Loading...
HomeMy WebLinkAboutMINUTES - 02281995 - H.7 s E..t • Contra ' : Costa 0; :n,,au ;''s County TO: BOARD OF SUPERVISORS FROM: °os `- HARVEY E. BRAGDON r��cotin`�';�� DIRECTOR OF COMMUNITY DEVELOPMENT DATE: February 14, 1995 SUBJECT: Reconsideration Hearing on Development Plan 3001-93 Arthur Anderson (Applicant and Owner) to Construct an Automotive Oil/Lube Facility in the Alamo Area. SPECIFIC REQUEST(S) OR RECOMMENDATIONS) & BACKGROUND AND JUSTIFICATION RECOMMENDATIONS OPTION A. 1. Accept the environmental documentation prepared for this project as being adequate. 2 . Adopt the mitigation monitoring program prepared for this project. 3 . Approve the project with the addition of Condition of Approval #15 and the recommended conditions of approval, which includes installing traffic bars on a interim basis. 4 . Adopt the findings provided in the Board of Supervisors packet of December 2-0,, 1994. OPTION B. 1. Accept the environmental documentation prepared for this project as being adequate`. .2 . Adopt the mitigation monitoring program prepared for+ this project. CONTINUED ON ATTACHMENT: X YES SIGNATURE RECOMMENDATION OF COUNTY ADMINISTRATOR RECOMMENDATION OF BOARD COMMITT9E APPROVE OTHER SIGNATURE(S) : ACTION OF BOARD ON February 28, 1995 APPROVED AS RECOMMENDED OTHER x See Addendum for Board votes and action VOTE OF SUPERVISORS I HEREBY CERTIFY THAT THIS IS A UNANIMOUS (ABSENT TRUE AND CORRECT COPY OF AN AYES: NOES: ACTION TAKEN AND ENTERED ON THE ABSENT: ABSTAIN: MINUTES OF THE BOARD OF SUPERVISORS ON THE DATE SHOWN. Contact:Debbie Chamberlain - 646-2031 Orig: Community Development Department ATTESTED February 28, 1995 ac: PHIL BATCHELOR, CLERK OF Public Works THE BOARD OF SUPERVISORS Arthur Anderson D CO TTY ADMINISTRATOR BY , DEPUTY 2 3 . Approve the project as in Option A with the recommended conditions of approval, addition of Condition of Approval #15, installation of traffic bars on a interim basis, and also require a contribution towards the ultimate intersection improvement. 4. Adopt the findings provided in the Board of Supervisor's packet of December 20, 1994. OPTION C 1. Accept the environmental- documentation prepared for this project as being adequate. 2 . Adopt the mitigation monitoring program prepared for this project. 3 . Approve the project with the addition of Condition of Approval #15 and modifications to the Public Works Conditions of Approval requiring the applicant to construct the southeast return of Stone Valley Boulevard to its ultimate configura- tion. 4. Adopt the findings provided in the Board of Supervisor's packet of December 20, 1994. OPTION D 1. Reverse the Board's January 17, 1995 decision, and deny the project. FISCAL IMPACT None. BACKGROUND/REASONS FOR RECOMMENDATIONS On January 17, 1995 the Board of Supervisors approved Development Plan 3001-93 to establish an automotive oil/lube facility. Subsequently, it was brought to the attention of the Public Works Department, that the traffic counts presented to 'the Board were not representative' of existing conditions. On January 31, 1995, the Board voted to reconsider their decision because 1991 traffic counts were represented as existing conditions and current traffic counts for the Stone Valley/Danville Boulevard intersection were not available to the Board at the time of their decision. Furthermore, at the January 17, 1995 Board meeting, staff responded to questions raised by the Board Members on alternative uses for the site. Staff indicated that the configuration of the site would limit the number of potential uses, with parking being the primary concern. Subsequently, a meeting occurred with Supervisor Bishop's staff, the Public Works Department, the applicant and an AIA representa- tive. Staff was requested to provide the following information: 1. Alternative uses for the site. 2. Project impact on the proposed trail along the creek. 3 . What is the acceptable level of service (LOS) at the intersec- tion? 4. What is the current level of service at the intersection? 3 5. Why is the level of service in the Tri-Valley Transportation Council (TVTC) model worse than the level of service calcula- tions by County Staff? 1. Alternative Uses for the Site. General Uses The subject property is governed by the Retail-Business ordinance (R-B) (see Exhibit 1) . Briefly, uses permitted in the R-B district include the sale of retail goods, uses permitted in the single family and two family districts, hotels and motels. Additionally, the ordinance identifies a range of land uses permitted after the issuance of a land use permit. Those uses include lumber, cabinet; or sheet metal shop, animal hospital, dog kennel, auto garage, building contractor's yard, other businesses where sales, demon- strations, displays and services and other activities are conducted in other than in an enclosed area, various types of manufacturing and uses permitted in the single family and two family districts after the granting of a land use permit. Proposed Site The subject property is a long east/west and relatively narrow north/south parcel, in an irregular shape, with a relatively large trapezoid at the east and smaller narrow panhandle to the west extending along Stone Valley Road to Danville Boulevard. The site is approximately 34,800 square feet in size with an useable area of approximately 8, 000 ,square feet. The parcel is limited to 8, 000 square feet due to the location of San Ramon Creek, creek structure setback, Flood Control maintenance easement, 5-foot dedication for the widening of Stone Valley Road, and the -23-foot wide panhandle. Development Requirements The Retail-Business Ordinance requires a 10-foot setback from any roadway, and has no provision for a side or rearyard setback. Additionally, the Off-street Parking Ordinance requires one parking space for every 250 square feet of retail space and one parking space for every 200 square feet of office space, with the latter being more restrictive. Furthermore, depending on the angle of parking (e.g. , 450 , 600 , 900 , etc. ) the required dimensions for the parking spaces and driveway/backup areas will vary (see Exhibit 2) . Site Design As discussed previously, the useable area of the subject property is approximately 8, 000 square feet. Because the site is so restricted, there are a limited number of uses that the site could accommodate. In staff's opinion and review of the Ordinance Code, the following uses may be viable for the site. Use #1: Medical/Dental Office/Animal Hospital ■ Parking Requirements: 5 spaces for each doctor. ■ Limitations: The five required parking spaces would restrict the use of the building to one doc- tor. ■ Site Design: The orientation of the building is not of concern. The required number of parking spaces would limit the use of the bridling to one doctor. Use #2 : Publicly owned park/playground ■ Parking Requirements: The code does not expressly state a minimum number of spaces, but 3 - 5 parking spaces should be considered. 4 ■ Limitations: The park would be located adjacent to San Ramon Creek, I-680 on-ramp and Stone Valley Road. The park would be limited to kids play area (e.g. , play structures) . or passive recreation (e.g. , trail head, picnic benches, barbecues) . Safety and noise impacts would be a concern with this use. ■ Site Desicrn: Access to the site could be from the western portion of the panhandle, with a one way direction, exiting at the eastern most portion of the .panhandle. Approximately three parking spaces could be accommodated along the northern boundary of the panhandle, while providing a 16-foot drive- way. The park would then be accommodated in the rectangular portion of the site, east of the pan- handle. Use #3 : Office: ■ Parking Requirements: - One space every 200 square feet. ■ Limitations: The configuration of the site would permit a building ranging in size from 800 - 1,200 square feet in size, with a requirement of four to five parking spaces. ■ Site Design: A building could be oriented in an east/west or a north/south direction, with access provided in a similar manner to the proposed pro- ject. To accommodate a building larger than 1, 000 square feet parking would be necessary along the panhandle. Use #4 Retail: ■ Parking Requirements: - One. space every 250 square feet. ■ Limitations: Similar to office use. ■ Site Design: Similar to office use. Use #5 Building Contractor's Yard: ■ Parking Requirements: - One parking space for each two employees. ■ Limitations: No fixed structures, with the excep- tion of a small office or caretaker trailer. ■ Site Design: A solid six-foot fence would be required along the perimeter of the site. The majority of- the site would be left open to allow the contractor to maximize the material storage area. Materials should not exceed a stacked height of six feet. 2. Project Zmpact on the Proposed Trail along the Creek. On January 3.0, 1995, staff field reviewed other recent projects on San Ramon Creek and neighboring properties to determine the feasibility of installing a trail along the top of the creek bank. From the field review, it appeared it would be difficult to install a trail on the west side of San Ramon Creek in the vicinity of this project. The Alamo Park and Recreation District R7A, is currently reviewing the "San Ramon Creek Greenbelt and Parkway Study" that identifies a trail on either side of San Ramon Creek. In other words, the study does not identify a preference for the east or 5 west side of the creek. A recent project upstream of the automotive oil/lube facility project was required to work with R7A to develop a trail easement. The applicant has indicated his support to work with R7A to identify :a trail on the project site. This requirement is reflected in Condition of Approval #14 . t 3. What lis the acceptable level of service (LOS) at the intersec- tion? Background• i There are two things to consider when determining what is the appropriate level of service for an intersection;, a. !What is the type of land use in the area of the intersec- tion, as indicated in table 4-1 and Figure 4-2 of the ;general plan? b. !Is the intersection located on a basic route or a route of regional significance? Table 4-1 of the general plan relates the level of service performance standard to the intensity of the surrounding land use, ' For example, an intersection in a rural area has a LOS C ds� its performance standard, while a central business distr�ic:t has a LOS E as its performance standard. As the inteinsi.ty of development increases from rural to urban, the performance standard is adjusted to allow for more congestion. Figure 4-2 in the general plan is a map of the county showing which areas are . rural, suburban, urban or central business district. By relating the land use shown on Figure 4-2 with the performance standards on Table 4-1, the appropriate level of service can be determined. Figure 4-2 in the general plan shows this intersection is in an urban area. Intersections in urban areas are allowed to operate up to LOS D, with a maximum volume to capacity ratio of .89, and still satisfy Measure C. The intersection could even exceed the level of service standard provided the County has a project in the Capital Improvement . program that will improve the intersection within five years. The above level of service performance standards would apply for basic routes but not. for routes of regional significance. If an intersec- tion is located on a'-route of regional significance, then the LOS performance standards in Table 4-1 do not apply. The performance standard for routes of regional significance will be designated by the Action Plan for that regional route. Danville Boulevard is designated as a route of regional significance by the Contra Costa Transportation Authority (CCTA) . The draft action Plan for the TVTC region calls for a volume to capacity ratio of 0.90 or better for the year 2010. A volume to capacity ratio of '.90 is technically LOS E, since LOS E ranges from .90 to .99. However , since .89 and .90 are on the borderline between LOS D and E, the practical maximum level of service for this intersection is LOS D. Conclusion . If the action plan is approved as currently drafted, the performance standard for this intersection would be a volume to capacity ratio of .90 which is between LOS D and LOS E. 4. What is the current level of service at the intersection? Background Public Works staff took turning movement counts at the intersection on February 7, 1995. Turning movement counts were also taken on February 15, 1995 to allow the community an opportunity to " observe our traffic counting procedures. Turning movement counts are the detailed data needed to calculate the level of service at a signalized intersection. The process entails engineering technicians visiting the intersection during the a.m. peak commute period and the p.m. peak commute period. The technicians count the number of cars making each turning movement. For example, in the eastbound direction on Stone Valley Road, the cars turning right would be counted as well ' as the cars going through and the cars turning left. This would be done for westbound Stone Valley Road in addition to north and southbound Danville Boulevard for a total of twelve different movements. In addition to counting the turning movements, we put automated traffic counters on each approach to the intersection. This consisted of putting rubber tubes and counters across Stone Valley Road and Danville Boulevard in each direction before the intersec- tion. The counters gave us total numbers of vehicles in each direction which enabled us to double check the data from the turning movement counts in the intersection. We also timed the delay for each turning movement in the intersection. This entailed an Engineering Technician repeatedly driving through the intersection with a stop watch. The delay is the time the vehicle was actually stopped while going through the intersec- tion making any one of the twelve movements. The delay time data also helps to validate the level of service calculations. After collecting the turning movement counts, staff input the data into a computer program developed by the Contra Costa Transportation Authority (CCTA) for determining the level of service at a signalized intersection. Included in this Board Order as Exhibit 3, is the computer printout showing the traffic: turning movement data and the level of service for February 15, 1995, in addition to previous count dates. The results are summarized in the table below. LEVEL OF SERVICE SUMMARY TABLE Date 2/15/95 2/7/95 Ir 9/8/93 7/18/91 12/12/89* Time AM PM AM PM AM PM AM PM AM PM LOS B C A C B D A B B D V/C 0.66 0.70 0.59 0.79 0.64 0.81 0.47 0.69 0.65 0.82 *Traffic counts from TVTC and adjusted using corrected lane configurations LOS = Level of Service V/C = Volume• to capacity ratio LOS A B C D E F V/C less .60-.69 .70-.79 .80-.89 .90-.99 1.00+ than .59 In reviewing the above summary table it can be .concluded that the level of service in the morning commute is B to C and in the afternoon commute is C to D. Some Alamo residents who drive through this intersection may perceive the intersection as operating at a more congested level. This may be due to unbalanced delays experienced at the intersection. In reviewing the delay time data, it appears that some turning movements are experiencing a much longer delay than other movements. This is partly due to the relatively long cycle length of the signal. Public Works staff will experiment with the signal timing so that the delay is more evenly distribut- ed. This will reduce the disproportionately long delays now occurring at a couple of turning movements, which dives the perception that the overall intersection is operating worse than it is. This intersection is currently operating within the perfor- mance standards required by Measure C. There are over 2500 movements or trips through the intersection during the morning and afternoon peak periods. The proposed project will add 9 trips in and out for a total of 18 trips through the intersec- tion, assuming each customer goes through the intersection twice. Adding 18 more tris through the intersection is less than a 1% increase and will not be noticeable. The added trips from the proposed project would not change the level of service at the intersection. It should be noted that the level of service on any particular day can be influenced by many factors, such as the weather, the day of the week, the time of year, special days (Holidays, etc. ) , accidents or road work on I-680, sales at the retail stores in the area, and capacity improvements to I-680. 6 Conclusion a. The current level of service in the morning . commute period is LOS B or LOS C, and in the afternoon commute period is LOS C or LOS D. b. Public Works will also adjust the signal timing to reduce the disproportionately long delay experienced in some of the turning movements. c. This intersection is currently operating within the Measure C guidelines. The traffic added by this project will not significantly change the current traffic service levels. 5. Why is the level of service in the Tri-Valley Transportation Council (TVTC) model worse than the level of service calculat- ed by County staff? Background Public Works staff obtained a copy of the level of service calculations for the intersection from Barton Aschman, the consultants preparing the Tri-Valley Transportation Council model. Their calculations indicated the level of service for the a.m.. peak hour was LOS C and for the p.m. peak hour was LOS E. A copy is attached for reference. Their traffic counts were taken in December of 1989. In .reviewing their computer printout, County staff discovered some errors in the data input for the configuration of the intersection. When traffic count data is entered into the computer program for each turning movement, the programmer must also assign a descriptor that tells the computer the lane configuration of that turning movement. Based on the lane configuration descriptor, the computer will assign a capacity to that turning movement. For example, a right turn lane controlled by a signal, where a car must stop before turning right, has less capacity than a free right turn that is not controlled by a signal. Each of these two right turn lane configurations has a different descriptor. The descriptor for the right turn lane controlled by a signal tells the computer there is less capacity in that turning movement than a turning movement for a free right turn not controlled by a signal. The descriptors are similar to settings on a lawn sprinkler, where different settings let different volumes of water emanate from the sprinkler. The descriptors tell the computer the relative capacity for the various lane configurations. In reviewing the computer printout from Barton Aschman it turns out they assigned lower capacity descriptors on a couple of the turning movements. For example, Stone Valley Road turning right onto northbound Danville Boulevard was assigned a descriptor for a right turn lane controlled by a traffic signal. County staff, however, assigned a descriptor that better reflects the configuration of the intersection, which is a right turn lane not under the control of a signal. County staff then ran the computer program using the traffic turning counts from Barton Aschman with the lane configuration assignments by County staff. The level of service turns out to be LOS D in the afternoon commute, rather than LOS E as calculated by Barton Aschman. When using the correct descript- ors, the TVTC level of service at the intersection is in the same range as that calculated by County staff. Conclusion The level of service calculations performed for the TVTC transportation plan incorrectly described the lane configura- tion while inputing data into the computer program. The result is the calculated LOS is off by one level of service. When County staff ran the TVTC data in the computer using the correct lane configurations, the results were similar to the results of other LOS calculations by County staff. Alternatives There are several alternatives the Board could consider to address the traffic impacts from this development. The primary impact is the conflict of traffic from northbound Danville Boulevard turning right (to the east) and southbound 7 Danville Boulevard turning left (to the east) . The conflict occurs when the traffic from these two turning movements try to access the project site and cross each other. The staff recommendation in the conditions of approval is to install traffic bars along the traffic lane line to separate the two traffic movements. This would be a temporary measure until the intersection improvements are constructed. An alternative would be to require these interim improvements and a cash contribution toward the ultimate intersection improvements above and beyond the Area of Benefit fee. The nexus would be the increased turning movements at the intersection created by the project. Another alternative would be to require the construction of the ultimate curb return and the removal of the small island and relocation of the traffic signal. This would eliminate the free right turn movement at the southeast corner and the conflict between the .two turning movements. The applicant would be reimbursed from Area of Benefit funds for some of these improvements. While this would eliminate the conflict between the turning movements, it would increase the congestion level at the - intersection. The vehicles turning right would have to stop or a red light before turning,, which would result in more vehicles queuing up at the intersection and a longer delay time. Although the level of service performance standard would not be violated, some motorists may notice an increased delay. .The AOB fee is based on the number of p.m. peak hour trips a development generates and is determined by the square footage of the structure unless the actual peak hour trip generation is known. For this developmentthe AOB fee based on the square footage of the structure would be $6600. However, we also know the p.m. peak hour trips generated by this development. , Based upon the peak hour trips, the AOB fee would be $39, 618. The Board may consider a combination of option 1 and 2, under the recommen- dation section of this Board Order, by requiring the mitiga- tion measure in option 1 and payment of the higher AOB fee. 8 ADDENDUM TO ITEM H. 7 FEBRUARY 28, 1995 This is the time heretofore fixed by the Board of Supervisors and noticed by the Clerk of the Boardfor reconsideration of the decision of the Board of Supervisors on the appeal b-y Arthur L. Anderson (appellant) from the decision for denial of the San Ramon Valley Regional Planning Commission on the request (County File #3001-93) by Arthur Anderson (applicant and owner) for approval of a combination development plan/land use permit to establish an automotive lube facility in the Alamo area. Variances are requested to have a roadway setback of 5 feet (10 feet required) and 2 foot landscape planter (4 feet required) and 25 foot backup for parking (28 feet required) . Mitch Avalon, Public Works Department, presented the staff report on the proposal and responded to questions from Supervisor Bishop on the traffic report . The following persons presented testimony: Sanford Skaggs, P.O. Box V, Walnut Creek, representing the applicant; Nancy D. Kaplan, 184 Canyon Vista Place, Danville, representing the Alamo Parks and Recreation Committee (R-7A) and herself; Carol Galvin, 1481 Arbor Lane, . Alamo, representing the Association for the Preservation of Danville Boulevard; Don Copland, 2350 Heritage Oaks Drive, Alamo, representing the Alamo Improvement Association; Ellen Taylor, 35 Alta Sierra Place, Alamo; Wanda Longnecker, 28 Darlene Court, Alamo; Preston Taylor, 35 Alta Sierra Place, Alamo, representing the Stone Valley Road Preservation Association. Sanford Skaggs spoke in rebuttal . The public hearing was closed. The Board discussed the matter. Supervisor Bishop expressed concerns about the traffic in the area and moved to' deny the project . Supervisor Rogers seconded the motion. The vote on the motion was as follows : AYES : Supervisors Rogers and Bishop NOES : Supervisors DeSaulnier, Torlakson and Smith ABSENT: None ABSTAIN: None The motion failed. Supervisor Torlakson moved to reaffirm the original Board position. Supervisor DeSaulnier concurred but to add a condition for architectural review by the Zoning Administrator. Supervisor Torlakson concurred with the addition. Supervisor DeSaulnier seconded the motion. The vote on the motion was as follows : AYES : Supervisors DeSaulnier, Torlakson and Smith NOES : Supervisors Rogers and Bishop ABSENT: None ABSTAIN: None IT IS BY THE BOARD ORDERED that the Board decision of January 17, 1995 is REAFFIRMED for approval of Development Plan 3001-93 , Arthur Anderson (applicant and owner) to construct an automotive oil/lube facility in the Alamo area with an additional condition relative to architectural review by the Zoning Administrator. •CONDITIONS OF APPROVAL FOR DEVELOPMENT PLAN 3001-93 1 . Development of the site shall be as indicated on plans submitted to the Community Development Department and dated received June 1 , 1993. 2. Approval is granted to allow variance(s) as indicated below. The variance(s) meet the requirements of Section 26-2.2006 of the County Ordinance Code: A. 10-feet required by zoning ordinance. 5-feet approved. B. 28-foot back-up required by zoning ordinance. 25-foot back-up approved. C. 4-foot landscape planter required by zoning ordinance. 2-foot landscape planter approved. 3. Prior to issuance of a grading permit or a building permit and an archaeological reconnaissance report shall be prepared and submitted to the Community Development Department. This report shall be prepared by a professional archaeologist who is certified by the Society for the California Archaeology (SCA) and/or the Society of Professional Archaeology (SOPA). If the reconnaissance report confirms the presence of significance archaeological resources, the report shall include a discussion of how impacts to those resources can be avoided. If the report concludes that avoidance is not feasible, the report shall include a plan for mitigating,the effect of the project on the qualities which make that resource important. The plan shall include the elements specified in Appendix K of the "Guidelines for Implementation of the California Environmental Quality Act." The recommendations of the report shall be implemented unless otherwise waived by the Zoning Administrator. 4. Comply with the following construction, noise, dust and litter control requirements: A. Noise generating construction activities, including such things as power generators, shall be limited to the hours of 7:30 A.M. to 5:00 P.M., Monday through Friday, and shall be prohibited on State and Federal holidays. The restrictions on allowed working days may be modified on prior written approval by the Zoning Administrator. B. The project sponsor shall require their contractors and subcontractors to fit all internal combustion engines with mufflers which are in good condition and shall locate stationary noise-generating equipment such as air compressors and concrete pumpers as far away from existing residences as possible. C. At least one week prior to commencement of grading, the applicant shall post the site and mail to the owners of property within 300 feet of the exterior boundary of the project site notice that construction work will commence. The notice shall include a list of contact persons with name, title, phone number and area of responsibility. The person responsible for maintaining the list shall be included. The list shall be kept current at all times and shall consist of 2 persons with authority to indicate and implement corrective action in their area of responsibility. The names of the individual responsible for noise and litter control shall be expressly identified in the notice. The notice shall be reissued with each phase of major grading activity. A copy of the notice shall be concurrently transmitted to the community Development Department. The notice shall be accompanied by a list of the names and addresses of the property owners noticed, and a map identifying the area noticed. D. A dust and litter control program shall be submitted for the review and approval of the Zoning Administrator. Any violation of the approved program or applicable ordinances shall require an immediate work stoppage. Construction work shall not be allowed to resume until, if necessary, an appropriate construction bond has been posted. 5. At least 60 days prior to issuance of Building Inspection Department permit, or installation of improvements or utilities, submit a preliminary geology, soil, and foundation report meeting the requirements of Subdivision Ordinance Section 94-4.420 for review and approval of the Zoning Administrator. Improvement, grading, and building plans shall carry out the recommendations of the approved report. 6. Record a statement to run with deeds to the property acknowledging the approved report by title, author (firm), and date, calling attention to approved recommendations, and noting that the report is available from the seller. 7. Prior to issuance.of a building permit, submit a revised landscape plan, certified by a license architect as being in conformance with the water conservation ordinance for review and approval of the Zoning Administrator. Shrubs a minimum of 5-gallons shall be provided within the landscape planter north of the decorative wall, if feasible. 8. Prior to issuance of a building permit, submit a sign program for review and approval of the Zoning Administrator. The monument shall not exceed 16 square feet in size and shall be limited to one. The building facade sign shall not exceed 12 square feet in size, and shall be placed at least 4-feet below the base of the roof. One facade sign shall be permitted on the north and west facade. 9. Prior to issuance of a building permit, the oil and hazardous collection system submitted with the application shall be submitted for review and approval of the Environmental Health Division. Construction of the system will be to the Best Available Control Technology (BACT) standards as required by the Health Services Department. 10. Prior to issuance of a building permit, submit a revised landscaping plan providing the following: A. Tall shrubs within the 5-foot planter adjacent to Stone Valley Road. 3 B. Provide low-growing shrubs within the 2-foot planter along Stone Valley Road. 1 1 . The exterior colors of the building shall be maltese and fawn. The decorative wall shall be maltese, based on the color schedule submitted to the Community Development Department dated received January 18, 1994. 12. Prior to issuance of a building permit, submit evidence to the Zoning Administrator that the site has been annexed to the Central Sanitary District. 13. The following requirements pertaining to drainage, road, and utility improvements will require the review and approval of the Public Works Department: A. FRONTAGE IMPROVEMENTS 1 ) Construct curb six-foot sidewalk (width measured from curb face), necessary longitudinal and transverse drainage,and necessary pavement widening along the frontage. The face of the curb shall be 40 feet from the centerline of the road, subject to review and approval of the Public Works Director. If this project is constructed before the improvements to the Stone Valley Road/Danville Boulevard intersection, then the frontage improvements will not include the curb return at the intersec- tion. The curb return and elimination of the right turn island will be included with the intersection improvement project. The applicant shall deposit the estimated cost of the frontage improvements along the curb return to the Public Works Department (Trust Fund 8192-0800). 2) Construct the western most driveway at least 30 feet from the curb return at the Danville Boulevard/Stone Valley Road intersection, as shown on the revised site plan. All driveways shall be constructed to accommodate the anticipated road widening. 3) Install "Exit Only/Do Not Enter" signs on each side of the center driveway, subject to the review and approval of the Public Works Department. 4) If this project is constructed prior to the intersection improvements at Stone Valley Road and Danville Boulevard, then the applicant shall install raised traffic bars between the lane lines on eastbound Stone Valley Road from the intersection easterly to a point beyond the driveway project entrance, subject to the review and approval of the Public Works Department. B. ROAD DEDICATIONS 1) Convey to the County, by Offer of Dedication, additional right of way on Stone Valley Road as required for the planned future half-width of 46 feet. 4 2) Convey to the County, by Offer of Dedication, additional right of way on Danville Boulevard as required for the planned future curb return radius of 40 feet. C. STREET LIGHTS 1) Install street lights on Stone Valley Road. The final number and location of the lights shall be determined by the Public Works Department, Engineering Services Division. D. DRAINAGE IMPROVEMENTS 1 ) Division 914 of the Ordinance Code requires conveying of all storm waters entering or originating within the subject property, without diversion and within an adequate storm drainage facility, to a natural watercourse having definable bed and banks or to an existing adequate public storm drainage facility which conveys the storm waters to a natural watercourse. 2) Design and construct storm drainage facilities required by the Ordinance in compliance with the design standards of the Public Works Depart- ment. 3) Install, within a dedicated drainage easement, any portion of the drainage system which conveys run-off from public streets. 4) Mitigate the impact of the additional storm water run-off from this development on San Ramon Creek by: a. Removing 1 cubic yard of channel excavation material from the inadequate portion of San Ramon Creek near Chaney Road for each 50 square feet of new impervious surface area created by the development. All excavated material shall be disposed of off- site by the developer at his cost. The site selection, land rights, and construction staking will be by the Flood Control District. OR.... b. Upon written request, the applicant may make a cash payment of lieu of actual excavation and removal of material from San Ramon Creek. The cash payment will be calculated at the rate of $0.10 per square foot of new impervious surface area created by the development. The added impervious surface area created by the development will be based on the Flood Control District's standard impervious surface area ordinance. The Flood Control District will use these funds to work on San Ramon Creek annually. 5 5) Execute a Joint Use Agreement with the Flood Control District for installation of parking stalls or other improvements within the San Ramon Creek Flood Easement. The Agreement shall state that the developer and the owner and the future owners of the property will hold harmless Contra Costa County and the Flood Control District in the event of damage to the development as a result of creek-bank failure or erosion. In addition, the Agreement shall state that the correction of any damage along the creek bank resulting from this development shall be the sole responsibility of the owner and future owners of the subject property, subject to the review and approval of the Flood control District. E. GENERAL REQUIREMENTS 1 ) Submit improvement plans prepared by a registered civil engineer, review and inspection fees, and security for all improvements required by the Ordinance Code or the conditions of approval for this subdivision. These plans shall include any necessary traffic signage and striping plans for review by the County Public Works Department, Road Engineering Division. 2) Prevent storm drainage, originating on the property and conveyed in a concentrated manner, from draining across the sidewalks and drive- ways. 3) Provide for adequate sight distance at each driveway, subject to the review and approval of the Public Works Department. No obstruction to the line of sight shall be allowed on the subject property. 4) On all public roads with longitudinal slopes less than five percent, all public pedestrian access ways shall be designed in accordance with Title 24 (Handicap access). This shall include all driveway depressions as well as handicap ramps. 5) Install all new utility distribution services underground. 6) Verify that all finished floor elevations are above the 100-year flood elevation. 14. Applicant shall work with County Service Area R-7A to develop a trail easement in accordance with the San Ramon Greenbelt and Parkway Study. If the trail alignment is on the west side of San Ramon Creek, then the back up area for the employee parking may be reduced to 24 feet in order to preserve a 4-foot wide trail easement along the top of the creek bank. The plan for the parking and trail shall be subject to the review and approval of the Zoning Administrator. 6 15. Pursuant to Government Code Section 66474.9, the applicant (including the subdivider or any agent thereof) shall defend, indemnify, and hold harmless the Contra Costa County Planning Agency and its agents, officers, and employees from any claim, action, or proceeding against the Agency (the County) or its agents, officers, or employees to attack, set aside, void, or annul, the Agency's approval concerning this subdivision map application, which action is brought within the time period provided for in Section 66499.37. The County will promptly notify the subdivider of any such claim, action, or proceeding and cooperate fully in the defense. ADVISORY NOTES PLEASE NOTE ADVISORY NOTES ARE ATTACHED TO THE CONDITIONS OF APPROVAL BUT ARE NOT A PART OF THE CONDITIONS OF APPROVAL, ADVISORY NOTES ARE PROVIDED FOR THE PURPOSE OF INFORMING THE APPLICANT OF ADDITIONAL ORDINANCE REQUIREMENTS THAT MUST BE MET IN ORDER TO PROCEED WITH DEVELOPMENT. A. The project lies within the 100-year flood boundary as designated on the Federal Emergency Flood Rate Maps. The applicant should be aware of the requirements of the Federal Flood Insurance Program and the County Flood Plain Management Ordinance (Ordinance No. 90-118) as they pertain to future construction of any structures on this property. B. This project may be subject to the requirements of the Department of Fish & Game. It is the applicant's responsibility to notify the Department of Fish & Game, P.O. Box 47,Yountville, California 94599, of any proposed construction within this development that may affect any fish and wildlife resources, per the Fish & Game Code. C. This project may also be subject to the requirements of the Army Corps of Engineers. The applicant should notify the appropriate district of the Corps of Engineers to determine if a permit is required and if it can be obtained. D. The applicant shall be required to comply with all rules, regulations, and procedures of the National Pollutant Discharge Elimination System (NPDES) for municipal construction and industrial activities as promulgated by the California State Water Resources Control Board, or any of its Regional Water Quality Control Boards (San Francisco Bay- Region II or Central Valley - Region V). E. The applicant will be required to comply with the requirements of the Bridge/Thoroughfare Fee Ordinance for the Alamo Area of Benefit as adopted by the Board of Supervisors. F. The applicant will be required to comply with the drainage fee requirements for Drainage Area 13 as adopted by the Board of Supervisors. G. Comply with the requirements of the Contra Costa Central Sanitary District. 7 H. Comply with the requirements of the San Ramon Valley Fire Protection District. I. Comply with the requirements of the Health Services Department, Environmental Health Division. J. Comply with the requirernents of the Building Inspection Department. Building permits are required prior to the construction of most structures. DJC/RHD/aa DPXII/3001-93C.DJC 5/27/94 12/20/94 - BS (a) 2/14/95 84-50.1608-8.4-52.404 ZONING 84-50.1608 Rezoning to N-B district. (a) An 84-52.1410 Special district—Building applicant for rezoning to an N-B district may construction. submit simultaneously and.in combination with 84-52.1412 Special district—Areas not the zoning application, or thereafter but before included in building sites. the board's final zoning decision, an application Article 84-52.16 Development Plans for approval of a development plan for the Sections: property. 84-52.1602 Development plans required, (b) Such a development plan application shall procedure. be processed and noticed as are those matters designated to come before the zoning Article 84-52.2 administrator, except that it shall be initially General heard by the planning commission. The commission's decision shall be a 84-52.202 General provisions. All land recommendation to the board of supervisors within an R-B retail business district may be which shall make the final decision on the used for any of the following uses, under the development plan along with the rezoning. (Ord. following regulations set forth in this chapter. 74-36 § 1). (Ord. 2011: Ord. 1985: Ord. 1781: Ord. 1569: prior code § 8160(part): Ord. 1046: Ord. 556: Ord. 382). Chapter 84-52 Article 84-52.4 R-B RETAIL BUSINESS DISTRICT Uses Article 84-52.2 (General 84-52.402 Uses — Permitted. Uses Sections: permitted in the R-B district shall be as follows: 84-52.202 General provisions. (1) The carrying on of a retail business as Article 84-52.4 Uses defined in Section 82-4.216 provided all the Sections: sales, demonstrations, displays, services and .84-52.402 Uses—Permitted. other activities of the retail business are 84-52.404 Uses—Requiring a land use conducted within an enclosed building, except permit. that off-street parking shall be permitted; Article 84-52.6 Lots (2) All of the uses permitted in single family Sections: and two family residential districts together with 84-52.602 Lot—Area. the uses permitted in these districts after the Article 84-52.8 Building Heijlit granting of land use permits; Sections: (3) Hotels and motels;and 84-52.802 Building height—Maximum. (4) Accessory signs providing such signs are Article 84-52.10 Yards not rotating, flashing or animated and do not Sections: exceed fifty square feet of surface area except 84-52.1002 Yard—Side. that double face signs shall be considered as 84-52.1004 Yard—Setback. having one surface, and do not exceed Article 84-52.12 Land Use and Variance twenty-five feet in height. (Ord. 2011: Ord. Permits 1985: Ord. 1781: Ord. 1569: prior code § Sections: 8160(a): Ord. 1046: Ord. 556: Ord. 382). 84-52.1202 Land use and variance permit—Granting. 84-52.404 Uses — Requiring a land use Article 84-52.14 Special District permit. In the R-B district the following uses are Sections: permitted after the issuance of a land use 84-52.1402 Special district—Generally. permit: 84-52.1404 Special district—Enlarged, (1) Lumber yard; detailed map. (2) Cabinet shop; 84-52.1406 Special district—Land use (3) Sheet metal shop; permits. (4) Animal hospital; 84-52.1408 Special district—Lot area. (5) Commercial dog kennel; (Contra Costa County 6.86) 356 R-B _ _gTRICT 84-52.602-84-52.1004 (6) Hobby dog kennel; would create or establish an unusually special (1) C (7) Auto garage which includes body repair dangerous fire or safety hazard to surround and painting; properties. (8) Building contractor's yard; (G) No ground vibrations shall be perceptible (9) Structures having three or more at the property site boundaries. residential apartment units. Minimum off-street (H) No emanation of noise exceeding seventy parking requirements for apartment units shall decibels at the boundaries of the property shall be as required in Section 84-24.1202; be permitted. (10) Other retail businesses where the sales, (I) All manufacturing, processing or research demonstrations, displays, services and other operations shall be conducted within enclosed activities, or some of them, are conducted other buildings. than in an enclosed building; (J) All open storage areas shall be screened (11) Accessory signs having more than fifty by solid walls, fences or adequate plantings of square feet in area, or more than twenty-five not less than six feet in height and in no case feet in height or that are rotating, flashing or shall materials be stacked or stored higher than animated; the screen. (Ord. 68-52 § 2, 1968: Ord. 67-39 § . (12) Nonaccessory signs; 6, 1967: Ord. 67-27 § 1, 1967: Ord. 2011: Ord. (13) Where a road, having a right-of-way 1985: Ord. 1781: Ord. 1569: prior code § width of fifty-five feet or less, forms the 8160(b): Ord, 1046: Ord. 556: Ord. 382). common boundary between a district of this classification and a district of any residential Article 84-52.6 classification, no access to property in the Lots district of this classification adjacent to such common boundary shall be permitted to or from 84-52.602 Lot — Area. Lot area provisions such road until a land use permit therefor shall for the R-B district shall be the same as those for have first been obtained. Such permit shall be the N-B district (Section 84-50.602). (Ord. C determined by the effects of traffic upon such a 2011: Ord. 1985: Ord. 1984: Ord. 1781: Or A road occasioned by use within such district, the 1569: prior code § 8160(c): Ord. 1-046: Or,. characteristics of the adjacent areas, traffic 556: Ord. 382). problems, pedestrian traffic, and other considerations found pertinent to the particular Article 84-52.8 area concerned; Building Height (14) A manufacturing research use which is to be established in an existing fully enclosed 84-52.802 Building height — Maximum. building where no alterations, or a minimum Building height provisions for the R B district amount of alterations, would be required to shall be the same as those for the N-B district accommodate such use; and which wholly (Section 84-50.802). (Ord. 2011: Ord. 1985: involves products of small bulk; and which Ord. 1984: Ord. 1781: Ord. 1569: prior code § meets the following standards: 8160(d): Ord. 1046: Ord. 556: Ord. 382). (A) No smoke of any kind shall be permitted. (B) No odors created by any industrial or Article 84-52.10 processing operation shall be perceptible at the Yards property site boundaries. (C) No discharge into the air of any dust, dirt 84-52.1002 Yard —.Side. No.side yards are or particular matter, created by any industrial required. (Ord. 2011: Ord. 1985: Ord. 1984: operation or emanating from any products prior Ord.. 1781: Ord. 1569: prior code § 8160(e): to or subsequent to processing shall be Ord. 1046: Ord. 556: Ord. 382). permitted. (D) No corrosive, obnoxious or toxic fumes 84-52.1004 Yard — Setback. Every or gases shall be permitted. structure erected for retail business use and (E) No heat or glare shall be perceptible at every structure accessory to it shall be located at any point beyond the subject boundaries. least ten feet from the boundary line of an" (F) No manufacturing, processing or existing road or highway. (Ord. 2011: Or 3 laboratory research shall be permitted which 1985: Ord. 1984: Ord. 1781: Ord. 1569: prior. 357 (Contra Costa County 9-15-76) 8452.1202-84-52.1602 ,ZING code § 8160(f): Ord. 1046: Ord. 556: Ord. prior code § 8160(h)(3): Ord. 1046: Ord. 556: 382). Ord. 382). Article 84-52.12 84-52.1410 Special district — Building Land Use and Variance Permits construction. The enlarged detail map shall contain precise designations for sites of 84-52.1202 Land use and variance permit — buildings. Only one building may be constructed Granting. Land use permits for the special uses within a precise building site, but land use enumerated in Section 84-52.404 and variance permits to construct additional buildings on the permits to modify the provisions contained in site may be granted after application under Sections 84-52.602 — 84-52.1004 may be Chapter 82-6. (Ord. 2011: Ord. 1985: Ord. granted after application in accordance with 1984: Ord. 1781: Ord. 1569: prior code § Chapter 82-6. (Ord. 2011: Ord. 1985: Ord. 8160(h)(4): Ord. 1046: Ord. 556: Ord. 382). 1984: Ord. 1781: Ord. 1569: prior code § 8160(g): Ord. 1046: Ord. 556: Ord. 382). 84-52.1412 Special district — Areas not included in building sites. Areas in special retail Article 8452.14 business districts not included in precise building Special District sites may be used for the following uses and purposes: walks, drives, curbs, gutters, parking 84-52.1402 Special district — Generally. A areas, accessory buildings to parking areas, and single parcel of land„ containing at least twenty other landscaping features not including acres, located in a retail business district, may be buildings or structures, but buildings or developed as a special retail business district as structures may be erected in these areas on the provided in Sections 84-52.1404 — 84-52.1412. issuance of a land use permit for them. (Ord. (Ord. 2011: Ord. 1985: Ord. 1984: Ord. 1781: 2011: Ord. 1985: Ord. 1984: Ord. 1781: Ord. Ord. 1569: prior code § 8160(h) (part): Ord. 1569: prior code § 8160(h)(5): Ord. 1046: Ord. 1046: Ord. 556: Ord. 382). 556: Ord. 382). C 84-52.1404 Special district — Enlarged, Article 84-52.16 detailed map. An enlarged detailed map shall be Development Plans made a part of this chapter and shall state on the map that it is a special retail business district. 8452.1602 Development plans required, The map shall delineate, and set forth the procedure. No development is lawful in an R-B conditions for, the placement of buildings and district until a development plan for it has been spaces about buildings in legend form on the submitted and approved pursuant to the face of the map and thereby becomes a part of procedures in Article 84-50.16. (Ord. 74-36 § Sections 84-52.1402 — 84-52.14.12 and of the 2)• detail of the area to which it applies. (Ord. 2011: Ord. 1985: Ord. 1984: Ord. 1781: Ord. 1569: prior code § 8160(h)(1): Ord. 1046: Ord. Chapter 84-54 556: Ord. 382). C GENERAL COMMERCIAL DISTRICT 84-52.1406 Special district — Land use permits. Land use permits for the modification Article 8454.2 General of any of the details set forth on the enlarged Sections: detail map may be granted after application 84-54.202 General provisions. "N under Chapter 82-6. (Ord. 2011: Ord. 1985: Article 8454.4 Uses Ord. 1984: Ord. 1781: Ord. 1569: prior code § Sections: 8160(h)(2): Ord. 1046: Ord. 556: Ord. 382). 8454.402 Uses allowed. 84-54.404 Uses—Requiring land use .84-52.1408 Special district — Lot area. In permit. special business districts Section 84-52.1002, Article 84-54.6 Lots regulating lot area, shall not apply. (Ord. 2011: Sections: Ord. 1985: Ord. 1984: Ord. 1781: Ord. 1569: 8454.602 Lot—Area. (Contra Costa County 9-15-76) 358 OFf--STRF.FT PARKING 82-14.004 82-16.008 adjoining parcel of lan not constitute Chapter 82-16 o bbss ILL vio ate ired yard regu—lations. (Prior code : Ord. 382). OFF-STREET PARKING* 82-14.004 a yards on lots established Sections: before a ve date. Notwithstanding any other 82-16.002 Generally. provi ' sof Divisions 4, side yards 82-16.004 Application to existing shall 1n any su district, land uses. transition residential-agricul district, 82-16.006 Fractional parking space. residential suburban dist ' single family 82-16.008 Mixed uses. residential district, m " e family residential 82-16.010 Location. district, multiple 1 y residential district-A, 82-16.012 Design and layout. recreational r ential district, and forestry 82-16.014 Maintenance and operation. recreationa strict, according to the following 82-16.016 Common parking facility. table fo ny lot or parcel of land which was 82-16.018 Number of required spaces. establi d by records in the office of the 82-16.020 Requirements in recorde to of Divisions nonbusiness areas. 82 and 84 or t e area or distil which the 82-16.022 Loading spaces. lot or parcel of land is situated: 82-16.024 Variances. 40--I"--1-1 Front Width of Lot Minimum to Minimum Single Front Width of Lot Sid Allowed Side Yazd Allowed 82-16.002 Generally. It is the intent of this 100 feet or less but code that all land uses shall be provided with more than 80 f 20 feet 10 feet sufficient space located off-street for the parking 80 feet or 1 t of vehicles to meet the needs of persons more t 51 feet 15 feet 5 feet 51 feemployed at or making use of such land uses. No et -more than 41 feet 10 feet 5 feet application for a building permit for the erection 41 feet or less but of a new structure or for the enlargement of an 1 more than 31 feet 8 feet 3 feet' existing structure, or for the development of a J 31 feet or less 6 feet 3 feet land use, shall be approved unless it includes (Prior code § 8116). off-street parking facilities as required by this code. (Ord. 2031 § 1 (part), 1966: prior code § 82-14.0(6 Acc uses in rear yards. An 8119 (part): Ord. 1027). accessory build' r accessory use may occupy not more th irty percent of a required rear 82-16.004 Application to existing land uses. yard. (Pri ode § 8117: Ord. 382). Land uses in existence (i.e., occupied by a structure) December 23, 1966, or for which 82-14. ear yard abut n side yard. building permits have been approved, shall not In all single family residential stricts (map be -subject to the requirements of this chapter, symbol R-1), multiple family r ential districts provided that any off-street parking facilities (map symbol M-R), mult• family residential now required or serving such land uses shall not, districts-A (map sy M-R-A), residential in the future, be reduced below these suburban distric ap symbol R-S), transition requirements. (Ord. 2031 § 1(a), 1966: prior residential-�a ' ture districts (map symbol code § 8119(a): Ord. 1027). R-A), an.d burban districts (map symbol S), there sh be a rear yard of not less than five 82-16.006 Fractional parking space. Where feet wile e rear yard of a lot or parcel of the computation of required off-street parking land abuts on a slue yar r code § 8118). spaces results in a fractional number, only the 1� fraction of one-half or more shall be counted as one. (Ord. 2031 § 1(b), 1966: prior code § 8119(b): Ord. 1027). 82-16.008 Mixed uses. Where ,property is *Pur otf-street parkine provisions for specific land use districts, see Chapters 84-6 ff..this code. 303 82-16.010-82-16.012 ZONING occupied or intended to be occupied by two or be so graded and drained as to prevent the more establishments falling into different classes ponding of water. of uses, the off-street parking required shall be (4) Parking areas shall not be used for the sum of the requirements for the various automobile sales, storage, repair work, individual establishments., computed separately; dismantling or servicing of any kind. off-street parking provided for one use shall not (5) A planter or landscaped strip at least four be considered as being provided for any other feet in width shall be provided adjacent to street use. (Ord. 2031 § 1(c), 1966: prior code § rights-of-way. Dead corners and other waste 8119(c): Ord. 1027). areas shall be landscaped to provide a visual break in the paved area. Parking areas of more 82-16.010 Location. Required off-street than five parking spaces shall provide, in parking shall normally be provided on the same addition to the required parking area, an area lot or premises as the main use it serves. Where equal to not less than five percent of the total this is impractical, the board of adjustment may, parking area devotedto landscaping. Within this by use permit, authorize provision for parking planter or landscaped strip, an irrigation system on any parcel in the same ownership located shall be installed. Such a landscaped strip or r•,rithin two hundred feet: of the lot containing planter shall be provided to create the necessary the main use, (Ord. 2031 § 1(d), 1966: prior visual and physical break between the pedestrian code § 8119(d): Ord. 102:7). traffic utilizing the sidewalks along the streets and the vehicular traffic in the parking area, and 82-16.012 Design and layout. Off-steet by this means, substantially reduce the traffic parking areas shall be designed in such a manner hazard to the pedestrian. as to conform to the following regulations, (6) Parking spaces shall be marked or bject to review and approval by the zoning maintained on the pavement and any other -(iministrator: directional marking or signs shall be installed as (1) Dimensions of the required off-street permitted or required by the zoning 'arking spaces and driveways shall have administrator, to insure the maximum Minimums as per the following table: utilization of space, sufficient traffic flow, and Angle of �.��tc'r 5 .ac i general safety. :. king stall Curb stall Driveway (7) Lighting, if provided, shall be directed Degrees width Length Depth width downward and away from residential areas and 0 9 ft.0 in. 23 ft.0 in. 9 ft.0 in. 12 ft.0 in. public streets so as not t0 produce a 20 9 ft.0 in. 26 ft.4 in. 15 ft.0 in. 11 ft.0 in. P P glare as seen 30 9 ft.0 in. 18 ft.0 iin. 17 ft.4 in. 11 ft.0 in. from such areas, in order to insure the general 40 9 ft.0 in. 14 ft.0 in. 19 ft.2 in. 12 ft.0 in. safety of other vehicular traffic and the privacy 45 9 ft.0 in. 12 ft.9 in. 19 ft. 10 in. 13 ft.0 in. and well-being of the residential areas, and the 50 9 ft.0 in. 11 ft.9 in. 20 ft.5 in. 12 ft.0 in. lighting intensity shall be no greater than 50 9 ft.o in. 10 ft.5 in. 21 ft.o in. 18 ft.o in. reasonably required to light the parking area. 70 9 ft.0 in. 9 ft.8 in. 21 ft.0 in. 19 ft.0 in 80 9 ft.0 in. 9 ft.2 in. 20 ft.4 in_ 26 ft.0 in.. (8) Access to public parking areas and curb 90 9 ft.0 in. 9 ft.0 in. 19 ft.0 in. 28 ft.0 in. cuts for driveways shall be so located as to (2) All off-street parking facilities shall be insure an efficient and safe traffic flow into the :'.signed with appropriate maneuvering areas parking areas and along the public streets. ,nd means of vehicular access to the main and (9) Parking areas shall be designed so that ..diary streets. Where the parking area does vehicular parking does not overhang sidewalks, t abut on a street, there shall be provided an planters or landscaped strips. -ess drive not less than twelve feet in width in (10) Within any of the commercial, industrial >e case of one-way traffic, and not less than and multiple family residential zones, parking ,enty feet in width in all other cases, leading to areas shall be designed so that vehicles are not .:ie parking area in such a manner as to secure permitted to back out of the parking areas on to le most appropriate development of the streets. i operty in question. (I I) A six feet high, solid fence, or masonry `(3) Required off-street parking areas shall be wall of acceptable design, shall be provided irfaced with an asphaltic or Portland cement along the edge(s) of any public parking areas ander pavement, or similar material so as to adjacent to residentially zoned property to rovide a durable and dustless surface, and shall protect these residential properties from the 304 OFF-STREET PARKING 82-16.014-82-16.020 interruption and nuisances of the vehicles using for each doctor or dentist; the parking areas. (12) Banks, business and professional offices, (12) A barrier curb or wheel stop at least six other than medical and dental offices: One space. inches in height shall be provided adjacent to for each two hundred square feet of gross floor landscaping, buildings, and other areas to area; prevent damage to these facilities by the vehicles (13) Retail stores and shops, except as utilizing the parking areas. (Ord. .2031 § 1(e), otherwise specified herein: One space for each 1966: prior code § 8119(e): Ord. 1027). two-hundred fifty square feet of gross floor area; (14) Commercial service, repair shops and 82-16.014 Maintenance and operation. All wholesale establishments: One space for each required parking facilities shall be provided and five hundred square feet of gross floor area; maintained so long as the use exists which the • (15) Retail stores which handle only bulky parking facilities were designed to serve, or any merchandise, such as furniture, household use. Off-street parking facilities shall not be appliances, and motor vehicles: One space for reduced in total area, except when such each five hundred square feet of floor area; reduction is in conformity with the (16) Warehouses and other storage buildings: requirements of this code. (Ord. 2031 § 1(f), One space for each one thousand square feet of 1966: prior code § 8119(f): Ord. 1027). gross floor area; (17) Mortuaries: One space for each fifty 82-16.016 Common parking facility. square feet of gross floor area in chapel areas; Nothing in this code shall be construed to (18) Assembly halls without fixed seats: One prevent the joint use of off-street parking for space for each forty square feet of gross floor two or more land uses if the total of such spaces area; when used together shall not be less than the (19) Retail and wholesale establishments sum of the requirements for the various conducted primarily outside of buildings: One individual uses computed separately in space for each two employees; accordance with the requirements of this code. (20) For a use not specified in this section, (Ord. 2031 § 1(g), 1966: prior code § 8119(g): the same number of off-street parking spaces Ord. 1027). shall be provided as are required for the most similar specified use. (Ord. 2031 § 1(h), 1966: 82-16.018 Number of required spaces. prior cod_ e § 8119(h): Ord. 1027). Off-street parking spaces shall be provided for each land use on the basis of the following. 82-16.020 Requirements in nonbusiness schedules: areas. Wherever one or more parcels of land ad- (1) Hotels and motels: One space for each join land of a publicly owned transportation fa- sleeping unit; cility, or a street adjoining a publicly owned (2) Hospital: One space for each two beds; transportation facility, or adjoin a zoning dis- (3) Sanitariums, convalescent homes, rest trict allowing business uses, off-street parking may be allowed o these parcels to serve the homes, nursing homes: One space for each three public transportation facility or authorized bttsi- beds; ness uses, after the issuance of a land use permit. (4) Churches: One space for each three if: seats; (1) The parking areas are limited to an area (5) Bowling alleys: Seven spaces for each within one thousand feet of the public transpor- alley, plus one space for each two employees; tation facility or the boundary of the zoning (6) Rooming and lodging houses: One space district allowing business uses. Areas beyond this for each bedroom; distance may be used for landscaping. (7) Theaters: One space for each four seats, (2) The parking area is for private passenger vehicle parkin_, only. (8) Sports arenas: One space for each four (3) No commercial repair work or sales Of seats: (9) Auditorums: One space for each four any kind are allowed. (:l) No sins are permitted other than tho�� seats: to �_'ttide traffic. to identify the parkin_ lot. ails (10) Night clubs, cocktail lounges and to state the condition of use. restaurants: One space for each three seats; (5) The harking, area is designed and (1 1) Medical and dental offices: Five spaces developed in the manner and with the conditions { 305 (Contra Costa County 4-6J) { 82-16.022-82-18.002 ZONING deemed proper and adequate to protect resi- minimum width of ten feet, a minimum lengf4; dences in the vicinity_ These conditions include, of thirty-five feet, and a minimum height of among others, the following: fifteen feet. ' (A) Proper planting and screening shall be (3) Off-street loading spaces required by this provided either with fencing or planting,or both, section shall be separately and permanently to protect nearby residences from noise, light, maintained as such, and shall be used only for and other detrimental effects. this purpose. No part of a required loading space (B) The entrance/exits shall be designed and shall be encroached upon by buildings, storage, located to minimize conflict with both existing or any other activity. and reasonably foreseeable vehicular and pedes- (4) Each off-street loading space shall be trian traffic. accessible from a public street.and shall not be (C) The area used for drives and parking shall located within the required front yard or side be suitably paved to prevent dust and mud. yard, nor cause trucks to encroach upon the (D) Proper provisions shallbe made, as front yard or side yard during the process of deemed necessary, for adequate lighting of en- loading or unloading. (Ord. 2031 § 16), 1966: trances, exits, and parking areas, with measures prior code § 81190): Ord. 1027). to shield adjacent residential areas from the lights. (E) Establishment of.the parking area shall be 82-16.024 Variances. Variances for any of subject to the approval of a detailed plot plan the requirements in this chapter may be granted depicting and delineating the above requirements by the zoning administrator. (Ord. 2031 § I(k), and planning location of parking attendant's 1966: prior code § 8119(k): Ord. 1027). shelter, together with other necessary elements to constitute a proper parking area. (Ords. 82-3 § 1,2031 § 1(i): prior code§ 8119(i):Ord. 1027): Chapter 82-18 82-16.022 Loading spaces. In any district, SIGHT OBSTRUCTIONS in connection with every building or part AT INTERSECTIONS thereof, hereafter erected or enlarged which is to be used for manufacturing, storage, Sections: warehousing, goods' display, retail sales, 82-18.002 Prohibited. wholesaling, hotel, hospital, mortuary, laundry, 82-18.004 Exceptions. dry cleaning, or other uses similary requiring the 82-18.006 Railroad crossings. receipt or distribution by vehicles of materials, 82-18.008 Violation—Notice. there shall be provided and maintained on the 82-18.010 Appeal. same lot with such building, off-street loading 82-18.012 Removal after appeal. spaces as per the following schedule: 10,000-20,000 square feet of gross floor area, 82-18.002 Prohibited: No structure one (1) space, (including but not limited to fences and 20,001-30,000 square feet of gross floor area, gateways) or vegetation which obstructs the two (2)spaces, visibility of and from vehicles approaching the 30,001-45,000 square feet of gross floor area, intersection of a state highway, public road, or three (3)spaces, and street with another state highway, ;public road, 45,001-75,000 square feet of gross floor area, or street, shall be constricted, grown, four(4)spaces. maintained or permitted higher than two and Plus one space for each additional seventy-five one-half feet above the curb grade. or tliree feet thousand square feet of gross floor area. above the edge of pavement. within a triangular In addition, the following requirements shall area bounded by the right-of-way lines and a be provided: diagonal line joining points on the right-of-way (1) No loading operation for any use required lines twenty-five feet back from the point of to provide off-street loading space, nor the their intersection or in the case of rounded parking of any vehicle incident to such loading corners, the triangular area between the tangents operation shall be permitted within any street to the curve of the right-of-way line and a right-of-way. diagonal line joining points on the tangents (2) Each off-street loading space shall have a twenty-five feet back from the point of their (Contra Costa County 4.82) 306 OFF STRE ET PARKING STANDARDS , CONTRA COSTA COUNTY PLANNING DEPARTMENT 0 4 1' i-----4 5.8" 5 0'-4" py 9 �-12� IS' I-II' --15,-� �17'-4"--ll'-17'-4"� +-19'-2" 12'-�+1,.9'-2" i 14 1. 23' I i I 9' I 1 9 i PARALLEL 200 ANGLE 300 ANGLE 400 ANGLE 126 CARS PER ACRE 78 CARS PER ACRE 106 CARS PER ACRE 120 CARS PER ACRE 51'-8"- 52 -10 60' I 1--19'-10"- --13*---19'-10 20'-5"- 12'---20-5"--� 21' 18' 21' 12l9 11;9„ 10:5" i 1 9 9 i 450 ANGLE 500 ANGLE 600 ANGLE 128 CARS PER ACRE 138 CARS PER ACRE 138 CARS PER ACRE 61' 66-8" 6 6' �21' 19'-- 21'-+l 20'-4" 26 -20-4 -I9'-{` 28'19' --T -7 9 B' 4.2.. 9, 9. 9' + 9' 700 ANGLE 800 ANGLE 900 ANGLE 146 CARS PER ACRE 140 CARS PER ACRE 146 CARS PER ACRE I 9 9'-3" 99,-3" 19=10" 13 33-7" 1319,-10" 19-19- --10" 13' 33-7 --13* 19'-10"--1 I� 1 +13-5-�g-S 13-5"I I + 13=5" 6'-9x13'-5"- i I I I 1 I 12-4' I I /9 I 9 4 12' 2 4 ■ t 450 OVERLAPPED 450 HERRINGBONE 132 CARS PER ACRE 132 CARS PER ACRE 12- 66 PREP4 RED BY CONTRA COSTA COUNTY PLANNING DEPARTMENT CCTA INTERSECTION LEVEL OF SERVICE ANALYSIS 2/20/95 INTERSECTION 1 DANVILLE BLVD and STONE VALLEY CONTRA COSTA COUNTY COUNT DATE/TIME: 2/15/95 6:45-8:45 PEAK HOUR: 7:45-8:45 CONDITION : STONE VALLEY AT DANVILLE AM PEAK 2-15-95 FILE STONEDAN ------------- RIGHT THRU LEFT 9 271 228 I , NORTH LEFT 20 - 1.1 1.1 2.1 1.0 1.9 --- 687 RIGHT STREET NAME: THRU 65 - -> 1.1 (NO. OF LANES) 1.1<--- 87 THRU STONE VALLEY RIGHT 62 - 1.0 1.0 2.0 1.9 1.1 --- 488 LEFT SPLIT PHASE? I I I v 39 410 348 LEFT THRU RIGHT STREET NAME: DANVILLE BLVD SPLIT PHASE? W 6 PHASE SIGNAL ORIGINAL ADJUSTED V/C CRITICAL MOVEMENT VOLUME VOLUME* CAPACITY RATIO V/C ------------------------------------------------------------------------ NB RIGHT (R) 348 348 1650 0.2109 THRU (T) 410 410 3300 0.1242 0.1242 LEFT (L) 39 39 1650 0.0236 ----------------------------------------------------------------------- SB RIGHT (R) 9 9 1650 0.0055 THRU (T) 271 271 3300 0.0821 LEFT (L) 228 228 1650 0.1382 0. 1382 T + R 280 3300 0.0848 ------------------------------------------------------------------------ EB RIGHT (R) 62 23 * 1650 0.0139 --THRU (T) 65 65 1650 0.0394 LEFT (L) 20 20 1650 0.0121 _. T + L 85 1650 0.0515 0.0515 ------------------------------------------------------------------------ WB RIGHT (R) 687 687 1650 0.4164 THRU (T) 87 87 1650 0.0527 LEFT (L) 488 488 1650 0.2958 T + L 575 1650 0.3485 0.3485 TOTAL VOLUME-TO-CAPACITY RATIO: 0.66 INTERSECTION LEVEL OF SERVICE: B A M * ADJUSTED FOR RIGHT TURN ON RED Zh S�tS A 11 Developed by TJKM Transportation Consultants, Pleasanton, CA, 1992 YY CCT.A INTERSECTION LEVEL OF SERVICE ANALYSIS 2/20/95 INTERSECTION 1 DANVILLE BLVD and STONE VALLEY CONTRA COSTA COUNTY COUNT DATE/TIME: 2/15/95 16:00-18:00 PEAK HOUR: 16:45-17:45 CONDITION STONE VALLEY AT DANVILLE PM PEAR 2-15-95 FILE STONEDAN RIGHT THRU LEFT 12 350 336 NORTH LEFT 54 --- 1.1 1.1 2.1 1.0 1.9 --- 529 RIGHT STREET NAME: THRU 97 ---> 1.1 (NO. OF LANES) 1.1<--- 68 THRU STONE VALLEY RIGHT 82 --- 1.0 1.0 2.0 1.9 1.1 --- 282 LEFT SPLIT PHASE? <--- ---> Y v III v 61 640 287 LEFT THRU RIGHT STREET NAME: DANVILLE BLVD SPLIT PHASE? N- 6 PHASE SIGNAL ORIGINAL ADJUSTED V/C CRITICAL MOVEMENT VOLUME VOLUME* CAPACITY RATIO V/C -------------•----------------------------------------------------------- NB RIGHT (R) 287 287 1650 0.1739 THRU (T) 640 640 3300 0.1939 0.1939 LEFT (L) 61 61 1650 0.0370 ------------------------------------------------------------------------- SB RIGHT (R) 12 12 1650 0.0073 THRU (T) 350 350 3300 0.1061 LEFT (L) 336 336 1650 0.2036 0.2036 T + R 362 3300 0.1097 -------------•----------------------------------------------------------- EB RIGHT (R) 82 21 * 1650 0.0127 --THRU (T) 97 97 1650 0.0588 LEFT (L) 54 54 1650 0.0327 -- T + L 151 1650 0.0915 0.0915 ------------------------------------------------------------------------ WB RIGHT (R) 529 529 1650 0.3206 THRU (T) 68 68 1650 0.0412 LEFT (L) 282 282 1650 0.1709 T + L 350 1650 0.2121 0.2121 TOTAL VOLUME-TO-CAPACITY RATIO: 0.70 INTERSECTION LEVEL OF SERVICE: 'w C * ADJUSTED FOR RIGHT TURN ON RED 2/is/' 15- PM pjfAk Developed by TJKM Transportation Consultants, Pleasanton, CA, 1992 YY CCTA INTERSECTION LEVEL OF SERVICE ANALYSIS 2/20/95 INTERSECTION 1 DANVILLE BLVD and STONE VALLEY CONTRA COSTA COUNTY COUNT DATE/TIME: 2/7/95 7:15-9: 15 PEAK HOUR: 7:30-8:30 CONDITION STONE VALLEY AT DANVILLE AM PEAK 2-7-95 FILE STONEDAN RIGHT THRU LEFT 12 268 209 LEFT 14 --- 1.1 1.1 2.1 1.0 1.9 --- 643 RIGHT STREET NAME: THRU 55 ---> 1.1 (NO. OF LANES) 1.1<--- 68 THRU STONE VALLEY RIGHT 53 --- 1.0 1.0 2.0 1.9 1.1 --- 416 LEFT SPLIT PHASE? <--l- " ---> Y V I I ( v 68 421 318 LEFT THRU RIGHT STREET NAME: DANVILLE BLVD SPLIT PHASE? N- 6 PHASE SIGNAL ORIGINAL ADJUSTED V/C CRITICAL MO�EMENT VOLUME VOLUME* CAPACITY RATIO V/C ------------------------------------------------------------------------ NB RIGHT (R) 318 318 1650 0.1927 THRU (T) 421 421 3300 0.1276 0. 1276 LEFT (L) 68 68 1650 0.0412 ------------------------------------------------------------------------- SB RIGHT (R) 12 12 1650 0.0073 THRU (T) 268 268 3300 0.0812 LEFT (L) 209 209 1650 0.1267 0.1267 T + R 280 3300 0.0848 ------------------------------------------------------------------------ EB RIGHT (R) 53 0 * 1650 0.0000 -THRU (T) 55 55 1650 0.0333 LEFT (L) 14 14 1650 0.0085 __ T + L 69 1650 0.0418 0.0418 ------------------------------------------------------------------------ WB RIGHT (R) 643 643 1650 0.3897 THRU (T) 68 68 1650 0.0412 LEFT (L) 416 416 1650 0.2521 T + L 484 1650 0.2933 0.2933 =5`,S TOTAL VOLUME-TO-CAPACITY RATIO: 0.59 INTERSECTION LEVEL OF SERVICE: A * ADJUSTED FOR RIGHT TURN ON RED 211195 A M PfAk Developed by 'CJKM Transportation Consultants, Pleasanton, CA, 1992 YY CCTA INTERSECTION LEVEL OF SERVICE ANALYSIS 2/20/95 INTERSECTION 1 DANVILLE BLVD and STONE VALLEY CONTRA COSTA COUNTY COUNT DATE/TIME: 2/7/95 16:00-18:00 PEAK HOUR: 16: 30-17:30 CONDITION STONE VALLEY AT DANVILLE PM PEAK 2-7-95 FILE STONEDAN RIGHT THRU LEFT 5 330 367 NORTH <--- v ---> LEFT 54 -•-- 1.1 1.1 2.1 1.0 1.9 --- 454 RIGHT STREET NAME: THRU 177 ----> 1.1 (NO. OF LANES) 1.1<--- 101 THRU STONE VALLEY RIGHT 108 ---- 1.0 1.0 2.0 1.9 1.1 --- 352 LEFT SPLIT PHASE? <--- ---> I Y v III v 92 501 266 LEFT THRU RIGHT STREET NAME: DANVILLE BLVD SPLIT PHASE? W 6 PHASE SIGNAL ORIGINAL ADJUSTED V/C CRITICAL MOVEMENT VOLUME VOLUME* CAPACITY RATIO V/C --- -------------------------------------------------------------------- KB RIGHT (R) 266 266 1650 0.1612 THRU (T) 501 501 3300 0.1518 0.1518 LEFT (L) 92 92 1650 0.0558 ------------------------------------------------------------------------- SB RIGHT (R) 5 5 1650 0.0030 THRU (T) 330 330 3300 0.1000 LEFT (L) 367 367 1650 0.2224 0.2224 T + R 335 3300 0.1015 ------------------------------------------------------------------------ EB RIGHT (R) 108 16 * 1650 0.0097 . ._._.THRU (T) 177 177 1650 0.1073 LEFT (L) 54 54 1650 0.0327 _ T + L 231 1650 0.1400 0. 1400 ------------------------------------------------------------------------ WB RIGHT (R) 454 454 1650 0.2752 THRU (T) 101 101 1650 0.0612 LEFT (L) 352 352 1650 0.2133 T + L 453 1650 0.2745 0.2745 hr1 TOTAL VOLUME-TO-CAPACITY RATIO: 0.79 INTERSECTION LEVEL OF SERVICE: C * ADJUSTED FOR RIGHT TURN ON RED 2,/1/15- Ph PEAK Developed by TJKM Transportation Consultants, Pleasanton, CA, 1992 YY CCTA INTERSECTION LEVEL OF SERVICE ANALYSIS 2/20/95 INTERSECTION 1 DANVILLE BLVD and STONE VALLEY CONTRA COSTA COUNTY COUNT DATE/TIME: 9/8/93 7:15-9:15 PEAK HOUR: 7:45-8:45 CONDITION : STONE VALLEY AT DANVILLE AM PEAR 9-8-93 FILE STONEDAN -------------------------------------------- -__---____--____----_ RIGHT THRU LEFT 18 360 201 ' I ( I NORTH LEFT 26 ---- 1.1 1.1 2.1 1.0 1.9 --- 648 RIGHT STREET NAME: THRU 51 ----> 1.1 (NO. OF LANES) 1.1<--- 73 THRU STONE VALLEY RIGHT 97 ---- 1.0 1.0 2.0 1.9 1.1 --- 491 LEFT SPLIT PHASE? I <--- ---> I Y v ( I v 44 424 327 LEFT THRU RIGHT STREET NAME: DANVILLE BLVD SPLIT PHASE? N- ----------------- 6 PHASE SIGNAL ORIGINAL ADJUSTED V/C CRITICAL MOVEMENT VOLUME VOLUME* CAPACITY RATIO V/C ------------------------------------------------------------------------- NB RIGHT (R) 327 327 1650 0.1982 THRU (T) 424 424. 3300 0.1285 0.1285 LEFT (L) 44 44 1650 0.0267 ------------------------------------------------------------------------. SB RIGHT (R) 18 18 1650 0.0109 THRU (T) 360 360 3300 0.1091 LEFT (L) 201 201 1650 0.1218 0.1218 T + R 378 3300 0.1145 ------------------------------------------------------------------------ EB RIGHT (R) 97 53 * 1650 0.0321 --THRU (T) 51 51 1650 0.0309 LEFT (L) 26 26 1650 0.0158 T + L 77 1650 0.0467 0.0467 ------------------------------------------------------------------------- WB RIGHT (R) 648 648 1650 0.3927 THRU (T) 73 73 1650 0.0442 LEFT (L) 491 491 1650 0.2976 T + L 564 1650 0.3418 0.3418 TOTAL VOLUME-TO-CAPACITY RATIO: 0.64 INTERSECTION LEVEL OF SERVICE: B * ADJUSTED FOR RIGHT TURN ON RED Ah I"l PAK Developed by TJKM Transportation Consultants, Pleasanton, CA, 1992 YY CCTA INTERSECTION LEVEL OF SERVICE ANALYSIS 2/20/95 INTERSECTION 1 DANVILLE BLVD and STONE VALLEY CONTRA COSTA COUNTY COUNT DATE/TIME: 9/8/93 16:00-18: 00 PEAK HOUR: 16:45-17:45 CONDITION STONE VALLEY AT DANVILLE PM PEAK 9-8-93 FILE STONEDAN RIGHT THRU LEFT 3 379 385 LEFT 53 ---- 1. 1 1.1 2.1 1.0 1.9 --- 421 RIGHT STREET NAME: THRU 198 ----> 1.1 (NO. OF LANES) 1.1<--- 70 THRU STONE VALLEY RIGHT 107 ---- 1.0 1.0 2.0 1.9 1.1 --- 387 LEFT SPLIT PHASE? <--- ---> + Y I I I v 78 495 344 LEFT THRU RIGHT STREET NAME: DANVILLE BLVD SPLIT PHASE? N- 6 PHASE SIGNAL ORIGINAL ADJUSTED V/C CRITICAL MOVEMENT VOLUME VOLUME* CAPACITY RATIO V/C ------------------------------------------------------------------------- NB RIGHT (R) 344 344 1650 0.2085 THRU (T) 495 495 3300 0.1500 0.1500 LEFT (L) 78 78 1650 0.0473 ------------------------------------------------------------------------- SB RIGHT (R) 3 3 1650 0.0018 - THRU (T) 379 379 3300 0.1148 LEFT (L) 385 385 1650 0.2333 0.2333 T + R 382 3300 0.1158 ------------------------------------------------------------------------- EB RIGHT (R) 107 29 * 1650 0.0176 __THRU (T) 198 198 1650 0.1200 LEFT (L) 53 53 1650 0.0321 _ T + L 251 1650 0.1521 0.1521 ------------------------------------------------------------------------ WB RIGHT (R) 421 421 1650 0.2552 THRU (T) 70 70 1650 0.0424 LEFT (L) 387 387 1650 0.2345 T + L 457 1650 0.2770 0.2770 TOTAL VOLUME-TO-CAPACITY RATIO: 0.81 -INTERSECTION LEVEL OF SERVICE: D * ADJUSTED FOR RIGHT TURN ON RED �I6 f q3 P t 1 Developed by TJKM Transportation Consultants, Pleasanton, CA, 1992 YY CCTA INTERSECTION LEVEL OF SERVICE ANALYSIS 2/20/95 INTERSECTION 1 DANVILLE BLVD and STONE VALLEY CONTRA COSTA COUNTY COUNT DATE/TIME: 7/18/91 6:45-8:45 PEAK HOUR: 7:45-8:45 CONDITION STONE VALLEY AT DANVILLE AM PEAK 7/18/91 FILE STONEDAN RIGHT THRU LEFT 19 165 189 J NORTH LEFT 15 --- 1.1 1.1 2.1 1.0 1.9 --- 222 RIGHT STREET NAME THRU 67 ---> 1.1 (NO. OF LANES) 1.1<--- 119 THRU STONE VALLEY RIGHT 34 --- 1.0 1.0 2.0 1.9 1.1 --- 269 LEFT SPLIT PHASE? <--- ---> Y v I I * I v 43 239 237 LEFT THRU RIGHT STREET NAME: DANVILLE BLVD SPLIT PHASE? N- 6 PHASE SIGNAL ORIGINAL ADJUSTED V/C CRITICAL MOVEMENT VOLUME VOLUME* CAPACITY RATIO V/C -------------•----------------------------------------------------------- NB RIGHT (R) 237 237 1650 0.1436 THRU (T) 239 239 3300 0.0724 0.0724 LEFT (L) 43 43 1650 0.0261 -- ----------------------------------------------------------- SB RIGHT (R) 19 19 1650 0.0115 THRU (T) 165 165 3300 0.0500 LEFT (L) 189 189 1650 0.1145 0.1145 T + R 184 3300 0.0558 -------------•----------------------------------------------------------- EB RIGHT (R) 34 0 * 1650 0.0000 -._THRU (T) 67 67 1650 0.0406 LEFT (L) 15 15 1650 0.0091 _ T + L 82 1650 0.0497 0.0497 ------------------------------------------------------------------------ WB RIGHT (R) 222 222 1650 0.1345 THRU (T) 119 119 1650 0.0721 LEFT (L) 269 269 1650 0.1630 T + L 388 1650 0.2352 0.2352 TOTAL VOLUME-TO-CAPACITY RATIO: 0.47 INTERSECTION LEVEL OF SERVICE: A * ADJUSTED FOR RIGHT TURN ON RED 7l�g�q A4 M PEAK Developed by TJKM Transportation Consultants, Pleasanton, CA, 1992 NY CCTA INTERSECTION LEVEL OF SERVICE ANALYSIS 2/20/95 INTERSECTION 1 DANVILLE BLVD and STONE VALLEY CONTRA COSTA COUNTY COUNT DATE/TIME: 7/18/91 16:00-18:00 PEAK HOUR: 16:45-17:45 CONDITION STONE VALLEY AT DANVILLE PM PEAR 7/18/91 FILE STONEDAN RIGHT THRU LEFT 5 333 311 " t ( I NORTH LEFT 61 ---- 1.1 1.1 2.1 1.0 1.9 --- 339 RIGHT STREET NAME: THRU 147 ----> 1.1 (NO. OF LANES) 1.1<--- 74 THRU STONE VALLEY RIGHT 100 ---- 1.0 1.0 2.0 1.9 1.1 --- 332 LEFT SPLIT PHASE? v I I I v 85 426 1291 LEFT THRU RIGHT STREET NAME: DANVILLE BLVD SPLIT PHASE? N- 6 PHASE SIGNAL ORIGINAL ADJUSTED V/C CRITICAL MOVEMENT VOLUME VOLUME* CAPACITY RATIO V/C ------------------------------------------------------------------------- NB RIGHT (R) 291 291 1650 0.1764 THRU (T) 426 426 3300 0.1291 0.1291 LEFT (L) 85 85 1650 0.0515 ------------------------------------------------------------------------- SB RIGHT (R) 5 5 1650 0.0030 THRU (T) 333 333 3300 0.1009 LEFT (L) 311 311 1650 0.1885 0.1885 T + R 338 3300 0.1024 ------------------------------------------------------------------------- EB RIGHT (R) 100 15 * 1650 0.0091 _THRU (T) 147 147 1650 0.0891 LEFT (L) 61 61 1650 0.0370 _ T + L 208 1650 0.1261 0.1261 ------------------------------------------------------------------------- WB RIGHT (R) 339 339 1650 0.2055 THRU (T) 74 74 1650 0.0448 LEFT (L) 332 332 1650 0.2012 T + L 406 1650 0.2461 0.2461 TOTAL VOLUME-TO-CAPACITY RATIO: 0.69 INTERSECTION LEVEL OF SERVICE: B * ADJUSTED FOR RIGHT TURN ON RED 'I�/g�q� P h P6AK Developed by TJKM Transportation Consultants, Pleasanton, CA, 1992 YY CCTA INTERSECTION LEVEL OF SERVICE ANALYSIS 2/20/95 INTERSECTION 1 DANVILLE BLVD and STONE VALLEY CONTRA COSTA COUNTY COUNT DATE/TIME: 12/12/89 7:00-9:00 PEAK HOUR: 7:30-8: 30 CONDITION STONE VALLEY AT DANVILLE - AM PEAK B.A. FILE STONEDAN RIGHT THRU LEFT 18 525 271 <--- v .--> LEFT 18 --- 1.1 1.1 2.1 1.0 1.9 --- 453 RIGHT STREET NAME: THRU 53 ---> 1.1 (NO. OF LANES) 1.1<--- 85 THRU STONE VALLEY RIGHT 41 --- 1.0 1.0 2.0 1.9 1.1 --- 423 LEFT SPLIT PHASE? <--- " ---> Y v v 49 456 332 LEFT THRU RIGHT STREET NAME: DANVILLE BLVD SPLIT PHASE? N- 6 PHASE SIGNAL ORIGINAL ADJUSTED V/C CRITICAL MOIVEMENT VOLUME VOLUME* CAPACITY RATIO V/C ------------------------------------------------------------------------ NB RIGHT (R) 332 332 1650 0.2012 THRU (T) 456 456 3300 0.1382 0.1382 LEFT (L) 49 49 1650 0.0297 ------------------------------------------------------------------------ SB RIGHT (R) 18 18 1650 0.0109 THRU (T) 525 525 3300 0.1591 LEFT (L) 271 271 1650 0.1642 0.1642 T + R 543 3300 0. 1645 ------------------------------------------------------------------------ EB RIGHT (R) 41 0 * 1650 0.0000 -._.THRU (T) 53 53 1650 0.0321 LEFT (L) 18 18 1650 0.0109 T + L 71 1650 0.0430 x0.0430 ------------------------------------------------------------------------ WB RIGHT (R) 453 453 1650 0.2745 THRU (T) 85 85 1650 0.0515 LEFT (L) 423 423 1650 0.2564 T + L 508 1650 0.3079 0.3079 ---------------- TOTAL VOLUME-TO-CAPACITY RATIO: 0.65 INTERSECTION LEVEL OF SERVICE: B * ADJUSTED FOR RIGHT TURN ON RED 1-011/89 (rvv-PAh PSK Developed by TJKM Transportation Consultants, Pleasanton, CA, 1992 YY�XISfiIJr+A G�h�t-t'aonS CCTA INTERSECTION LEVEL OF SERVICE ANALYSIS 2/20/95 INTERSECTION 1 DANVILLE BLVD and STONE VALLEY CONTRA COSTA COUNTY COUNT DATE/TIME: 12/12/89 16:00-18:00 PEAK HOUR: 16: 15-17: 15 CONDITION : STONE VALLEY AT .DANVILLE PM PEAK - B.A. FILE STONEDAN RIGHT THRU LEFT 6 349 354 " NORTH <--- v ---> LEFT 73 ---- 1.1 1.1 2.1 1.0 1.9 --- 544 RIGHT STREET NAME: THRU 221 ----> 1.1 (NO. OF LANES) 1.1<--- 75 THRU STONE VALLEY RIGHT 73 -•-- 1.0 1.0 2.0 1.9 1.1 --- 267 LEFT SPLIT PHASE? <--- ---> Y v III v 95 720 321 LEFT THRU RIGHT STREET NAME: DANVILLE BLVD SPLIT PHASE? N- 6 PHASE SIGNAL ORIGINAL ADJUSTED V/C CRITICAL MOVEMENT VOLUME VOLUME* CAPACITY RATIO V/C ------------------------------------------------------------------------ NB RIGHT (R) 321 321 1650 0.1945 THRU (T) 720 720 3300 0.2182 0.2182 LEFT (L) 95 95 1650 0.0576 ------------------------------------------------------------------------ SB RIGHT (R) 6 6 1650 0.0036 THRU (T) 349 349 3300 0.1058 LEFT (L) 354 354 1650 0.2145 0.2145 T + R 355 3300 0.1076 ------------------------------------------------------------------------- EB RIGHT (R) 73 0 * 1650 0.0000 _-THRU (T) 221 221 1650 0.1339 LEFT (L) 73 73 1650 0.0442 _ T + L 294 1650 0.1782 0.1782 ------------------------------------------------------------------------ WB RIGHT (R) 544 544 1650 0.3297 THRU (T) 75 75 1650 0.0455 LEFT (L) 267 267 1650 0.1618 T + L 342 1650 0.2073 0.2073 TOTAL VOLUME-TO-CAPACITY RATIO: 0.82 INTERSECTION LEVEL OF SERVICE: D * ADJUSTED FOR RIGHT TURN ON RED 1141L/801 8q ( PM PEM Developed by TJKM Transportation Consultants, Pleasanton, CA, 1992 YY Go K -{i q v rw-r t on -Fo re ale c�- cx►sfiIKI to" -)-raeis mc, -4LVD 132 X85 ----------------------------- t000 tte. C L ....... ...... ------- -- -------- ..........- ------------- -C) 62 2'15-_--- -lS ----------------- 5 -6 83o cr786�'____ X16 63 -- -- - 6 -15 2.-IS --._.. - 231 -------- - 8- FEB. -02' 95(THU) 16:45 BARTON-,,-,,HMAN SJ TEL:408 28L 333 P, 003 _RSECTION LEVEL OF SERVICE ANALYSIS 1/10/94 FILE 19po.geo JURISDICTN : Pleasanton N--S STREET : Hacienda Dr E-W STREET s Posi COUNT DATE: 12/15/93 TIME:4.,00-6.'00 pm P :00-6:00 CVC:TL =0.0077 NODE 9041 RIGHT T14RU LEFT V/C : 0.15 45 , 1 22 O S : A I I I ^ NODE 9052 S WARR(U,R) : N N <--I v 1--> I CVC:TR = 2 -I 1.0 1.1 2.1 1.1. 1--- 1 HT --:> 3.1 of LANES) 2.1 <--- THRU 1 ---1 1.1 1.1 1.0 1.0 1 LEFT PLIT? N v I I - 11 11 LEFT THRU RI DE CVC:TL =0.0 ? Y PHASE: 6 .ERSECTION 6410 CTN : S ON TREET : I-68 OFF E-W STREET CROW CNYN i CO TE: 11/07/90 TI •00-6:00 PM PK HR:5:00-6.-00 =0.1965 NODE 1758 T THRU LEFT TOT V/C : 0.57 643 0 541 L 0 S : A NODE 1760 1 1 1 - NODE 911 S WARR(U,R) : Y Y CVC:T -0.368 <---1 v 1--> I CVC:L =0. LEFT 0 0.0 2.0 0.0 2.0 1.9 1 --- 569 RIGH THRU ---> 3. 0 (NO. OF LANES) 3.0 <--- 994 THRU RI 06 ---I 1.9 0.0 0.0 0.0 0.0 I --- 0 LEFT I <--I ^ I--> 1 SPLIT? N V I I I v -- 0 0 0 NODE 1759 - INTERSECTION 8246 JURISDICTN : CC County N-S STREET : Danville Blvd E-W STREET Stone Val COUNT DATE: 12/12/89 TIME:4:00-6:00 pm PK HR:4:15-5:15 CVC:L =0.2145 NODE 9362 RIGHT THRU LEFT TOT V/C : 0.92 6 349 354 L 0 S E NODE 8714 ^ I I I ^ NODE 8247 S WARR(U,R) : Y Y CVC:TL -0.17821 <--I v 1--> I CVC:TL =0.2073 LEFT 73 ---1 1.1 1.1 2.1 1.0 1.0 1 --- 544 RIGHT THRU 221 ---> 1.1 (NO. OF LANES) 1.1 <--- 75 THRU RIGHT 73 ---1 1.0 1.0 2. 1 1.1 1.1 1 --- 267 LEFT �\ I <--I AI--> I SPLIT? Y V I I I v - 95 720 321 LEFT THRU RIGHT NODE 7981 CVC:TR =0.3155 SPLIT? N PHASE: 6 A- ro A/ - A S c-/f /`1 fin/ V-rC- a M FEB. -i32' 95(TUU) 16:45 BARTON-„,,,;R.MAN SJ TEL:408 28u . 533 P, 002 ;CTA IN'.t':ERSECTION LEVEL OF SERVICE ANALYSIS 1/10/9 FILE 1990. 70 JURISDICTN : Pleasanton N-S STREET : Hacienda or E-W STREET $ Positas OUNT DATE: 12/15/93 TIME:7:00--9:00 am PK 0-8:30 am :R -0.0285 NODE 9041 THRU LEFT TO /C : 0.16 28 28 S : A j NODE 9052 WARR(U,R) : N N A0273I CVC-.TR =0.09 15 --- 1.0 1.0 1. 2 1.1 I 40 RI d48 --> 3.1 (NO. OF .1 <- 289 U 27 ---J 1.1 1.1 1.1 1.0 LEFT 43 0 0 LEFT THRU RIGHT NO CVC:R =0_0000 SP Y P 6 SECTION .6410 JURISDI SAN RAMON N-S ST 1-680 SB OFF ET CROW CM Rb. COUNT DAT /07/90 TTME:7:00-9:00 K HR:7:15-82*15 AM CVC:L = 76 NODE 1758 RIGHT LEFT T C 0.65 69 0 1465 L 0 B 1760 ^ I ^ NODE 9117 S W Y Y ' -0.2069 V I --> CVC:L -0.0000 0 ..----� 0. .0 0.0 2.0 1.9 J- 484 RIGHT 1117 ---> (NO. OF LANES) 3.0 <- 965 THRU 288 1.9 0.0 0.0 0.0 0.0 I --• 0 LEFT ^ j..-> 1 SPLIT? N - v 1 f f V 0 0 0 LEFT THRURIGHT- ZCT'ION 8246 JURISDICTN : CC County N-S STREET : Danville Blvd E-W STREET Stone Valley COUNT DATE: 12/12/89 TIHE:7:00--9:00 am PK HR:7:30-8:30 am CVC:L -0.1642 NODE 9362 RIGHT THRU LEFT TOT V/C : 0.75 18 525 271 L O S : C 14 I j j ^ NODE 8247 S WARR(U,R) : Y Y =0.04301 <_-I v (--> j CVC:TL =0.3079 18 ( 2.1 1.1 2.1 1.0 1.0 --- 483 RIGHT 53 -> 1.1 (NO. OF LANES) 1.1 < 85 THRU 41 1_0 1.0 2.1 1.1 1.1 (--- 423 LEFT i <--I [--> j SPLIT? Y v- I I j V G 49 456 332 LEFT THRU RIGHT NODE 7981 CVC:TR �0.2388 SPLIT? N PHASE: 6