HomeMy WebLinkAboutMINUTES - 10271998 - C16-C21 TL,_ BOARD OF SUPERVISORS FROM: J. MICHAEL WALFORD, PUBLIC WORKS DIRECTOR ,r i DATE: October 27, 1998 SUBJECT: Determine that the contractor, Tank Protect Engineering, failed to comply with the Public Contract Code and Assess a penalty of $870.00 for the Byron Airport Aviation Fueling System Project, Project No. 4878-6X5328-95, Byron area. Specific Request(s)or Recommendations)&Background&Justification RECOMMENDED ACTION: DETERMINE that Tank Protect Engineering (contractor) failed to comply with applicable statutes pertaining to the substitution of a subcontractor (Thunder Electric) and ASSESS a penalty of $870.00 (10% of the amount of the subcontract) pursuant to Public Contract Code Section 4110. DIRECT the County Auditor-Controller to withhold the penalty from the final payment to the contractor. DIRECT the Public Works Director or his designee to submit a written compiapt to thexContractors State License Board. Continued on attachment: X yes SIGNATURE: ` �^-�'� ,r�.�.�b.~ '1 RECOMMENDATION OF COUNTY ADMINISTRATOR _RECOMMENDATION OF BOARD COMMITTEE APPROVE OTHER: SIGNATUR,E($): ACTION OF BOARD ON: Cit. 27.27. 199eA PPROVED AS RECOMMENDED X OTHER VOTE OF SUPERVISORS X UNANIMOUS (ABSENT_) AYES: NOES: ABSENT: ABSTAIN: Contact: Joseph P. Murphy, (925)313-2321 Orig.Div.: PW-Const. cc: County Administration Auditor-Controller Public Works; -Accounting I hereby certify that this Is a true and correct -Construction,R.Bruno copy of an action taken and entered on the -Design minutes of the Board of Supervisors on the S.B.E.- -Trans.Eng. Clete shown. 703 Market St. d 1 �,L�i 19 q San Francisco,CA 94103-1000 ATTESTED: Contractor PHIL BATCHELOR, Clerk of the Board RS:tt 0 Supervisors and County Administrator G:\GrpData\Const\BO\BAA-27-t10.doe By± aac,�, Deputy Prc.-ect Name: Byron Airport Aviation Fueling System Pirojetrt No. 41173,6X5328-95 Board Date: October 27, 1998 Page 2 of 2 REASONS FOR RECOMMENDATION/BACKGROUND: Tank Protect Engineering submitted a bid proposal on September 24, 1996, for the construction of an aviation refueling facility at the Byron Airport. In its bid, Tank Protect listed Thunder Electric as a WBE subcontractor, with the dollar value of the subcontract being $8,700.00. On October 15, 1996, the Beard of Supervisors awarded the contract to Tank Protect. The contract work has been completed, and the project was accepted by the Board on July 28, 1998. On September 17, 1998, Tank Protect advised the Public Works Department that Thunder Electric had not been used on the project and that the electrical work in question had been performed by Tank Protect. Public Contract Code Section 4107 provides for the substitution of subcontractors only for certain specified grounds and only with the prior, written consent of the awarding authority or its designated officer. For violations of those provisions, Section 4110 provides for the assessment of a penalty of not more than ten percent of the amount of the subcontract involved. In addition, Section 4110 provides that violators are subject to discipline by the Contractors State License Board. It is recommended that the Board assess a penalty of $870.00, which is ten percent of the involved subcontract. It also is recommended that the County submit a written complaint to the Contractors State License Board'. Tank Protect has been notified of these recommendations and afforded an opportunity to address the Board. FINANCIAL IMPACT: NONE. TO: BOARD OF SUPERVISORS AS THE BOARD OF DIRECTORS, BLACKHAWK GRAD FROM: J. MICHAEL WALFORD, PUBLIC WORKS DIRECTOR C .11 ` DATE: OCTOBER 27, 1098 SUBJECT: RATIFY DECISION OF THE GENERAL MANAGER, BLACK.HAWK GEOLOGIC HAZARD ABATEMENT DISTRICT(CHAD)TO AWARD CONTRACT TO SITEWORKS CONSTRUCTION INC. IN THE AMOUNT OF $247,915.00 FOR THE REPAIR LANDSLIDE DAMAGE ON CHESTNUT PLACE, DANVILLE AREA (WO#5147) SPECIFIC REQUEST(S)OR RECOMMENDATION(S)&BACKGROUND AND JUSTIFICATION I. Recommended Action: RATIFY decision of William R. Gray and Company, as General Manager of the Blackhawk Geologic Hazard Abatement District(GHAD),to award a contract in the sum of$247,915.00 for the repair of the Chestnut Place landslide to Siteworks Construction,Inc.,Lafayette,California. II Financial Impact: No impact on the County General Fund.The Blackhawk GRAD is funded through revenues generated by County Service Area M-23. The proposed contract is consistent with the adopted FY 98/99-prograrn budget. III. Reasons for Recommendation and Background: During the winter of 1998,a landslide occurred in the rear of two homes on Chestnut Place in Blackhawk, Danville,California. The landslide impacted a common area,a storm drain line and the rear yards of the homes at Y 4 Continued on Attachment:X IGNATUj)44t/v1__ RECOMMENDATION OF COUNTY ADMINISTRATOR ®RECOMMENDATION OF BOARD COMMITTEE —APPROVE —OTHER CI!"N A TISI2T./C1. ACTION OF BOARD ON 0_toter 27, 19% APPROVED AS RECOMMENDED _ IIINOW VOTE OF SUPERVISORS _y_ UNANIMOUS(ABSENT 11I } AYES: NOES: ABSENT: ABSTAIN: I hereby certify that this is a true and correct S&M copy of an action taken and entered on the g:\GrpdaulspdistBoardOrdets\CanyonLakesGHAD\AAwardContract.doc ,.minutes of the Board of Supervisors on the Orig.Div: Public Works(Special Districts) date shown. Contact: Skip County dmini trator ATTESTED: ec: County Administrator County CounselGHAD Blacawk CHPHIL BATCHELOR, Clerk of the Board khdo William R Gray and Co. BlaokhawkEOA of Supervisors and County Administrator BlacSite"rks ConCorporation By ',•y, " 0 Deputy Siteworks Conatntction,In,. _G!/J'/N! l!"" William&Barbara Goza Mike&Julie Watson SUBJECT: RATIFY DECISION OF THE GENERAL MANAGER, BLACKHAWK GEOLOGIC HAZARD ABATEMENT DISTRICT(GHAD)TO AWARD CONTRACT TO SITEWORKS CONSTRUCTION INC. IN THE AMOUNT OF $247,915.00 FOR THE REPAIR LANDSLIDE DAMAGE ON CHESTNUT PLACE, DANVILLE AREA. DATE: OCTOBER 27, 1998 PAGE: -2- 49 and 53 Chestnut Place. The Blackhawk Homeowners Association(HOA)maintains the common area and the storm drain line. The landslide occurred within the boundaries of the Blackhawk GHAD. The slide occurred on February 8, 1998 and was reported to the GHAD almost immediately. The GHAD responded to the slide as an emergency and installed steel reinforced concrete caissons to protect the two residences. The temporary repair remained stable through subsequent rains,although the lower portion of the slide required numerous additional responses to stabilize. Engeo,Inc., San Ramon, California was retained by the GRAD to evaluate the landslide and recommend a repair strategy. By letter dated July 6, 1998,Engeo transmitted their findings and recommendations to the GHAD. Engeo recommended the installation of additional steel reinforced concrete caissons as well as removal and replacement of slide material with drained-engineered fill. The damaged storm drain will be replaced. The project was included in the adopted FY 99/99 budget with an estimated repair cost in the range of $150,000.00 to$200,000.00. Because the landslide damaged a portion of the HOA maintained drainage system,the Blackhawk HOA agreed to contribute$36,250.00 toward repair of the storm drain. Consequential damage to landscaping and other site improvements has been estimated(by the two homeowners)to be in excess of$100,000. License Agreements providing the GHAD with sufficient rights to enter upon and repair the landslide have been executed with the Blackhawk HOA as well as the two affected homeowners(Goza and Watson). The License Agreements with the two homeowners provide for the GHAD to partially reimburse the homeowners the cost of repairing and/or replacing landscaping and other improvements damaged by the landslide in accordance with the GHAD's interim policy on Funding for the Repair and/or Replacement of Landscaping and other Improvements Damaged by Landslides. Board Resolutions 86/370 and 98/329 define procedures related to advertising and awarding of GHAD maintenance and repair contracts. On September 21, 1998,the GHAD advertised for bids for the repair of both the Chestnut Place landslide and the damaged storm drain line. Pursuant to the provisions of Resolution 98/329, four pre-qualified contractors were invited to submit bids. Bids were received and opened in the office of the General Manager on Thursday,October 8, 1998. The lower of the two bids received was from Siteworks Construction, Inc.,Lafayette,California, in the amount of$247,915.00. Sufficient funds are available in the approved GHAD budget and its reserve account for the project. Because of the emergency nature of the project and the need to proceed with the repair before the winter rains, the General Manager awarded the contract to Siteworks Construction,Inc., on October 13, 1998. Consequences of Negative Action: The Chestnut Place landslide would not be repaired this season,which possibly could result in significant damage to the two houses located at the top of the landslide. cjs TO: BOARD OF SUPERVISORS AS THE BOARD OF DIRECTORS, BLACKHAWK GHAD FROM: J. MICHAEL WALFORD, PUBLIC WORKS DIRECTOR DATE: OCTOBER 27, 1998 SUBJECT: RATIFY DECISION OF GENERAL MANAGER, BLACKHAWK GEOLOGIC HAZARD ABATEMENT DISTRICT(GHAD) TO EXECUTE A LICENSE AGREEMENT WITH BLACKHAWK HOMEOWNERS ASSOCIATION, WILLIAM AND BARBARA GOZA, AND MICHAEL AND JULIE WATSON FOR THE REPAIR OF THE LANDSLIDE DAMAGE ON CHESTNUT PLACE, DANVILLE AREA. (WO#5147) SPECIFIC REQUEST(S)OR RECOMMENDATIONS)&BACKGROUND AND JUSTIFICATION L Recommended Action: RATIFY the decision of William R.Gray and Company,as General Manager of the Blackhawk Geologic Hazard Abatement District(CHAD),to EXECUTE the attached License Agreements with the Blackhawk Homeowners Association as well as the owners of two residential properties,William and Barbara Goza and Michael and Julie Watson, in conjunction with the GHAD's proposed repair of the Chestnut Place landslide,Danville,California. II FinanciallmPaet: No impact on the County General Fund.The Blackhawk CHAD is fanded through revenues generated by County Service Area M-23. The proposed agreements are consistent with the adopted FY 98/99-program budget. TH. Reasons for Recommendation and Background: During the winter of 1998, a landslide occurred in the rear of two homes on Chestnut Place in Blackhawk, Danville,California. The landslide impacted a common area,a storm drain line and the rear yards of the homes at 49 and 53 Chestnut Place. The Blackhawk HOA maintains the common area and the storm drain line. The landslide occurred within the boundaries otthe Blackhawk.CHAD. Continued on Attachment:X SIGNATU RECOMMENDATION OF COUNTY ADMINISTRATOR ®RECOMMENDATION OF BOARD COMMITTEE APPROVE OTHER CTC!N A TT 172:L'.lC\. ACTION OF BOARD ON Qtober 27, 19% APPROVED AS RECOMMENDED_.X_I VOTE OF SUPERVISORS UNANIMOUS(ABSENT irrw ) AYES: NOES: ABSENT: ABSTAIN: SE:cs I hereby certify that this is a true and correct g:\Grpdata\Spdist\BoardOrders\CanyonLakes0HAD\AwardCbntract.doc copy of an action taken and entered on the OHS.Div: Public Works(Special Districts) minutes of the ward of Supervisors on the Contact: Skip Epperly(333-2253) date shown. cc: County Administrator /t County Counsel ATTESTED: -L7, 7 / FSE tokhaaakHOAD�oWilliam R.Greyand Co. PNit_BATCHELOR, Clerk of the Board Blackh*wk Barbara of Supervisors and County Administrator WitGsm&Barbara Gaza Mike&Jolie Watson By Deputy SU6JECT: RATIFY DECISION OF GENERAL MANAGER.TO EXECUTE LICENSE AGREEMENTS ALLOWING THE CHAD TO PROCEED WITH REPAIR OF THE CHESTNUT PLACE LANDSLIDE,DANVILLE, CALIFORNIA. DATE: OCTOBER 27, 1998 PAGE: -2- The slide occurred on February 8, 1998 and was reported to the GHAD almost immediately. The GRAD responded to the slide as an emergency and installed steel reinforced concrete caissons to protect the two residences. The temporary repair remained stable through subsequent rains,although the lower portion of the slide required numerous additional responses to stabilize. Engeo,Inc.,San Ramon,California was retained by the GRAD to evaluate the landslide and recommend a repair strategy. By letter dated July b, 1998,Engeo transmitted their findings and recommendations to the GRAD.Engeo recommended the installation of additional steel reinforced concrete caissons as well as removal and replacement of slide material with drained-engineered fill. The damaged storm drain will be replaced. The project was included in the Blackhawk GHAD's adopted FY 98/99 budget with an estimated repair cost in the range of$150,000.00 to$200,000.00. Because the landslide damaged a portion of the HOA maintained drainage system,the Blackhawk HOA agreed to contribute$36,250.00 toward repair of the storm drain. Consequential damage to Iandscaping and other site improvements has been estimated(by the two homeowners)to be in excess of$100,000. License Agreements were developed in consultation with County Counsel to provide the GHAD with the necessary liability protection as well as sufficient rights to enter upon private property to repair the landslide. The License Agreement with the Blackhawk HOA gives the GHAD permission to enter and repair that portion of the landslide that impacted property owned and maintained by HOA. The Agreement also gives the GHAD's contractor(Siteworks Construction Inc.,Lafayette,California)permission to use a portion of HOA maintained common area as a staging area for its operations. In addition,the License Agreement with the HOA provides for the transfer of$36,250.00 to the GRAD to cover the HOA's obligations with respect to repair of the damaged storm drain line. The License Agreements with the two homeowners(Goza and Watson)provide the CHAD with the necessary rights of entry and liability protection to proceed with the repair. The Agreements also provide for the GHAD to partially reimburse the homeowners the cost of repairing and/or replacing landscaping and other improvements damaged by the landslide. Said reimbursement is subject to submittal of invoices and was developed in accord with the GHAD's interim policy on Funding for the Repair and/or Replacement of Landscaping and other Improvements Damaged by Landslides. Because of the emergency nature of the project and the need to proceed with the repair before the winter rains, the General Manager executed the agreement with the Blackhawk HOA on September 23, 1998. The agreements with the Gozas and the Watsons were executed on October 12, 1998. The contract with Siteworks Construction was awarded on October 13, 1998. Consequences of Negative Action: Without the rights provided by the three License Agreements,the GRAD would not have been able to award a contract for the repair and the Chestnut Place landslide could not be repaired this season. Any significant delay in the repair could possibly result in significant damage to the two houses located at the top of the landslide. DATE: �' 7 -! , 7 L Y ITEM CONSIDEREDWITH. . . . . . . . . . . . . . . . . . . . . . LISTED IN ERROR. . . DELETED. . . . . . . . . . . . . . . . . . . . . . . . . . . . . .,> .. TO: BOARD OF SUPERVISORS,AS GOVERNING BOARD OF CONTRA COSTA COUNTY AND CONTRA COSTA COUNTY FLOOD CONTROL AND WATER CONSERVATION DISTRICT FROM: J. MICHAEL WALFORD, CHIEF ENGINEER DATE: October 27, 1998 SUBJECT: APPROVE Tice Creek Flood Control Channel Project, Walnut Creek.Area Project No: 7520-6B9365-97,CDD-CP # 98-79 SPECIFIC REQUEST(S)OR RECOMMENDATION(S)&BACKGROUND AND JUSTIFICATION I. Recommended Action: APPROVE Project, and DETERMINE that the project is a California Environmental Quality Act (CEQA) Class 1d Categorical Exemption. DIRECT the Director of Community Development to file a Notice of Exemption with the County Clerk. DIRECT the Chief Engineer to arrange for payment of the $25.00 handle fee to the County Clerk for filing of the Notice of Exemption. Continued on Attachment: X SIGNATURE: RECOMMENDATION OF BOARD COMMITTEE APPROVE OTHER SIGNATURE(S): ACTION OF BOARD ON 0 tcber 27, 19% APPROVED AS RECOMMENDED VOTE OF SUPERVISORS X UNANIMOUS(ABSENT N3W ) AYES: NOES: ABSENT: ABSTAIN: GC:JF G:\GrpData\FldCtl\FCBO\bo I0-27.doe OriB.Div: PublieWorks I hereby certify that this is a true and correct Contact: Mike Carlson,(925 313 2311) copy of an action taken and entered on the cc: County Administrator's Office ,.i he CountyAuditor-Controllerminutes of the Board gupervf5ors on t County Counsel date shown' p J�' PW-Flood Control /4?IV Co -Accounting ATTESTED: . (f 5.:•-�•=� CommunityDeveEopment-A.WoodsClark of thea Board PHIL BAGi•i�L(JFI, of Supervisors and County Administrator By Deputy SUBJECT: APPROVE Tice Creek Flood Control Channel Project, Walnut Creek Area Project No: 7520-6B9365-97, CDD-CP#98-79 DATE: October 27, 1998 PAGE 2 II. Financial Impact: This project will have no impact on the General Fund. The Flood Control District's estimated project cost is $85,000. The project will be funded by Flood Control Zone 3B funds. Flood Control will then bill the owner, Shaw Properties, for all repair costs including staff time. II. Reasons for Recommendations and Background: The project consists of repairing the Tice Creek Box Culvert that was damaged by the property owner. IIL Consequences of Negative Action: Non-concurrence with the above recommendations will significantly and adversely delay repairs to the Tice Creek Flood Control Channel. TO: BOARD OF SUPERVISORS, AS AND CONSTITUTING THE BOARD OF DIRECTORS OF CONTRA COSTA COUNTY SANITATION DISTRICT NO. 6 FROM: J. MICHAEL WALFORD, PUBLIC WORKS DIRECTOR [SATE: OCTOBER 27, 1998 SUBJECT: STONEHURST SUBDIVISION, LOT NO. 16, MARTINEZ AREA SANITARY SEWER EASEMENT Project No.: 7365-6X9E30 Task: ACQ Account No: 3540 SPECIPM R U S'T(S} R G @N A ?O ( }&BAG R URD AND JUETIFMATIOP L 8mmmendod Action: ACCEPT Grant of Easement from St. Peter Construction, Inc., Peter Baldaccl, President executed on August 26, 1998, to Centra Costa County Sanitation District No. 6. II. Financial 1_r iac : None III. Reasons for Rtoommendations and BlIckgrgund: Grant of Easement will perfect the District's rights for the existing sanitary sewer line constructed on Lot No.1+6, Stonehurt Subdivision. IV. gQnsgqugnn�e of f NP-gats Action: The Sanitation District will not have sufficient land rights over private property for the operation and main Hance of its sewerage service system. Continued on Attachment:— SIGNATURE: ` —RE lillMENDA3I IN CSF BOURW A RRISTRATUR ,-,.,_RECOMMENDATION OF BOARD COMMITTEE —APPROVE —OTHER SIGNATURE(S): ACTION OF WOARD ON C_-tober 77, r4 APPROVED AS RECOMMENDED VOTE OF SUPERVISORS _X_ UNANIMOUS(ABSENT. ) AYES. NOES: I hereby certify that this is a true and correct €� PP ABSENT: ABSTAIN:- tippy of an action taken and entered on the G:\GrpDatatRealPropt98-1 Dtboal t3-27.doc minutes of the Board of Supervisors on the :tGrp Orig.Div: Public works(RFP) date shown. ,0 Contact: Patricia Smyers(313-2227) ATTESTED: LC&- x.,/_27 �/ff cc: County Administrator PHIL BATCHELOR, Clerk of the Hoard Auditor-Controller(via R/P) of Supervisors and Gaunt Administrator P. W.Accounting gy '�-1� ,,> , Deputy Recorded at the requestof . Go_ntra`Costa County a CONTRA COSTA Co Rerc►rdar s office 8TWM L. WEIR, City recorder Return to: 0:206026-00 Public Contra Costa County LOC - 9S— Public Works Department Check Number � Thur 255 Glacier Drive f Fsday AUG 27, 1998 14t22:00 Real Property Division ' ' Thu $1,OO;MOD $4,OO,RI'sC $8.00 `� t Martinez, CA 94553 l TCS` $3-001, fir-0000239892 Atte: Pat 5myers Ttl Pd $16.00 bit/R5/1-4 Assessor's Parcel No.: 3677230-009 Lot 16 GF;tANT OF EASEMENT THIS INDENTURE, made by and between St. Peter Construction, Inc., Peter Baldacci, President, hereinafter called the GRANTOR, and CONTRA COSTA COUNTY SANITATION DISTRICT NO. 6, hereinafter called the GRANTEE, WITNESSETH : That the GRANTOR, for value received, hereby grants to the GRANTEE, a perpetual easement and right of way for the purposes of laying down, constructing, reconstructing, removing, replacing, repairing, maintaining, operating and using, as the GRANTEE may see fit, a sewer pipe or pipelines and all necessary braces, connections, fastenings, or other protective barriers or facilities, and other appliances and fixtures for use in connection therewith or appurtenant thereto, in, under, along, and across that certain real property in the unincorporated area of the County of Contra Costa, State of California, described as follows: FOR DESCRIPTION SEE EXHIBIT"A" and `°B" ATTACHED HERETO AND MADE A PART HEREOF, TO HAVE AND TO HOLD, all and singular, the rights above described unto the GRANTEE and the GRANTEE's successors and assigns forever. IN WITNESS WHEREOF, the GRANTOR has executed this indenture this day ofhi ey--, 19 Grantor By: Peter Baldacci, President St. Peter Construction, Inc. ATTACH APPROPRIATE ACKNOWLEDGMENT SE:cs g:lgrpdatatspdist\Skiplgrenteasement.wpd May 1998 EXHIBIT " B " � Portion of Lot 16 Subdivision 7091 FiledR = 130.00' April 26, 1991 in Book ''ly `�� _ 05° 34'1$" R = 20.00' 0.00 66- 30., L 12 64 356 of Maps Page 25 = ' L = 23.11' R-40� >0 - • R . 170.00' ,� A 14° 05`17" tT) 9• U o L 41.80' (T) y 74 4 44 2 ry, ! •� R=20.00' La=350 00'25" ! L-12.22' SCALE 1"=50' 04 LEGEND ` l Lot 16 FOUND REBAR Q FOUND S.S. MANHOLE FOUND STANDARD -� O STREET MONUMENT 1 STAMPED LS 6608 Parcel " a" Bearings and distances based on Calif. Coordinate System Zone lil (CCS27). Multiply given distances by Nay° 1.0000883 to obtain ground distances. 13 9,32,.w �s< IV,66° A'1ry a 347 o06- /V yy o z L c t 2 s? ,� s , a _ ...... _ .................................... c Stonehurst Sanitary District ; Sanitary Sewer Easement MA-186-97 E)=- IT"A" Real property in the unincorporated area of Contra Costa County, California, being a portion of Lot 16 of the Stonehurst Subdivision as shown on the map of Subdivision 7091 filed April 26,1991 in Book 356 of maps at page 25, being a strip of land 10 feet in width the centerline of which is described as follows: Commencing at the most westerly corner of said lot 16; thence along the southwesterly line of said Lot lb, South 29019'55" East 55.55 feet, to the Point of Beginning; thence from the Point of Beginning leaving said southwesterly line,North 24°33`53" East 139.11 feet, to the southerly right of way line of Stonehurst Drive, the terminus of said centerline. Containing an area of 1391 square feet of land, more or less. Bearings and distances are based on the California Coordinate System Zone III (CCS27). Multiply given distances by 1.0000883 to obtain ground distances. This real property description has been prepared by me or under my direction, in conformance with the Professional Land Surveyors Act. SAND Signature: ./a ZW`iy ��y ceased Land Surveyor �1 E oi Contra Costa Cvounty Public Works No. ST39 1 f Date: f�(...''Y' �.f' f tS,J��' r OF CAt.\r kz:L I' G:1I)ESIGN\PA"I '\STONE16.WPI) Octobcr 21, 1997 CALIFORNIA ALL-PURPiOSL ..CKNOWL.EDGMIENT No.SW7 zcia 2o I1: C C°I State of __ CA .TTFQRNTA County of CONTRA COSTA '; On AUGUST 26, 1998_ before me, A.J.BOOTH, NOTARY PUB .T ©ATE NAME.TITLE OF OFFICER•E.G.,`,1ANE DOE,NOTARY PUBLIC personally appeared PETER BALDACCI NAME(S)OF SIGNERS) ( personally known to me - OR - ❑ proved to me on the basis of satisfactory evidence to be the person(s) whose name(s) is/are subscribed to the within instrument and ac- knowledged to me that he/she/they executed the same in his/her/their authorized capacity(ies), and that by his/her/their - signature(s) on the instrument the person(s), or the entity upon behalf of which -the BOOTHpersons) acted, executed the instrument. GofAft#1185435 U�I t ray m^ NOTARY PUBLIC-CALIFORNIA ` CONTRA COSTA COUNTY� COMM.EXp.JUNE 24,2002-` my WITNESS hand and official seal. SIGNATURE OF NOTARY OPTIONAL Though the data below is not required by law, it may prove valuable to persons relying on the document and could prevent fraudulent reattachment of this foram. CAPACITY CLAIMED BY SIGNER DESCRIPTION OF ATTACHED DOCUMENT ❑ INDIVIDUAL ❑ CORPORATE OFFICER GRANT OF EASEMENT TITLE OR TYPE OF DOCUMENT TRLE(S) ❑ PARTNER(S) ❑ LIMITED ❑ GENERAL ❑ ATTORNEY-IN-FACT NUMBER OF PAGES ❑ TRUSTEE(S) ` ❑ GUARDIAN/CONSERVATOR ❑ OTHER: AUGUST 26, 1998 DATE OF DOCUMENT SIGNER IS REPRESENTING: NAME OF PERSON(S)OR ENTITY(IES) SIGNER(S)OTHER THAN NAMED ABOVE 01993 NATIONAL NOTARY ASSOCIATION•8236 Rernmet Ave..P.O.Box 7184•Canoga Park,CA 913(79-71 S4 END of DDCUMEtj;