TO: BOARD OF SUPERVISORS
FROM: J. MICHAEL WALFORD, PUBLIC WORKS DIRECTOR
DATE: February 27, 1996
SUBJECT: Approve Consulting Services Agreement with Corrosion Failure Analysis and Control for
Investigation for the Vasco Road Replacement Project.
Project No.: -.4663r6X4256: -
SPECIFIC REQUEST(S)OR RECOMMENDATION(S)&BACKGROUND AND JUSTIFICATION
I. Recomn3ended Action:
APPROVE and AUTHORIZE the Public Works Director to execute the Consulting Services
Agreement with Corrosion Failure Analysis and Control to provide an analysis, recommendations
and inspection of the above referenced project.
II. Financiallmpact:
The maximum amount of the contract is $10,000 funded by Contra Costa Water District (100%).
III. Reasons for Recommendations and Background:
Corrosive material was used in the construction of the Water District's Vasco Road Replacement
Project. The Water District is currently investigating the effects of this material on all elements of
the project. Since the County is eventually to take over this road, we are recommending hiring
this consultant to monitor the Water District's evaluation and remediation methods.
IV. Consequences of Negative Action:
If this recommendation is not approved, the County will not have an independent check of the
Water District's proposed remediation methods.
Continued on Attachment:_ SIGNATURE:
RECOMMENDATION OF COUNTY ADMINISTRATOR
RECOMMENDATION OF BOARD COMMITTEE
APPROVE _OTHER
SIGNATURE(S):
ACTION OF BOARD ON 02/27/1996 APPROVED AS RECOMMENDED X OTHER
VOTE OF SUPERVISORS
X UNANIMOUS (ABSENT )
AYES: NOES:
ABSENT: ABSTAIN:
KEJIg
g:\design\bo\bo27d.t2
1 hereby crrtify that this Is a true and correct copy of
an action taken and entered on the minutes of the
Contact: Denis Regan, (313-2232) Board of Supervisors on the date shown.
Orig. Div: Public Works (Design Division) ATTESTED: FEBRUARY 27, 1996
PHIL BATCHELC:P: cicrk of the Board
cc: Auditor Controller of Supervisors and county Administrator
E. Kuevor, CAO `
P.W. Accounting By Deputy