Loading...
HomeMy WebLinkAboutMINUTES - 11191996 - C141 TO: BOARD OF SUPERVISORS FROM: J. MICHAEL WALFORD, PUBLIC WORKS DIRECTOR DATE: November 19, 1996 SUBJECT: Determine the Need to Continue the Emergency Action Regarding the Repair of"Hill 310" Land Creep, Bay Point Project No.: 4500-6G5094 SPECIFIC REQUEST(S)OR RECOMMENDATION(S)&BACKGROUND AND JUSTIFICATION I. Recommended Action: DETERMINE that there is a need to continue the emergency action taken by the Board of Supervisors on June 4, 1996 pursuant to Public Contract Code Sections 22035 and 22050, to repair the "Hill 310" Land Creep, Bay Point. II. Financial Impact: Total cost of repairs cannot be fully determined at this time, but staff is developing an estimate for completion of the repair. III. Reasons for Recommendations and Background: A. On February 26, 1996, Public Works and Building Inspection were notified that cracks were occurring in Beaulieu Court. The County hired a geotechnical firm to identify the cause of the slide, and recommend and direct remedial actions to mitigate land movement. B. On March 19, 1996 the Board of Supervisors concurred in the County Administrator's proclamation of a local emergency. C. On June 4, 1996 the Board of Supervisors declared an emergency and authorized the Public Works Director to proceed in the most expeditious manner to repair the area subject to creep. Continued on Attachment: X SIGNATURE: _RECOMMENDATION OF COUNTY ADMINISTRATOR RECOMMENDATION OF BOARD COMMITTEE APPROVE —OTHER SIGNATURE(S): ACTION OF BOARD ON //-/9'/ 579(o APPROVED AS RECOMMENDED_OTHER VOT OF SUPERVISORS UNANIMOUS (ABSENT AYES: NOES: ABSENT: ABSTAIN: JPM:tt g\const\BO\H310-19.t11 Orig.Div: Public Works(Construction) Contact: Joseph P.Murphy(313-2320) 1 ItarebY t take an this is a true and corred 00p�►of tett soon token and entered cn the minutes oi'tllt♦ cc: CAO Boats of S pervisors on the r hown. Auditor/Controller / TEpjtt-+, , �'• 9 9�0 County Counsel PHIL BATCHELOR,C: ;:; board GMEDA of Supervisors and County i.JIMInlstrata Design Div. Construction Div. Maintenance Div. 11 Ddtermine the Need to Continue the Emergency Action Regarding the Repair of"Hill 310"Land Creep November 19, 1996 Page Two III. Reasons for Recommendations and Background (cont'd): D. Repair status: 1. Ford Construction Company, Inc. is under contract to complete the first phase of the repair consisting of an earth buttress. Work began on September 3, 1996 and is expected to be completed by mid-November. 2. Judd Drilling is under contract to complete the second phase of the repair consisting of a drainage gallery. This work began September 25, 1996 and is expected to be completed by mid-December. IV. Consequences of Negative Action: Repair work would not be completed before next winter.