HomeMy WebLinkAboutMINUTES - 11071995 - C6 TO: BOARD OF SUPERVISORS
FROM: J. MICHAEL WALFORD, PUBLIC WORKS DIRECTOR
DATE: November 7, 1995
SUBJECT: Approve and Authorize the Chair to Execute Program Supplement No.089 Rev 1, Which
Provides $566,400 in Federal Aid Funds for the Replacement of the Camino Tassajara
Bridge. Project No. 0662-6R 4072
SPECIFIC REQUESTS) OR RECOMMENDATIONS) & BACKGROUND AND JUSTIFICATION
1. Recommended Action:
APPROVE and AUTHORIZE the Chair of the Board of Supervisors to execute Program
Supplement No. 089 Rev 1, which provides $566,400 in Highway Bridge Replacement and
Rehabilitation (HBRR) funds for Preliminary and Construction Engineering, Right-of-Way and
Construction of Camino Tassajara Bridge Replacement.
II. Financiallmoact:
The supplement provides reimbursement from HBRR funds for 80°x6 of the County's estimated
cost for Preliminary and Construction Engineering, Right-of-Way and Construction of the project.
III. Reasons for Recommendations and Background:
On June 21, 1977 the Board approved County/State Master Agreement No. 04-5928 for the
funding of Federal Aid Projects.
On June 1,1989 Contra Costa County qualified for Federal Bridge Replacement funds for the
Camino Tassajara Bridge Replacement.
IV. Consequences of Negative Action:
If this program is not approved the County will have to absorb th tire cost of the project or the
project will not be built.
Continued on Attachment: SIGNATURE: �' kv—
�'
_RECOMMENDATION OF COUNTY ADMINISTRATOR
_RECOMMENDATION OF BOARD COMMITTEE
APPROVE OTHER
SIGNATURE(S):
ACTION OF BOARD ON h)-t ti 7J 1111S APPROVED AS RECOMMENDED OTHER_
VOTE OF SUPERVISORS
.✓ UNANIMOUS(ABSENT )
AYES: NOES:
ABSENT: ABSTAIN:
BH:eh
g:\transeng\bh\bo7PS89.t11 I hereby certify that this to a to and correct copy of
an action taken and entered on the minutes of the
Orig.Div: Public Works(T/E)(2 orig.&sealed) Board of Supervisors on the date shown.
Contact: Dave Suico,Tel.313-2264 ATTESTED: iL It,. 1..21_ .L 9
cc: GMEDA Director PHIL BAT HELOR,Clerk of t e Board
Accounting of Supervisors and County Administrator
Deputy
` Date: September 21, 1995
PROGRAM SUPPLEMENT NO. . 089 Rev. l Location: 04-CC -0-CR
to Project Number: BRLS-5928 (002)
LOCAL AGENCY-STATE AGREEMENT I E.A. Number: 04-066884
FOR FEDERAL-AID PROJECTS NO. 04-5928
This Program Supplement is hereby incorporated into the Local Agency-State
Agreement for Federal Aid which was entered into between the Local Agency
and the State on 06/21/77 and is subject to all the terms and conditions
thereof. This Program Supplement is adopted in accordance with Paragraph 2
of Article II of the aforementioned Master Agreement under authority of
Resolution No. C, (p approved by the Local Agency on
(See copy attached) .
The Local Agency further stipulates that as a condition to payment of funds
obligated to this project, it accepts and will comply with the covenants or
remarks setforth on the following pages.
PROJECT TERMINI:
CAMINO TASSAJARA BRIDGE, CAMINO TASSAJARA ROAD,
0.8 MILE SOUTH OF HIGHLAND ROAD; BRIDGE NO. 28C-0157
TYPE OF WORK: BRIDGE REPLACEMENT LENGTH: 1 . 0 (MILES)
PROJECT CLASSIFICATION OR PHASE(S) OF WORK
[X] Preliminary Engineering [X] Right-of-Way. [ ]
[X] Construction Engineering [X] Construction
Estimated Cost ] Federal Funds Matching Funds
Local OTHER OTHER
$ 708000 118 $ 566400 $ 141600 $ 0 $ 0
$ 0
Contra Costa County STATE OF CALIFORNIA
Departmet of, ansportation
By JBy
Chief, District Liaison Branch
Office of Local Programs
Date. . '�T�C�O��r Date /Z --2-,57 "' Fj—
Attest
Title
I hereby Certify upon my personal knowledge that budgeted funds are available for this encumbrance:
Accounting officer� Date / 95 _ $ 566400. 00
Chapterl Statutes l Item i Year l Program ISCI Fund Source l AMOUNT
587 1992 2660-101-890 92-93 20.30.010.300 C 224060 892-F 33160.00
139 1994 2660-101-890 94-95 20.30.010.300 C 224060 892-F 0.00
303 1995 2660-101-890 95-96 20.30.010.300 C 224060 892-F 533240.00
FORM
VICTOR J. vvF_-STM N' i: l oufls-?
Page 1 of 2
gy Deputy
P
(. a
04-CC -0-CR DATE: 09/21/95
BRLS-5928 (002)
SPECIAL COVENANTS OR REMARKS
1. This Revised Program Supplement supersedes Program Supplement
approved by the Local Agency ' s Governing Body on 03/11/93
2 . All maintenance, involving the physical condition and the
operation of the improvements, referred to in Article VI
MAINTENANCE of the aforementioned Master Agreement will be
performed by the Local Agency and/or the respective agencies as
determined by agreement at regular intervals or as required for
efficient operation of the completed improvements.
3 . The Local Agency will advertise, , award, and administer this
project and will obtain the State ' s concurrence prior to either
award or rejection of the contract.
4 . The Local Agency agrees the payment of Federal funds will be
limited to the amounts approved by the Federal Highway
Administration in the Federal-Aid Project Agreement (PR-2) /Detail
Estimate or its modification (PR-2A) or the FNM-76, and accepts
any increases in Exchange Funds, State Matching funds, and\or
Local Agency Funds as shown on the Finance or Bid Letter or its
modification as prepared by the Office of Local Programs.
5 . In executing this Program Supplemental Agreement, Local
Agency hereby reaffirms the "Nondiscrimination Assurances"
contained in the aforementioned Master Agreement for
Federal-Aid Program.
6. Whenever the local agency uses a consultant on a cost plus basis,
the local agency is required to submit a post audit report cover-
ing the allowability of cost payments for each individual consul-
tant or sub-contractor incurring over $25, 000 on the project.
The audit report must state the applicable cost principles utili-
zed by the auditor in determining allowable costs as referenced in
CFP. 49 , part 18, Subpart C - 22 , Allowable Costs.
Page 2 of 2
STATE OF CALIFORNIA-BUSINESS,TRANSPORTATION AND HOUSING AGENCY PETE WILSON,Governor
DEPARTMENT OF TRANSPORTATION
STATE AND LOCAL PROJECT DEVELOPMENT PROGRAM
1120 N STREET
P.O.BOX 942674 V
TDD(916)6544014 94274-0001 LRECCE1
(916) 654-3151
FAX(916) 654-2409 JAN
� 3
December 26, 1995 :ENG
NE
ER11VO
File: 04 - CC -0-CR
BRLS-5928(002)
CAMINO TASSAJARA BRIDGE
REPLACEMENT NO. 28C-0157
Mr. Michael Walford
Director of Public Works
Contra Costa County
255 Glacier Drive
Martinez, CA 94553-4987
Dear Mr. Walford :
Enclosed is your fully executed copy of Program Supplement Agreement Number 089 Rev. 1
to Local Agency-State Agreement No. 04-5928 covering preliminary,construction engineering
and construction&r/w for the above-referenced project.
Sincerely,
HERB REINL, Chief
Office of Local Programs
Project Implementation
Enclosure
cc: OLP AE project files
DLAE- 04
"We'll Find a Way"