HomeMy WebLinkAboutMINUTES - 10081996 - C10 TO: BOARD OF SUPERVISORS, AS THE GOVERNING BODY OF THE CONTRA COSTA COUNTY FLOOD CONTROL AND WATER CONSERVATION DISTRICT FROM: J. MICHAEL WALFORD, CHIEF ENGINEER DATE: October 8, 1996 SUBJECT: Approval of Contract Change Order No. 3 for the D.A. 76 Miranda Creek Improvement project, Project No. 7542-6D8563-95 Specific Request(s) or ecommen a Ions Background us I fca fon I. Recommended Action: APPROVE Contract Change Order No. 3 in the approximate amount of $33,000.00, and AUTHORIZE the Chief Engineer to execute it in order to compensate the contractor, William G. Mc Cullough Company for unforseen repair of Bunce Meadows Drive damaged by construction traffic. ll. Financial Impact: The project contingency funds are sufficient to cover the change order costs. The source of funds is Drainage Area 76. III. Reasons for Recommendations and Background: The cumulative total of Contract Change Orders Nos. 1 through 3 exceeds $25,000.00, requiring Board approval. The project was designed to overlay Bunce Meadows Drive to mitigate road damages caused by construction traffic. Road damages exceeded expectation and removal and replacement of the pavement as well as base failure repairs were required. IV. Consequences of Negative Action: The lack of approval would preclude payment for work that was performed in good faith. Continued on attachment: _yes SIGNATURE: RECOMMENDATION OF COUNTY ADMINISTRATOR RECOMMENDATION OF BOARD COMMITTEE APPROVE OTHER SIGNATURE(S): ACTION OF BOARD ON: OCT a 8 SM APPROVED AS RECOMMENDED OTHER VOTE,OF SUPERVISORS W-1 UNANIMOUS (ABSENT AYES: NOES: ABSENT: ABSTAIN: Contact: Joseph P. Murphy, (510) 313-2321 Orig. Div.: PW(Constr) cc: County Administrator Auditor-Controller I hereby Certfj'5rt Ns is a true and correct copy of Public Works an acticn i. .' n;c :ho minutes of the - Accounting, R.Gilchrist Board of Super. o - Construction, R. Bruno Arr STED: __.ff ,h, -, lt PHIL BATCHELCR,c,t rk of the board - Design of Supervisors and county Adn-dril trator Contractor _ g:1CONST\BOtD76-8.tl 0 0 l