Loading...
HomeMy WebLinkAboutMINUTES - 10101995 - C45 E.s....`..,,° TO: BOARD OF SUPERVISORS Contra� �" Costa FROM: HARVEY E. BRAGDON COUnty DIRECTOR OF COMMUNITY DEVELOPMENT `~, %� SrA-c--riTl DATE : October 10, 1995 SUBJECT': Ratification of the Zoning Administrator's Decision Regarding Shell Oil Company's Compliance with Conditions of Approval (LUP 2009-92) SPECIFIC REQUEST (S) OR RECOMMENDATIONS) & BACKGROUND AND JUSTIFICATION RECOMMENDATIONS Ratify the Zoning Administrator' s decision that Shell Oil Company has complied with Condition of Approval 422 for the Cogeneration Unit. FISCAL IMPACT None. BACKGROUND/REASONS FOR RECOMMENDATIONS When the Board of Supervisors approved the Land Use Permit for Shell Oil Company' s Clean Fuels Project (County LUP 42009-92) , the Board specified that the Zoning Administrator' s decision regarding several conditions of approval be placed on the Board' s consent calendar for ratification. As directed by the Board at the October 4, 1994 meeting, the County Zoning Administrator' s decision discussed herein has been placed on the Zoning Administrator' s agenda for October 9, 1995 . Any comments received at t e meeting will be forwarded to the Board. CONTINUED ON ATTACHMENT: XX YES SIGNATU RECOMMENDATION OF COUNTY ADMINISTRATOR RECOMMENDATION O BOARD COMMITTEE APPROVE OTHER SIGNATURE (S) ACTION OF BOARD ON October 10 , 1995 APPROVED AS RECOMMENDED _x OTHER VOTE OF SUPERVISORS I HEREBY CERTIFY THAT THIS IS A x UNANIMOUS (ABSENT 3 TRUE AND CORRECT COPY OF AN AYES: NOES : ACTION TAKEN AND ENTERED ON THE ABSENT: ABSTAIN: MINUTES OF THE BOARD OF SUPERVISORS ON THE DATE SHOWN. Contact: Catherine Kutsuris (510/646-2036) ATTESTED October 10 , 1995 cc: Community Development Department (CDD) PHIL BATCHELOR, CLERK OF Health Services Department : RMPP THE BOARD OF SUPERVISORS Shell Oil (via CDD) AND COUNTY ADMINISTRATOR BY of i Z� , DEPUTY CK:db c:shl.bo3 a:ck1/drb/sh1.bo3 Ratification of decision on Shell Oil Company August 1, 1995 Page Two Condition of Approval #22 : Hazard and Operability Study This condition requires Shell Oil to prepare a Hazard and Operability Study and Accident Consequence Analysis for all elements of the Clean Fuels Project with the exception of the office building, the control rooms and the maintenance/warehouse buildings . Shell Oil Company completed the required study for the Cogeneration Unit (also referred to as the Boiler 6 Plant) . This information was evaluated by the Risk Management and Prevention Program Team of the Health Services Department . Their review included a detailed examination of the hazard analyses and off-site consequences as well as scrutiny of all the programs or aspects of the Company (e. g. , operating procedures, preventive maintenance programs and operator training) which are designed to prevent or mitigate accidents or process anomalies . The review included document assessments, management and operations personnel interviews and inspection of the unit to verify that it conforms to the design presented. The Health Services Department concluded that the Shell Hazard and Operability Study/Accident Consequence Analysis adequately identifies process hazards and that no additional mitigation should be required. The Health Services Department will conduct follow-up field inspections to ensure that construction conforms to the design specified, and that all measures identified have been followed. Contra Costa County Jr n. �s Health Services Department ENVIRONMENTAL HEALTH DIVISION sT.......`. HAZARDOUS MATERIALS/OCCUPATIONAL HEALTH DATE: September 15, 1995 TO: Catherine Kutsuri ounty Zoning Administrator, Community Development Department FROM: Lewis G. ascalli, Deputy Dir Health Services Dep me , azardous Materials Division SUBJECT: CONSENT ITEM FOR SHELL REFINERY CLEAN FUELS PROJECT CONDITION#22, FOR THE COGENERATION UNIT Executive Summary: The Contra Costa County Health Services Department (CCCHSD) Hazardous Materials Risk Management and Prevention Program team has completed the Clean Fuels Project review for the Cogeneration Unit. Shell plans to start-up the Cogeneration Unit about November 6, 1995. Shell submitted a summary of the Hazard and Operability Study(HAZOP)to you and CCCHSD on August 21, 1995. Process Description: The Cogeneration Unit will produce electricity and steam for the Martinez Manufacturing Complex MMC). The unit consists of a 20 megawatt (MW) steam turbine generator (STG) and two identical 40 MW gas turbine generators(GTG) each coupled with a heat recovery steam generator (HSRG) for combined power generation capability of 100 MW. Each HSRG is design to produce 300,000 Lbs per hour of 650 psig steam. Each GTG is design to burn 100 % natural gas, natural gas combined with MMC produced fuels, and can burn 100 %propane during a natural gas curtailment. All the electricity and steam produced by the Cogeneration Unit will be consumed internally by the MCC. CCCHSD Findings: My staff has performed a detailed fine-by-line examination of the Cogeneration Unit HAZOP study that included our reviewing the design of safety systems as well as operational and maintenance issues. Additionally, my staff has field checked the unit, which is still under construction, to verify that it basically conforms to the design presented in the HAZOP. 4333.PacFieco Bculeward • Martinez, Galifomta.94553 • (51U} 646yf86 _a �,s I I I i We find that the Shell HAZOP adequately identifies process hazards and that no mitigations other than those identified by Shell are required. My staff will perform a follow up review, consistent with Condition #23 of;the Land Use Permit, to ensure that all mitigations identified have been implemented. Conclusion: We recommend approval of the HAZOP study for the Cogeneration Unit. I i I i I I I I