HomeMy WebLinkAboutMINUTES - 11081994 - 2.6 f j -'•:• Contra
TO: BOARD OF SUPERVISORS
Costa
FROM: HARVEY E. BRAGDON County
DIRECTOR OF COMMUNITY DEVELOPMENT o
n•. _ ti4
DATE: November 8 , 1994 osTycouKr't 'cA~
SUBJECT: Ratification of Zoning Administrator's Decisions Regarding Shell Oil
Company's Compliance with Conditions of Approval (LUP 2009-92)
SPECIFIC REQUEST(S) OR RECOMMENDATIONS) & BACKGROUND AND JUSTIFICATION
RECOMMENDATIONS
1 . Ratify the Zoning Administrator's decision that Shell Oil
Company has complied with Condition of Approval #35A for the
Cogeneration Unit, the Cracked Gasoline Depentanizer, the
Heavy Gasoline Hydrotreater, the Distillate Hydrotreater, the
Boiler Feedwater Treatment Area, the Delayed Coker Unit, and
the Sulfur Recovery Unit.
2 . Ratify the Zoning Administrator' s decision that Shell' Oil
Company has complied with Condition of Approval #13 which
requires an update of the Spill Prevention Control and
Countermeasure Plan.
FISCAL IMPACT
None.
BACKGROUND/REASONS FOR RECOMMENDATIONS
When the Board of Supervisors approved the Land Use Permit for
Shell Oil Company' s Clean Fuels Project (County LUP 2009-92) , the
Board specified that the Zoning Administrator' s decision regarding
several Conditions of Approval must be placed on the consent
calendar for ratification. As directed by the Board at the October
4 , 1994 meeting, this item has been placed on the Zoning
Administrator' s agenda for November 7 , 1994 . Any comments received
at this meeting will be forwarded to the Board.
Condition of Approval #35A - Noise Calculations:
This Condition requires Shell Oil Company to submit noise level
calculations which demonstrate that the project units will comply
with the noise performance standard of 77 dBA when measured fiv
CONTINUED ON ATTACHMENT: X YES SIGNAT
RECOMMENDATION OF COUNTY ADMINISTRATOR RECOMM B RD COMMITTEE
APPROVE OTHER
SIGNATURE(S) :
ACTION OF BOARD ON November 8, 1994 APPROVED AS RECOMMENDED x OTHER
VOTE OF SUPERVISORS
I HEREBY CERTIFY THAT THIS IS A
x UNANIMOUS (ABSENT IV TRUE AND CORRECT COPY OF AN
AYES: NOES: ACTION TAKEN AND ENTERED ON THE
ABSENT: ABSTAIN: MINUTES OF 'i'HE BOARD OF
SUPERVISORS ON THE DATE SHOWN.
Contact:Catherine Kutsuris - 646-2031
Orig: Community Development Department ATTESTED November 8 , 1994
cc: County Counsel PHIL BATCHELOR, CLERK OF
Shell Oil Company THE BOARD OF SUPERVISORS
A COUNTrDMINISTRATOR
BY , D 2PUTY
2 .
feet above the ground and 100 feet from the equipmt�nt. This noise
performance standard assures that the project will not increase
noise levels at the nearby residences.
Shell Oil Company submitted Noise Calculations for the Cogeneration
Unit, the Cracked Gasoline Depentanizer, the Heavy Gasoline
Hydrotreater, the Distillate Hydrotreater, the Boiler Feedwater
Treatment Area, the Delayed Coker Unit, and the Sulfur Recovery
Unit. As required by the Conditions of Approval, the reports were
prepared by an individual who is a registered engineer or a member
of the Institute of Noise Control Engineering and who has at least
five years experience in noise control engineering. The reports
submitted verify; that the units will meet the noise control
standards.
Condition of Approval #13 - Spill Prevention Control and
Countermeasure Plan:
This Condition requires Shell Oil to update the Spill Prevention
Plan to include the Clean Fuels Project and to inc•.lude:
* Secondary containment providing 100 percent capacity for
all tanks.
* Segregation of oil surfaces and surface runoff by
physical barriers;
* Operational controls such as limited access to gates at
discharge locations, logging procedures for gate
operation, maintenance and inspection procedures and
worker education;
Shell Oil submitted their revised Spill Prevention Control and
Countermeasure Plan which addresses these requirements.