L ACTION OF BOARD ON q, 19 9 9 APPROVED AS RECOMMENDED OTHER VOTE OF SUPERVISORS I HEREBY CERTIFY THAT THIS IS A TRUE AND UNANIMOUS (ABSENT CORRECT COPY OF AN ACTION TAKEN AND AYES: NOES: ENTERED ON THE MINUTES OF THE BOARD OF ABSENT: ABSTAIN: SUPERVISORS ON THE DATE SHOWN. Contact: Steven Goetz(925/335-1240) ATTESTED b 0(-e ki-1 6,- k- /�/I l 9 9 'c/ cc: Community Development Department (CDD) PHIL BATCHELOR, CLERK OF THE Rick Ramacier, CCCTA (via CDD) BOARD OF SUPERVISORS AND COUNTY ADMINISTRATOR DMB\:gs\slg \bo\shutde.bo.doc BY) " DEPUTY Pleasant Hill BART Station Feeder Bus/Shuttle Project December 14, 1999 Page 2 FISCAL IMPACT None to the General Fund. The annual cost of the Shuttle is $90,720. A TFCA grant, would provide $70,000. A Measure C-88 grant of up to $20,720, would fully fund the shuttle and eliminate the need to charge fares. Charging the existing CCCTA fare would generate an estimated $13,600 in fare revenues. If grant funds are not approved and received, the project will not be implemented. BACKGROUND/REASONS FOR RECOMMENDATIONS In 1998, the County amended the Pleasant Hill BART Station Area Specific Plan to encourage the use of alternative modes of transportation to the area in lieu of further expansion in road capacity. County staff has been working with other agencies to develop projects and programs that implement this policy. The objective of the project is to demonstrate if shuttle service can serve a significant number of BART patrons and reduce the need to drive to the BART station. There is a desire to implement this service as soon as possible given the closure of the temporary park-and-ride lot adjacent to the Pleasant Hill BART Station. On October 13, 1999, the Pleasant Hill BART Station Area Steering Committee endorsed implementation of the Shuttle project. On October 14, 1999, TRANSPAC, the regional transportation planning committee for Central County, voted to support and continue investigation of the Shuttle. Support from BART and the Contra Costa Centre Association would also benefit the project. A grant application and project description has been prepared in cooperation with CCCTA, (see Exhibit A). The project, as proposed, would provide weekday, peak period shuttle service using two vans in neighborhoods with a significant number of BART patrons who are not well-served by existing CCCTA service. The grant request proposes to charge the CCCTA fare of $1.25, but free operation of the service would be preferred. The final design of the service would be subject to the findings of an evaluation of existing feeder bus service to the BART station, which CCCTA has underway. CCCTA staff has indicated it can design the service, provide vehicles and operate the service, if funding is provided to CCCTA. The request for TFCA and Measure C-88 grant funds, if approved, would provide the revenues that CCCTA needs to operate the service for a one- year period. lip TRANSPORTATION FUND FOR CLEAN AIR EXHIBIT A CONTRA COSTA PROGRAM MANAGER (40%) APPLICATION/PR FY 2000-2001 SUMMARY INFORMATION 1. Project Sponsor(Agency): G9VV Application Date: 2-An.p_ ProjectManager: E-mail: 5!1r)a(o iyanspn:1,6Z - ca us fk Street Address: �•'rll VO• Phone No• . vvtylAo_ cos- City/State/Zip: Irl eqe CA q+S53.-&C FAX-I, 2. Name/Title of person with authorization to sign the Co-op Agreement with OCTA: -a 5+we.,610e,-z,- 3. Type of Project: (See Attachment A for project list.) .e/ kwwi - -' Fee-Aer 13mu.6 +2� q4Asa,.,� T'TU1 4. Project Name: 0 P)0.<�f �U1 3°k-l- F4W &5 5. Project Budget: TFCA 40% Program Manager funds (this application) $ 7b1 Nt T-F-GA 685b Regieml fand'D (applied for thredgh BAAeMD) Fxre-5 $ 13-I Other (list each additional funding source) O-M-W $ 71 Total: $ / z PROJECT INFORMATION (PLEASE ATTACH) 6. Project Description: a. A summary statement, which includes a description of the project scope and goal(s), and details what the funds will be expended on. b. Any additional project attributes that you would like to have considered when this project is evaluated. (See the REFERENCE GUIDE for information on allocation criteria.) c. The correct supplemental form, as indicated in Attachment A, containing required information for your specific project type. (This information will be used in part to evaluate the cost effectiveness of the project. Please refer to Attachment B for additional information on cost effectiveness calculations.) 7. Itemized Annual Project Budget: (Please complete attached spreadsheet.) toll& 8. Project Schedule: Start Date (mo/yr) '114 Completion Date: (mo/yr) 9. Milestone Schedule: (Report on milestones will be submitted with 'Timely Use of Funds"surveys, and/or quarterly invoices.) Date (mo/yr) Milestone Description 0 10. Describe Project Monitoring: (Please refer to Attachment C for project monitoring requirements.) 0 `' v-kdeX f 0 / ..I �* na L 11. Is this project supportive of the Action Plan goals for the subarea in which you are submitting this application? {Yes ONO Explain. 0 12. Does this project serve a disadvantaged community? (Defined in Attachment D.) E]Yes A"-J-N'o If yes, please attach documentation. SUMMARY INFORMATION PAGE 2 67 n 0 t-N 0 0 0 0 0 CP 0 CD rn 0 P r-41 --% M (D CD (D -4 CD i . CD -_-r CDto to CD CD Z CD CD �6 0 CD 0 f-41 o - CD o Z CD CD CD0 C:) CD - 3 lo 0 cr 0, CD SID G) 0 CD 0 Z !:Vp 0 CD CD W >4 CD C' 0 0 0 mN � > (ID (D CD C11) 0- 5 - %- -P (1) C: CD Lo 0 0 to rn U) CD CD 0 0 tZ, CD CD (D C3 C5, CD CD Lo CD CD CD- CD b d C: � °��1 � Q c civ `� CD C: CD CD 0 cin CZ) 0 CD 0- 0 , %".. 0 CL T, to CD CD F'dRM B-2 TRIP REDUCTION PROJECTS Shuttle/Feeder Bus, Rail Integration, and Transit Information Systems Reduction/Transit Incentive Campaigns, Other Rideshare 1. Project Sponsor: CCP_57� 2. Project Title: OT6 3. Project Cost Information: TFCA (40% and 60%) Total: $ ��� fl751� Total Project Cost: $T? 4. Project Sponsor Contact: Name: 7i I'h�ne: ?.�S J 1 2'-D 5. Number of one-way trips per day to be eliminated.(Explain below) /6 trips/day 6. Average number of days per year that trips will be reduced? 2571 days/yr 7. What will be the average one-way trip length of the eliminated trips? miles 8. How many new vehicle trips per day will be generated by the project? D trips/day (e.g. auto trips to transit stations or Park and Ride Lots.) 9. What will be the average length of the new vehicle trips to transit station miles or Park and Ride Lot? 10. Elaborate on any of the assumptions used to obtain the responses to questions 5 —9 above or any areas where you believe the cost effectiveness calculation should use assumptions that are different from the Air District's default assumptions. ATTACHMENT A PAGE 5 FORM B-2 CONTINUED For Shuttle/Feeder Bus Projects & Vanpools: 1. Is this a new service? X Existing service? ❑ Modification to existing service? ❑ 2. Does the shuttle/feeder bus providing the service meet the ADA vehicle standards for wheelchair accessibility? Wes ❑No. 3. Is there comparable paratransit service provided to eligible persons with disabilities? Xyes ❑No. 4. For each vehicle: Gross Model Fuel type Passenger One-way Avg. one- Days/yr of Hours of Frequency vehicle year capacity Trips per way trip service operation of service weight day length `W lbs. Mq GIA6 11- fAlcllbl (0 iiw1C5 ;�02-- �m 5�,bscx-j 5. Elaborate on any of the assumptions used to obtain the response(s) to question 4 above or any areas where you believe the cost effectiveness calculation should use assumptions that are different from the Air District's default assumptions. Shuttle/Feeder bus projects, please provide the following additional documentation: • Map showing shuttle/feeder bus route and stops. Indicate major employment sites to be served. ■ Identify rail or ferry stations to be served. Include the proposed shuttle/feeder bus schedule showing timed connections with arriving or departing train or ferry. ■ For existing shuttle/feeder bus service, attach data showing ridership for the past 3 years. ■ For new or modified service, attach documentation to support estimates for projected number of users (e.g. survey data from local worksites) • Shuttle/feeder bus projects that are not sponsored by a transit agency must document that the shuttle/feeder bus service does not duplicate existing transit agency revenue service, and that the shuttle/feeder bus service has been coordinated with all potentially affected transit agencies. ATTACHMENT A PAGE 6 Pleasant Hill BART Feeder Bus Description: The Pleasant Hill BART Feeder Bus has been designed in coordination with the Central Contra Costa Transit Authority (CCCTA) and BART. The service is targeted to serve BART patrons who drive to the Pleasant Hill BART station in the morning and originate from destinations beyond walking distance of a CCCTA bus stop. In addition, this service has been developed to mitigate the loss of 610 parking spaces at the Pleasant Hill station. Data about Pleasant Hill BART riders was collected in a recent BART station access survey. Patrons entering the BART station were surveyed and the dots shown on the attached map indicate the origins of Pleasant Hill BART A.M. peak riders that drive to the station. The map displays the location of current transit routes in blue. Two zones with significant BART patrons have been targeted for feeder bus service. • Zone 1: South of Treat Blvd., East of Oak Grove North of Ygnacio Valley, and west of Clayton Rd. • Zone 2: west of 680, south of Taylor Rd., North of Geary Rd. and East of Taylor There are approximately 280 BART patrons who drive to the station that live in zone 1 and 230 patrons who drive alone that live in zone 2 for a target population of 510 BART patrons. It is estimated that the shuttle service designed will attract 8 passengers per revenue hour, which equals 48 individuals a day (assuming each individual makes two trips a day). This patronage level translates into an assumption that 9.5% of the target market will be attracted to this new service. To determine the trip length for the purpose of determining the amount of pollutants removed takes into consideration the shuttle portion of the trip from home to the Pleasant Hill BART station and the BART trip to the final destination. Thus the total transit trip length is equal to the drive alone trip length from home to work. The drive alone trip length from home to the BART station in the morning was 3.82 miles based upon BART survey data. The average trip length for passengers exiting at the PHill BART station was 22.1 miles. This totals 25.92 or 26 miles for each one way trip removed. Subscription service would be operated using two buses (one for each zone) in the A.M. and P.M. peak period. Riders would call to request a pick-up time and location then the bus would routinely take them from their home (or other location) to the BART station and back. Only changes would require a phone call. 1999 TFCA Grant Application Pleasant Hill BART Feeder Bus Based upon the location of demand within each zone, a regular route would be established. An assumption of 8 passengers per hour has been used to calculate total ridership as the productivity of this service will be lower than most fixed route service and higher than dial a ride service. Marketing Although the cost estimate does not include an amount for marketing, information about the service will be distributed in coordination with other commute alternatives. Some of the avenues available include the following: • Coordinate with the Commute Alternatives Network. The purpose being to market commute alternatives to employers proximate to BART stations that employ Pleasant Hill residents. • List service on TRAK website. • Include on CCCTA system map and timetables • Place articles in BART riders newsletter Budget The CCCTA has agreed to operate the service after full funding has been obtained. They plan on using the Link contractor and thus the contract cost per hour of$30.00. A three-hour morning and evening peak operation for each bus (2 buses total) that operates five days a week translates into 3,024 revenue hours per year. This multiplied by the cost per hour equals $90,720 for the annual operating cost. If a farebox ratio of 15% is assumed then fares will equal $13,608 leaving the need for$61,986 in subsidy. Because of the $50,000 per ton limit on TFCA funding this grant application is for $70,000. The remainder will be obtained from other sources. Vehicles The service will be operated with vehicles already owned by the CCCTA. The vehicles are new Ford 8,500 lb. GVWR "cut-aways" that meet ADA requirements. They are gasoline powered and carry up to 12 ambulatory passengers and have two wheelchair positions. 1999 TFCA Grant Application Pleasant Hill BART Feeder Bus • • » ., ••# �� til •• go t + #• ♦, •• •• i • ti • ,tet •• �v�+ ••• r• ♦ • •• •• • • • 00.0 y• go. .� J^ • # • • # • '• ti•• •r • t , • • • •. • • 1 • •• 0. ♦ • • + • •♦• • • • • ; , • • 01 • • + SO 10 • M+ • r• s • �1 • • •# .. • • , • ��•♦ r •• •• r'�' # ••i w! yi' • •• ,••♦• •, }_. a • •b • f • • 00 go • i • • , r i 10, dr 0 • •i, • • • • ''r• • • •y•L' •. .. l ♦; • • , w • • • • ,•• i • •i " , • g. ♦ •.� ♦ .• J I r • , • +• • •♦ : �• ' • • 7 • • J` # s •• • •• i•• • to • #` # • • • • • J ! '' , w "`'••4 i s if ...<fw'�, • • • , • " • viii,"• • ♦ ,/ • • • • ,• • • • i • • • ` • " • ,, l J. • • • • ` •-•'• • ' �!' • ' J` • ` • ' • ' • i • •• • • • ! • U - • • # • # 000 0 8 00 00 • •• • 14l �y • • M�I • 1h ,.�• • I* • ♦. ;:.% '. ♦ i ! • J • • ♦ 49 • • t • • • ! • 1 • # • •i • #+ • • • ♦• . #• .. • �• Z ' ' +M . • 0 so • • • . • • • • •0 s s 6 •# • •