HomeMy WebLinkAboutMINUTES - 01181994 - 1.3 TO: BOARD OF SUPERVISORS . FROM: J. MICHAEL WALFORD, PUBLIC WORKS DIRECTOR DATE: January 18, 1994 SUBJECT: Appian Way Triangle Widening - Soil Nail Wall Consulting Services Agreement Amendment No. 1 Project No.: 0662-6R4056-88 SPECIFIC REQUEST(S) OR RECOMMENDATIONS) &BACKGROUND AND JUSTIFICATION I. Recommended Action: APPROVE and AUTHORIZE the Public Works Director to execute Contract Amendment No. 1 to the Consulting Services Agreement with Geospectra Engineers and Geoscientists for the Appian Way Triangle Widening Project. II. Financial Impact: There will be no impact to the County General Fund. The $7,800 increase_ for this contract amendment will be funded by the EI Sobrante Area of Benefit (46%) and the City of Richmond (54%). III. Reasons for Recommendations and Background: The Board of Supervisors on September 14, 1993 authorized the Public Works Director to execute a Consulting Services Agreement with Geospectra Engineers and Geoscientists to provide a geotechnical design for two soil nail retaining walls on the Appian Way Triangle Widening Project. It has been mutually determined that additional investigation of subsurface conditions is required in order to complete the geotechnical design of the soil nail walls. IV. Consequences of Negative Action: If this Resolution is not approved the design of the Appian Way.Triangle Widening Project cannot be completed and the project cannot be constructed. Continued on Attachment: SIGNATURE: _ RECOMMENDATION OF COUNTY ADMINISTRATOR RECOMMENDATION OF BOARD COMMITTEE APPROVE OTHER SIGNATURE(S): ACTION OF BOARD ONJAN 1994 APPROVED AS RECOMMENDED OTHER VOT"F SUPERVISORS !/ UNANIMOUS (ABSENT ) AYES: NOES: ABSENT: ABSTAIN: i hereby certify that this is a true and correct copy gf an action taken and entered on the minutes of the JO:jIg Board of Supervisors on the data shown. c\BO:BO18.t1 ATTESTED: N�994 PHIL BATCHELOR,Clerk of the Board Contact: Joe Olsen, (313-2284) of Supervisors andCo my Administrator Orig. Div: Public Works (Design Division) cc: Geospectra Engineers&Geoscientists By „ ,'19eputy Auditor-Controller R. Gilchrist,Accounting E. Kuevor, CAO