Loading...
HomeMy WebLinkAboutMINUTES - 12191995 - C6 r. R rM\w -t1� F .• TO: BOARD OF SUPERVISORS FROM: J. MICHAEL WALFORD, PUBLIC WORKS DIRECTOR DATE: December 19, 1995 SUBJECT: Approve Agreement With Byron Bethany Irrigation District for Culvert Replacement and Authorize Temporary Closure of Camino Diablo Road. Project No.: 0672.-6u_2-596 SPECIFIC REQUEST(S)OR RECOMMENDATIONS)&BACKGROUND AND JUSTIFICATION I. Recommended Action: APPROVE an agreement between the Byron Bethany Irrigation District (BBID) and Contra Costa County (County)to equally share the cost of replacing a culvert crossing Camino Diablo Road, and AUTHORIZE the temporary closure of Camino Diablo Road for a period of 16 calendar days. H. Financial Impact: The cost of the culvert replacement is estimated to be approximately $30,000. Road funds in the amount of $15,000 are available for the County share of the project cost. III. Reasons for Recommendations and Background: By letter dated December 7, 1994, the BBID advised the County that the 72" metal pipe culvert, serving as the conveyance for their canal lateral 45 facility under Camino Diablo Road approximately 0.6 miles west of Holway in the Byron area, was corroded and in need of repair or replacement. The BBID requested that the County affect repairs, citing County responsibility pursuant to California Water Code, Section 7034 and an alleged informal acceptance of the culvert by the County. In subsequent discussions County and BBID staff resolved to replace the culvert and equally share the costs and continuing responsibilities for maintenance of the facility. The subject agreement provides for the sharing of replacement costs and establishes equal responsibility for the safety, maintenance, and replacement of the culvert in the future. Continued on Attachment: x SIGNATURE: _RECOMMENDATION OF COUNTY ADMINISTRATOR _RECOMMENDATION OF BOARD COMMITTEE APPROVE OTHER SIGNATURE(S): ACTION OF BOARD ON 1 - 9- 1°►9 S APPROVED AS RECOMMENDED OTHER_ VOTE OF SUPERVISORS UNANIMOUS(ABSENT ) AYES: NOES: ABSENT: ABSTAIN: GC:pc an actiontiaken andteintereetd on the minutesrrect ofofthe c:B028.tl I Board of Supervisors on the date shown. ATTESTED: b'----1--- _ 19 1 9 QS PHIL BATCHELOR,Clerk ofthe�— Contact: Greg Connaughton of Supervisors and County Administrator Orig. Div: Public Works (Maint.) cc: See next page By ,Deputy Agreement With Byron Bethany Page 2 The estimated cost of the culvert replacement is $30,000. Efficient pipe installation will require the temporary closure of Camino Diablo Road. It is anticipated that five (5) consecutive work days will be required to complete the installation. However, due to the time of year, a closure of sixteen (16) calendar days is requested as a contingency for bad weather. IV. Consequences of Negative Action: Failure to approve the subject agreement will lose the opportunity to constructively resolve the issue of culvert replacement. Without road closure, project costs will increase substantially. cc: County Admin. Auditor Controller Byron Bethany Irrig. Dist. PW Accounting