HomeMy WebLinkAboutMINUTES - 01181994 - 1.3 TO: BOARD OF SUPERVISORS .
FROM: J. MICHAEL WALFORD, PUBLIC WORKS DIRECTOR
DATE: January 18, 1994
SUBJECT: Appian Way Triangle Widening - Soil Nail Wall Consulting Services Agreement
Amendment No. 1
Project No.: 0662-6R4056-88
SPECIFIC REQUEST(S) OR RECOMMENDATIONS) &BACKGROUND AND JUSTIFICATION
I. Recommended Action:
APPROVE and AUTHORIZE the Public Works Director to execute Contract Amendment No. 1
to the Consulting Services Agreement with Geospectra Engineers and Geoscientists for the
Appian Way Triangle Widening Project.
II. Financial Impact:
There will be no impact to the County General Fund. The $7,800 increase_ for this contract
amendment will be funded by the EI Sobrante Area of Benefit (46%) and the City of Richmond
(54%).
III. Reasons for Recommendations and Background:
The Board of Supervisors on September 14, 1993 authorized the Public Works Director to
execute a Consulting Services Agreement with Geospectra Engineers and Geoscientists to
provide a geotechnical design for two soil nail retaining walls on the Appian Way Triangle
Widening Project. It has been mutually determined that additional investigation of subsurface
conditions is required in order to complete the geotechnical design of the soil nail walls.
IV. Consequences of Negative Action:
If this Resolution is not approved the design of the Appian Way.Triangle Widening Project cannot
be completed and the project cannot be constructed.
Continued on Attachment: SIGNATURE:
_ RECOMMENDATION OF COUNTY ADMINISTRATOR
RECOMMENDATION OF BOARD COMMITTEE
APPROVE OTHER
SIGNATURE(S):
ACTION OF BOARD ONJAN 1994 APPROVED AS RECOMMENDED OTHER
VOT"F SUPERVISORS
!/ UNANIMOUS (ABSENT )
AYES: NOES:
ABSENT: ABSTAIN: i hereby certify that this is a true and correct copy gf
an action taken and entered on the minutes of the
JO:jIg Board of Supervisors on the data shown.
c\BO:BO18.t1 ATTESTED: N�994
PHIL BATCHELOR,Clerk of the Board
Contact: Joe Olsen, (313-2284) of Supervisors andCo my Administrator
Orig. Div: Public Works (Design Division)
cc: Geospectra Engineers&Geoscientists By „ ,'19eputy
Auditor-Controller
R. Gilchrist,Accounting
E. Kuevor, CAO