SUBJECT:. CONTOURING OF "HILL 410" IN BAY POINT
SPECIFIC REQUEST(S)OR RECOMMENDATION(S)&BACKGROUND AND JUSTIFICATION
RECOMMENDATION:
1. DIRECT staff of the Growth Management and Economic Development Agency to
estimate the cost of Contouring "Hill 410" in Bay Point and report back to the
Finance Committee.
BACKGROUND:
The Committee reviewed the attached information prepared by Supervisor Torlakson and
heard a presentation by the GMEDA Director. It was determined that more information
was needed before action can be taken on this issue. The GMEDA Director indicated that
Public Works staff will evaluate the grading issue. The Committee suggested that General -
Services Department crews could provide landscaping services as needed. A report will
be prepared at a future Finance Committee meeting.
CONTINUED ON ATTACHMENT: YES SIGNATURE:
RECOMMENDATION OF COUNTY ADMINISTRATOR RECOMMENDATION OF BOARD COMMITTEE
APPROVE OTHER
SIGNATURE(S): Mark DeSaulnler Tom Torlakson
ACTION OF BOARD ON - November 19, 1996 APPROVED AS RECOMMENDED x OTHER x
By a unanimous vote of the Board of Supervisors , it was determined to consider the
material contained in this report, waiving the Better Government Ordinance requirements .
The Public Works Director and Growth Management and Economic Development Director are
DIRECTED t6 ;IFIVdRtigate with Caltrans and Contra Costa Transit Authority whether a
portion of the 1 .5 million dollar landscape budget for State Route 4 and the Willow
Pass Grade in this vicinity could be combined with the County' s resources to accomplish
the contouring ; and the Public Works Director is REQUESTED to provide a report on
the determination of the ownership of Hill 410.
VOTE OF SUPERVISORS
I HEREBY CERTIFY THAT THIS IS A TRUE
-"UNANIMOUS(ABSENT ) AND CORRECT COPY OF AN ACTION TAKEN
AYES: NOES: AND ENTERED ON THE MINUTES OF THE BOARD
ABSENT: _ABSTAIN: OF SUPERVISORS ON THE DATE SHOWN.
ATTESTED November 19, 1996
Contact: PHIL BATCHELOR,CLERK OF THE BOARD OF
CC: GMEDA SUPERVIS S AND COUNTY ADMINISTRATOR
Public Works
General Services
County Administrator BY DEPUTY
5104278142 P 02V06
NOV-07-199t--,
RECEIVED SEP 2 1gg�
CONTRA COSTA COUNTY
COMMUNITY DEVELOPMENT DEPARTMENT
t
TO: Supervisor T, Torlakson DATE: August 29, 1996
Attention: Kathie Gilmore =
FROM: Harvey E. Bragdon, Director
By: Arthur Beresford, Serio neer IaJa r
SUBJECT: W1310 Rounding(Hill 428?)
I have been asked by Harvey Bragdon to research the question of the rounding of the mounds to the
south and east of the water tanks at the top of the hill west of the Mata Road and Evora Road
intersection in the Bay.Point area,
I have obtained a copy of the grading plan from the Building Inspection Department records (copy
attached),
The Condition of Approval for SUB. 7152, DP883032, and RZ2812 that involved the portion of the
site west of Mota Road, reads as follows:
"la. This portion of the site lying west of Mota Drive shall not be developed. This
property (known now as "Hill 428") shall become permanent open space and shall
be disturbed to the minimum extent feasible by construction associated with the
Seabreeze development, allowing for the installation of water lines and a water tank
necessary to serve the project site. The open space shall be deeded over to a public .
agency subject to review and approval of the County Zoning Administrator.
Applicant shall berm and landscape existing water tank to conceal to the maximum
extent feasible. The applicant shall conceal the future water tank to the greatest
extent or bury if necessary. Applicant shall have created and installed (subject to
Zoning Administrator review and approval) a historic marker to be permanently
placed on "Hill 428" commemorating both the Spanish and Native American
populations."
The property is now owned by the County and the County would be the caretaker of the site. The
site contains approximately 7.56 acres (Parcel 9098-220-013). The Southern California Water
Company own a .954 acre parcel where the two water tanks are located (Parcel #098-220-009).
n
NO0-07-1996 13:39 5104276142 P.03i06
z
i
2 rF
• P
Y-
I have briefly contacted the Senior Grading Inspector about the grading on the site about any
inspections that were done in 1990 - 1992 on the site. He is on vacation so when he returns, and I
return from three days off next week, I will try to find out if the site was graded per the plans
attached.
When I visited the site this week, I found the mounds covered with grass, and some of the planted
trees alive and some dead. The monument on top of the northern mound had been heavily
vandalized.
As you know, the developer(Crarrett Development) appears to be out of business. This fact is being
investigated by risk management in regards the problem with slope stability at the east end of the
Seabreeze development. At this time all of our files are with the lawyer involved in that matter on
the County's behalf.
t>:
AB/aa
LTR 1/Hill3 10.AB
y.
Via.
NOV-07-1996 1.^:39 5104278142 F.04:06
DATE: April 25, 1996
TO: Harvey Bragdon, Director - Community Development
FROM: Supervisor Tom Torlakson
SUBJECT: Hill 310 (Garrett Development)
I am once again attempting to followup on the "rounding off' of Hill 310. As you will r
remember, the rounding of this hill was a condition of approval for Garrett Development
who promised to complete this aspect of the project in 1992.
Before leaving the County last May my aide, Sharon Haynes-Creswell sent a memo to =
your department requesting the status of this issue. To the best of my knowledge, we
have not received a reply and my visual observation of this hill indicates that the proper
rounding off has not been accomplished.
Who is now the caretaker for this portion of the development - is it now under the
jurisdiction of a special district(landscape and lighting) of the County? Please follow-up s
on this issue at your earliest opportunity. I would like to bring this issue to conclusion
within the next two weeks.
If you have any comments or questions regarding this issue, please contact Kathi r
Gilmore of my staff.
TT:kmg
Enclosures
r '
NOV-07-1996 13:40 510442778142 P.05!06
_ VI�UN -
Tom Torlakson
r - 300 East Leland Road
Supervisor,District Five j Suite 100
Contra Costa County - ,s Pittsburg,California 94565-4961
Board of Supervisors — - (510)427-8138
DATE: April 28, 1995
TO: Harvey Brag'don, Director
Community Development Department
FROM- Sharon Haynes-Creswell, Assistant
Tom Torlakson, Super'v'isor, District V
SUBJECT: Hill 410 -
In 1992, Garrett Development promised (see attached memo) t6
"round off" Hill 410, to date this does not appear to have
been done. Would you have your staff follow-up as ' soon as
possible to make sure the hill is rounded. Your prompt
attention is sincerely appreciated.
C
12..
!Qtqr9' f Tipp
to: Board of Supervisors
from: Tony Enea`��
Senior Deputy County Administrator
re: Finance Committee Action on the contouring of"Hill 410" in Bay Point
date: November 14, 1996
On November 18, 1996, the Finance Committee will review the above listed item.
Therefore, a report will not be prepared until Monday afternoon or Tuesday
morning. Attached is the Board referral from Supervisor Torlakson.
a four-fifths vote will be required to take this issue up on November 19 pursuant to
the Better Government ordinance.
TE:hs
cc: Phil Batchelor
Attachment
From the desk of...
Tony Enea
Senior Deputy County Administrator
Contra Costa County
651 Pine St., 10th Floor
Martinez,CA 94553
tel: (510)335-1094
fax: (510)646-1353
i
NO1,1_07-1996 1-Z:40 5104278142 P.06/06
Lp�;IrtµG03)TA
r
Garrett Development Inc.
11975Et Gox:ino/teal,Suile 300 6191792-9476 FJ11
San Dingo,California,92130 Contractor's License#5,13147
4
q'
February 24, 1992
ti-
Mr Byran Turner
CONTRA COSTA COUNTY COMMUNITY DEVELOPMENT DEPT
651 Pine Street
4th Floor, North ming, _
Martinez, CA 94553. 0095
RE: Sea Breeze, Hill 410 Contour Grading K
Dear Byran:
As discussed today, our project manager intends to round off the f
portion of the hill by the water tanks at the same time we finish
grade the lots to Phase 4. This will occur within the next 4-6
weeks.
If you have any questions, please do not hesitate to contact me.