Loading...
HomeMy WebLinkAboutMINUTES - 11141995 - C84 TO: BOARD OF SUPERVISORS FROM: J. MICHAEL WALFORD, PUBLIC WORKS DIRECTOR DATE: NOVEMBER.14, 1995 SUBJECT: APPROVE CONTRACT WITH LUHDORFF AND SCALMANINI FOR DESIGN AND CONSTRUCTION-ENGINEERING SERVICES FOR REPLACEMENT OF WATER WELL 1B, DISCOVER BAY AREA. Project No. 7393-6X9E89 Specific Request(s)or Recommendation(s)&Background&Justification I. Recommended Action: APPROVE and AUTHORIZE the Public Works Director to execute a contract with Luhdorff and Scalmanini for design and construction engineering services for replacement of Water Well No. lb, Discovery Bay area. II. Financial Impact: There will be no impact to the County General Fund. The cost of the well, up to $475,000 will be funded by Centex Homes, however, Centex Homes will have no obligation beyond $475,000. Sanitation District No. 19 funds will have to be used to cover any overage in costs or the construction of a second well if the new well becomes contaminated or yields an insufficient amount of water. III. Reasons for Recommendations and Background: Water Well No. la has been deteriorating for many years and its failure could occur at any time. For that reason time is of the essence to approve the contract with Luhdorff and Scalmanini. This contract is,for design and engineering services for the replacement of Water Well No. la with Water Well No. lb.( Water Well No. 5 was just taken out of service because of poor water quality due to sand infiltration and will be down for an undetermined period of time. This places Water Well No. la in the precarious position of being the primary back-up well for peak demand and emergency water flow for fire protection. Continued on attachment: X yes SIGNATURE:_,e, RECOMMENDATION OF COUNTY ADMINISTRATOR RECOMMENDATION OF BOARD COMMITTEE APPROVE OTHER SIGNATURE(S): ACTION OF BOARD ON: II trvH_A-yLt -tom. I' _ _I APPROVED AS RECOMMENDED y OTHER VOTE OF SUPERVISORS ✓ UNANIMOUS (ABSENT ) AYES: NOES: ABSENT: ABSTAIN: 1 hereby certify that this M a true and Correct copy of SE:pe an action taken and entered on the minutes of the g:\EngSvc\SpDist\BO\SD19 WW 14.t11 Board of Supervisors on the data shown. Contact: Skip Epperly,(510)313-2253 ATTESTED: �4 A-u a. 1 xo w 14, 1 q qs Orig.Div.: PW(Special Districts) PHIL BATCHELOR,Clerk of the Efoard cc: Auditor-Controller of Supervisors and County Administrator Public Works- Accounting Construction Delta Diablo Sanitation District �. _,Deputy APPROVE CONTRACT WITH LUHDORFF AND SCALMANINI NOVEMBER 14, 1995 PAGE TWO III. Reasons for Recommendations and Background: (Continued) The Board of Supervisors approved Amendment No. 2 to the Centex Agreement on November 7, 1995, authorizing the funding for Water Well lb. This Board action enables the District to fund the new well and to proceed with design and bid preparation for the construction for Water Well lb. IV. Consequences of Negative Action: Without Board approval the contract for design and construction engineering cannot proceed for the replacement of critically needed water well facilities.