Loading...
HomeMy WebLinkAboutMINUTES - 10201998 - C62 To: BOARD OF SUPERVISORS 250-9702/13.4.1 FROM: BARTON J. GILBER.T,DIRECTOR OF GENERAL SERVICES Contra •`� DATE: October 20, 1998 Costa County SUBJECT: DISPATCH CENTER.REMODELING, 40 GLACIER DRIVE, MARTINEZ,FOR SHERIFF-CORONER(WH354C,D) SPECIFIC REQUESTS OR RECOMMENDATION(S)&BACKGROUND AND JUSTIFICATION 1• R i LQMM dY.]&GLSTION DETERMINE that there is no longer a need to continue the emergency action taken by the Board on January 27, 1998 pursuant to Public Contract Code Sections 20134 and 22050, to remodel 40 Glacier Drive, Martinez for the Sheriff Dispatch Center, and TERMINATE the emergency action. II. FMN CIAL IMPAC Funding for this project has been budgeted. A. On April 8, 1997 the Board accepted a report from the County Administrator and the Sheriff- Coroner regarding the Emergency Communications Center at 40 Glacier Drive, Martinez and directed the Director of General Services to proceed with preparation of plans and specifications for remodeling the facility. B. On November 4, 1997 the Board accepted completion of the contract for improvements in unfinished., vacant space at 1960 Muir Road, Martinez. The improvements were made to accommodate the Sheriff Dispatch operation, which had to be moved out of 40 Glacier Drive, temporarily, before the remodeling of 40 Glacier Drive could begin. The improvements at 1960 Muir Road were accomplished and the Dispatch operation was relocated on an accelerated schedule to meet funding deadlines. CONTINUED ON ATTACHMENT: _YES SIGNATURE: __..�RECOMMENDATION OF COUNTY ADMINISTRATOR RECOMMENDATION OF BOARD COMMITTEE APPROVE OTHER SIGNATURE(S): ACTION OF BOARD ON_ O C t O b e r _20, 1998 APPROVED AS RECOMMENDED x OTHER VOTE OF SUPERVISORS XX.,_ UNANIMOUS(ABSENT — — ) AYES: NOES: ABSENTS: ABSTAIN: MEDIA CONTACT: BARTON J.GILBERT(313-7100) CC: General Services Department I HEREBY CERTIFY THAT THIS IS A TRUE Architectural Division AND CORRECT COPY OF AN ACTION TAKEN AND ENTERED ON TIME MINUTES OF THE BOARD File: 250-97021A.5 OF SUPERVISORS ON THE DATE SHOWN. County Administrator's{3!`fice County Counsel(Via A.D.) ATTESTED_ O c t o b e r 2 0. 19 9 8 Sheriff-Coroner(Via A.D.) PHIL BATCH .CLERK OF THE HOARD OF SUPE RVIS COUNTY ADM 1STRATOR BY ��tDEPUTY ro - HM997\2509702V1-002101.doc SJ:tb Page 1 of 2 M382(10/88) DISPATCH CENTER REMODELING, 40 GLACIER.DRIVE, MARTINEZ, 250-9702/13.4.1 FOR SHERIFF-CORONER(WH354C,D) September 15, 1998 C. In December, the Sheriff determined that the temporary Dispatch Center',did not have enough work stations to properly handle a countywide emergency. Consequently, on January 27, 1998 (Agenda Item C-57), the board 1) found that an emergency exists, 2)delegated authority to the General Services Director to proceed in the most expeditious manner to remodel the 40 Glacier Drive Dispatch Center, 3) directed the General Services Director to make reports to enable the Board to review the emergency actions and to determine that there is a need to continue the action, and 4) declared that the project, as an emergency, is except from the provisions of the California Environmental Quality Act. D. Lease Management Division negotiated a lease for temporary space at 827 Arnold Drive, Suites 80 and 230, in Martinez, to house the administrative personnel displaced by the remodeling of 40 Glacier Drive. The administrative personnel vacated 40 Glacier Drive and occupied the Arnold Drive Suites on March 18, 1998. E. On February 18, the proposed contractor submitted a proposal, work plan and schedule for construction, based on progress prints of the construction documents. A contract was issued to the Contractor, RGM and Associates, Inc. on March 5, 1998, with an effective date of February 4, 1998 and a payment limit of$658,796.00. On March 6, 1998, the completed construction drawings were issued to the contractor with a request for confirmation of the payment limit. On March 17, a formal notice to proceed was issued to confirm the contract starting date of February 4, 1998. The contractor started demolition work on March 23, 1998. F. A consulting services agreement with Harding Lawson Associates was issued with an effective date of March 10, 1998 and a payment limit of$5,800.00. The agreement covers geotechnical engineering services, including recommendations for foundation design and construction, and on-site testing of existing and imported soils. G. A consulting services agreement with Signet Testing Labs was issued with an effective date of March 10, 1998 and a payment limit of$72,726.00. The agreement covers construction materials testing and special inspections in accordance with the requirements for essential services buildings in Title 24 of the California Code of Regulations. H. Change Carder No. 1 for$97,393.00 was issued April 30, 1998 to incorporate the scope of work shown on the completed construction drawings into the contract. The revised contract payment limit is $756,189.00. There is no increase in the Contract time for completion. I. On August 31, 1998 the Sheriff Dispatch operation moved from the temporary Dispatch Center at 1960 Muir Road to the remodeled Dispatch Center at 40 Glacier Drive. J. Change Order No. 2 for $71,492.00 was issued September 29, 1998. The revised contract payment limit is $827,681.00. The Contract Completion Date is October 29, 1998. K. On October 20, 1998, the Board accepted the work as complete, except for certain minor punch list work. L. The condition that the Board found to be an emergency on January 27 no longer exists. That is, the temporary facility at 1960 Muir Road no longer serves as the Dispatch Center because the permanent facility at 40 Glacier Drive is now occupied. Therefore, it is no longer necessary to continue the emergency action previously taken by the Board. HA199712509702VL002101.doc SJ:tb Page 2 of 2 M382(10188)