HomeMy WebLinkAboutMINUTES - 12191995 - C4 TO: BOARD OF SUPERVISORS
FROM: J. MICHAEL WALFORD, PUBLIC WORKS DIRECTOR
DATE: December 19, 1995
SUBJECT: Approval of Contract Change Order No. 6 for the Olympic Boulevard Widening project,
Project No. 0662-6R4092-93, Walnut Creek area.
Specific Request(s)or Recommendations)&Background&Justification
I. Recommended Action:
APPROVE Contract Change Order No. 6, in the approximate amount of$38,000.00, and Authorize
the Public Works Director to execute it in order to compensate the contractor, Ghilotti Brothers
Construction, Inc. for additional work.
II. Financial Impact:
The project contingency funds are sufficient to cover the change order costs. The project is funded
by State and Federal funds (77%) and South Walnut Creek A.O.B. (23%).
III. Reasons for Recommendations and Background:
The cumulative total of Contract Change Orders Nos. 1 through 6 exceeds $25,000.00, requiring
Board Approval. Additional work to prepare roadway for overlay paving.
IV. Consequences of Negative Action:
The lack of Approval would preclude payment for work that was performed in good faith.
Continued on attachment: _yes
SIGNATURE �L
RECOMMENDATION OF COUNTY ADMINISTRATOR
RECOMMENDATION OF BOARD COMMITTEE
APPROVE OTHER
SIGNATURE(S):
ACTION OF BOARD ON: .w..l,�.. 19 , 1�'°I5 APPROVED AS RECOMMENDED OTHER
VOTE OF SUPERVISORS
UNANIMOUS (ABSENT
AYES: NOES:
ABSENT: ABSTAIN:
Contact: Joseph P. Murphy, (510) 313-2321
Orig. Div.: PW(Constr)
cc: County Administrator
Auditor-Controller
Public Works IherebyceRifyft" hisbatmewdoottec mythcf
Accounting, R. Gilchrist an action taken and entered on the minutes of the
Board of Supervisors on the date shown.
- Construction, R. Bruno ATTESTED; =j o Q , 19
- Design PHIL BATCHELOR,Clerk of the Board
Contractor of Supervisors and County Administrator
g:\CONST\BO\OBW-19.t12 By -•Deputy