HomeMy WebLinkAboutMINUTES - 01091996 - C11 TO: BOARD OF SUPERVISORS, AS THE GOVERNING BODY OF THE CONTRA COSTA
COUNTY FLOOD CONTROL AND WATER CONSERVATION DISTRICT
FROM: J. MICHAEL WALFORD, CHIEF ENGINEER
DATE: January 9, 1996
SUBJECT: Approve Plans and Specifications and Advertise for bids for the Bettencourt Basin
Mitigation Planting Project
Project No. '-7581-6D8485-95
Specific Request(s) or Recommendation(s) & Background & Justification
I. RECOMMENDED ACTION:
APPROVE the Plans and Specifications for the Project and
ADVERTISE for bids to be received on Tuesday, February 6, 1996, at 2:00 p.m.
DIRECT the Clerk of the Board to publish the Notice to Contractors in accordance with Section
21191 of the Public Contract Code.
II. FINANCIAL IMPACT:
The estimated contract cost of the project is $70,000, funded by Drainage Area 101A funds
(100%)
Ill. REASONS FOR RECOMMENDATION/BACKGROUND:
The project is needed to mitigate the loss of vegetation as a result of the Bettencourt Basin project
as directed by the Army Corps of Engineers and California Department of Fish and Game.
The Chief Engineer has filed with the Board of Supervisors the Plans and Specifications for the
project.
Continued on Attachment: X SIGNATURE: I 1
RECOMMENDATION OF COUNTY ADMINISTRATOR
_RECOMMENDATION OF BOARD COMMITTEE
APPROVE _OTHER
SIGNATURE(S):
ACTION OF BOARD ON J",Q1 9� 191Ip APPROVED AS RECOMMENDED ✓OTHER
VOTE OF SUPERVISORS
UNANIMOUS (ABSENT )
AYES: NOES:
ABSENT: ABSTAIN:
BF:jlg
c\BO:bo7nov.t11 I hereby certify that this is a true and correct copy of
an action taken and entorod on the minutes of the
Orig.Div: Public Works(Design Division) Board of Super Isors on tho date Show
Contact:: Bill Fernandez(313-2294) ATTESTED:
cc: County Administrator PHIL B CHELOR, crk of the Boar
of Supervisors and C my Administrator
Attn: E.Kuevor
Auditor-Controller `
PW Accounting gy Deputy
Construction
Community Development
Approve Plans and Specifications and Advertise for bids for the Bettencourt Basin Mitigation Planting
Project
January 9, 1996
Page 2
The general prevailing rates of wages, which shall be the minimum rates paid on this project, have
been filed with the Clerk of the Board and copies will be made available to any interested party
upon request.
The Board reviewed and approved the project in May, 1988 and certified that the Negative
Declaration for the project was completed in compliance with the California Environmental Quality
Act, that the Negative Declaration was presented to the Board and the Board reviewed and
considered the information contained in it, and found that the project will have certain
environmental effects and adopted the findings and mitigation measures which will mitigate those
effects.
A Notice of Determination was filed with the County Clerk in May 1988.
IV. CONSEQUENCES OF NEGATIVE ACTION:
If the project is not approved for advertising, the requirement to revegetate as directed by the
Army Corps of Engineers and Department of Fish and Game will not be fulfilled.