HomeMy WebLinkAboutMINUTES - 12191995 - C5 TO: BOARD OF SUPERVISORS iv
FROM: J. MICHAEL WALFORD, PUBLIC WORKS DIRECTOR
DATE: December 19, 1995
SUBJECT: Approval of Contract Change Order Nos. 14 and 15 for the Appian Way Triangle
Realignment, Project No. 0662-6R4056-88, EI Sobrante area.
Specific Request(s)or Recommendation(s)&Background&Justification
I. Recommended Action:
APPROVE Contract Change Order Nos. 14 and 15, in the approximate amounts of$11,000.00 and
$3,000.00 respectively, and AUTHORIZE the Public Works Director to execute them in order to
compensate the contractor, Joe Carone, Inc., for removal and replacement of a handicapped ramp
and for other unforseen extra work.
II. Financial Impact:
The project contingency funds are sufficient to cover the change order costs. The source of funds
is State and Federal funds (60%), EI Sobrante A.O.B. (30%) and West County Wastewater District
(10%).
III. Reasons for Recommendations and Background:
The cumulative.total of Contract Change Orders Nos. 1 through 15 exceeds $25,000.00, requiring
Board approval. Due to the original signal location, curb removal and replacement were required.
IV. Consequences of Negative Action:
The lack of approval would preclude payment for work that was performed in good faith.
Continued on attachment: _yes
SIGNATURE:
RECOMMENDATION OF COUNTY ADMINISTRATOR
RECOMMENDATION OF BOARD COMMITTEE
APPROVE OTHER
SIGNATURE(S):
ACTION OF BOARD ON' . 49 I96- APPROVED AS RECOMMENDED ✓ OTHER
VOTE OF SUPERVISORS
✓ UNANIMOUS (ABSENT
AYES: NOES:
ABSENT: ABSTAIN:
Contact: Joseph P. Murphy, (510) 313-2321
Orig. Div,: PW(Constr)
cc: County Administrator
Auditor-Controller
Public Works Ihereby cortifythat this Isatrue and correct copy of
- Accounting, R. Gilchrist an action taken and entered on the minutes of the
- Construction, R. Bruno Board of Supervisors on the date shown.
- Design ATTESTED:.. I�1 . 1 99.s"
PHIL BATCHELOR,clerk oft the Board
Contractor of Supervisors and County Administrator
RB:tt By Deputy
g:\CONST\BO\AWT-19.t12