Loading...
HomeMy WebLinkAboutMINUTES - 12131994 - 1.18 u TO: BOARD OF SUPERVISORS J, 12 FROM: J. MICHAEL WALFORD, PUBLIC WORKS DIRECTOR DATE:, DECEMBER 6, 1994 SUBJECT: ACCEPT THE STATUS AND EXPENSE REPORT THROUGH THE FIRST QUARTER OF FISCAL YEAR 1994-95, CANYON LAKES GEOLOGIC HAZARD ABATEMENT DISTRICT Specific Request(s) or ecommen a ions Background u i ica ion I. Recommended Action: ACCEPT the Canyon Lakes Geologic Hazard Abatement District (GHAD) Status and Expense Report for the first quarter of Fiscal Year 1994-95. II. Financial Impact: No County General Fund impact. III. Reasons for Recommendations and Background: During the first quarter, the District continued with revegetation of slopes for stabilization and construction of B-58 drainage ditch systems. As to the status of our budget, the construction costs through the first quarter of$42,361.00 are approximately 27% of our annual construction budget, and our total expenses through this quarter ($94,050.00) are approximately 31% of our total annual budget. IV. Consequences of Negative Action: The quarterly report will not be accepted as required by original formation of the GHAD. Continued on attachment: —yes SIGNATURE: RECOMMENDATION OF COUNTY ADMINISTRATOR RECOMMENDATION OF BOARD COMMITTEE APPROVE OTHER SIGNATURE(S): ACTION OF BOARD ON: DEC 13 94 APPROVED AS RECOMMENDED_OTHER VOTE OF SUPERVISORS X- UNANIMOUS (ABSENT AYES: NOES: ABSENT: ABSTAIN: Orig.Div.: PW(Special Districts) Contact: Skip Epperly,(510)313-2253 cc: Auditor-Controller Accounting 1 hereby certify that this is a true and correct copyof SE:pe an action taken and entered on the minutes of the g:\FLDCTL\SPDist\BO\GHAD2-6.t12 Board of Supgrs on the date shown. ATTESTED: 4nn t PHIL Bpi' EL CI AJ the Boarder of Supervisors and unty Administrator r By .Deputy w CANYON LAYCFS'. EOIr0GiC F#AZPiRD A .4TF.11 1 T`:3�iSTRICT :FINANCIAL REPO .. .... _. ',_.. - :' _. •• -::._- - .. �.. _- =:November 1;_;1994 - .. .. BUDGET ACTUAL EXl LASES A. SAVINGS ACC OI7N T JUL '94-N9'95 RM '94-SEPT'94 I 1. Balance('Reserve)brough'forward $627,000. 2. Annual Income via Assessments: 3293,000. 743 Singele Family Detached -469 Towniaouses 2,576 Condominiums/Rentals 100,000 square feet Commercial 3. Estimated Interest Xarnincr TOTAL ESTIN_A3TET7 FUNDS: $920,000. C. PROJZ CTED EXPENSES 1. General Manager ; S 15,000. $ 4,750. 2. Fzzgineering Geologist and Assistant Geologist 58,000. 14,862: 3. -Suppart'se races (e.g. office spate, -office'equipment, office staff .'; vehicles) 4. -*-a)Repair;'miintenance2anSmprovements' �(a5 per approved Repair,Maintenance and Improvement Program) 159,000. 42,361.- b)Construction Administration 27,000. . 9,169. 5. Legal, accounting and insurance "5000. 0 6. .Professional Soils& Geotechnical Consulting 12,000. 7,135- 7. Professional Civil Engineering and Environmental Consulting 4,000. 8,523. 8. County staff services 10,000. 0 9. Assessment documents preparation '10.000. '7,250. TOTAL EXPENSES: $300,000. $94,0S0. 9. Reserve I 5620 000. TOTAL$'MGET:` $920,000. * Included in items 1,2 azzd 4(b). i I ,x O CANYON':1,A ES .GELOGIC A� t RD. A`i'EMEEN .. •; • .. - _ . _ �:REI'.4YK•'AP+1D �1'vIPROVENIEIV'T•.I'1t4,jECTS=�'=. • .: .:.:. - •. - ' .. . .._.,:.,...,•:,:.....•.. ly�g4.1995 'FISCAL':-YE .:, - -=• :. Est." Budget Actual Cost Category (FY'94/'95) (July-Sept.) Slope Stabilization 1. Corrective Grading 21,000.00 0.00 2. Revegetation 201000.00 211467.32 3. -Slope Erosion Protecdoa 20,000.00 0.00 4. Retaining orPPin Walls 10,000.00 1,008.34 Surface Drainage !:,Improvements ..:' Maint,B_58 brain.syst -$,000.00 87.50 - 6. .const, =ss:Dra;in.Syst.:_. Ooo:oO:. 6'7Ss:21 _ :z�Maintenaiice� _5;000.00N. '0.00 _ 8. Erosion/Runoff Cont.Devices •. . 7,000.00 0.00 Subsurface Drainage 9. Subdrain Insp. and Maint. 8,000.00 560.00 10. Horiz. Drain Insp, and Maim 20,000.00 0,00 11, Drilling Horiz. D'ra ns 20,000.00 0.p0 j Repair of Existing Improvements • i 12. Insp. and Repair of Drain Struck. 10,000.00 0.00 13. Other Construction Projects 6,000.00 12.480.00 TOTAL $ 139,400.00 $ 42,361.37 27%