k'O: BOARD OF SUPERVISORS
FROM: J. MICHAEL WALFORD, PUBLIC WORKS DIRECTOR C l ��
DATE: DECEMBER 16, 1997 \
SUBJECT: APPROVE SUBMITTAL OF COMMUNITY DEVELOPMENT BLOCK GRANTAPPLICATION
FOR INSTALLATION OF TURF AND IRRIGATION SYSTEM IN THE PLAYGROUND AREA AT
LEFTY GOMEZ BALLFIELD COMPLEX,RODEO AREA
PROJECT#7805-6X-5523
SPECIFIC REQUEST(S)OR RECOMMENDATION(S)&BACKGROUND AND JUSTIFICATION
I. Recommended Action:
APPROVE submittal of a grant application to the Community Development Block Grant(CDBG)Program for
installation of turf and an irrigation system in the playground at Lefty Gomez Ballfield Complex in the Rodeo area.
II. Financial Imgact:
There will not be any impact on the County General Fund. The matching funds for this grant application will be
derived from the Landscaping Assessment District, Zone 38,Rodeo.
III. Reasons for Recommendations and Background:
In 1995 Contra Costa County executed a 50-year Lease Agreement with John Swett School District for the
management and maintenance of the LeW7GomeBallfieldComplex. The existing playground structure was
Continued on Attachment: SIGNATURE t l�
_RECOMMENDATION OF COUNTY ADNIINISTRATOR
_RECOMMENDATION OF BOARD COMMITTEE
APPROVE OTHER
SIGNATURE(S):
ACTION OF BOARD ON / -�(p-�9 g 7 APPROVED AS RECOMMENDED_OTHER
VOTE OF SUPERVISORS
�/ UNANIMOUS(ABSENT )
AYES: NOES:
ABSENT: ABSTAIN:
SETE:cs
g:\Engsvc\Spdist\BO\December\CDBG ,
(hereby CWW Met this to a true and correct copy of
a� actton aid entered On the minUlea Of tt19
Orig.Div: Public Works(Special Districts) on the date shown.
Contact: Paula Edmonds(313-2389) 1i08rd Of 8 e - n`e //O r/(� 1
cc: Auditor-Controller � $T'ED j }" //
P.W.Accounting p�l!_CA'OHEU R,Cleric of the hoard
of supervisors a:.1%o:lnty AdministralIN
� t�ttty
§UBJECT: APPROVE SUBMITTAL OF COMMUNITY DEVELOPMENT BLOCK GRANT
APPLICATION FOR INSTALLATION OF TURF AND IRRIGATION SYSTEM IN THE
PLAYGROUND AREA AT LEFTY GOMEZ BALLFIELD COMPLEX, RODEO AREA
PROJECT#7805-6X-5523
DATE: DECEMBER 16, 1997
PAGE -2-
installed piecemeal over a period of years spanning from the 1950's through the 1980's posed numerous hazards
and was in-accessible for disabled users. In Fiscal Year 1996/97 the CDBG program awarded a grant to replace
the play structure and install the accessibility measures. The playground structure was removed in the fall of 1997
and a new structure and the handicap access measures will be installed in the Spring of 1998. This FY 1998/99
CDBG application seeks to complete the restoration of the playground area with the installation of turf and an
irrigation system throughout the playground area.
IV. Consequences of Negative Action:
Without Board approval the CDBG grant request cannot be submitted.