HomeMy WebLinkAboutMINUTES - 11081994 - 1.102 - Contra TO: REDEVELOPMENT AGENCY •.� WJIa os` FROM: Phil BatchelorCounty Executive Director " DATE : November 8, 1994 SUBJECT: FY 1994-95 Redevelopment Agency Budget SPECIFIC REQUEST(S) OR RECOMMENDATIONS (S) & BACKGROUND AND JUSTIFICATION RECOMMENDATIONS ADOPT the attached annual Redevelopment Agency budget for fiscal year 1994-95 in compliance with California Community Redevelopment Law. FISCAL IMPACT This budget provides for no General Fund subvention of the Agency (see below) . BACKGROUND/REASONS FOR RECOMMENDATIONS California Community Redevelopment Law (Health & Safety Code Section 33606) requires in part that the Redevelopment Agency adopt an annual budget containing specific information. The attached report fulfills the requirements of Redevelopment Law and establishes a framework for implementation of the Contra Costa County Redevelopment Agency budget for fiscal year 1994-95. This budget has been reviewed by local Project Area Committees . CONTINUED ON ATTACHMENT: YES SIGNATURE : ye� RECOMMENDATION OF EXECUTIVE DIRECTOR REC DATION O AGENCY CO ITTEE APPROVE OTHER SIGNATURE (S) : ACTION OF AGENCY ON November 8 , 1994 APPROVED AS RECOMMENDED x OTHER VOTE OF COMMISSIONERS I HEREBY CERTIFY THAT THIS IS A x UNANIMOUS (ABSENT • ) TRUE AND CORRECT COPY OF AN AYES: NOES: ACTION TAKEN AND ENTERED ON THE ABSENT: ABSTAIN: MINUTES OF THE REDEVELOPMENT AGENCY ON THE DATE SHOWN. Contact: Jim Kennedy 646-4076 ATTESTED November 8 , 1994 cc: Community Development PHIL BATCHELOR Redevelopment Agency AGENCY SECRETARY County Counsel County Administrator Auditor-Controller BY a DEPUTY JK:1h sra16/budget.bos HIGHLIGHTS • To comply with the 1994-95 State budget, $149, 000 in Agency revenue must be redirected to the State for redistribution to the schools; • To continue the Transportation Demand Management (TDM) Program at the Pleasant Hill BART Station Area, the Agency will make a $300, 000 payment on its loan balance; • Completion of a First Time Homebuyer Mortgage Assistance Program in three project areas - Oakley, Bay Point, and North Richmond; • Economic Development activities, including facade rehab- ilitation, property acquisition/development, and downtown plans, totaling over $2 million in four project areas - North Richmond, Bay Point, Oakley, and Rodeo; • Continuation of the OPEN Jobs Program to link jobs to local population - North Richmond; • Major infrastructure improvements including: 1 . Traffic studies/preliminary engineering and environmental documentation for circulation improvements in the Pleasant Hill BART Station Area; 2 . Completion of the Iron Horse Trail in the former SP right-of-way between Treat and Monument (except for the Hookston Station area) ; 3. Brookside Drive realignment - North Richmond; 4 . Willow Pass Road improvements - Bay Point; 5. Flood control improvements - Bay Point; 6. Highway 4 improvements - Oakley; 7 . Park improvements - Oakley; 8 . Major road, drainage and sewer improvements for the Sand Hill area - Oakley; 9. Gateway improvements - Rodeo; 10 . Seismic upgrade to Rodeo Fire Station - Rodeo. • Major housing development financial assistance, including: 1 . Area 4 residential site assemblage - Pleasant Hill BART; 2 . North Richmond Senior Housing - North Richmond; 3 . Alves Lane Housing Reconstruction - Bay Point; 4 . Golden Oak Senior Manor - Oakley; 5. Capacity building for a neighborhood based non-profit - North Richmond. • Community improvement activities include: 1 . Clean-up and improving an unutilized portion of Del Hombre Lane as a respite area; 2 . COMET activities - North Richmond; 2 3. Planning facilitator for P-1 Rezoning Program - North Richmond; 4 . PRIDE activities (landscaping, code enforcement, banners) - Bay Point; 5. Library seed funds - Oakley. 3 CONTRA COSTA COUNTY REDEVELOPMENT AGENCY BUDGET AND WORK PROGRAM FOR FISCAL YEAR 1994-95 INTRODUCTION California Community Redevelopment Law (Health & Safety Code Section 33606) requires the Redevelopment Agency to adopt an annual budget containing the following: - Proposed expenditures of the Agency; - Proposed indebtedness to be incurred by the Agency; - A work program for the coming year, including goals; and - An examination of the previous year' s achievements . 4 I. PLEASANT HILL HART STATION AREA A. R,EVEMMS/RFV 'NUES Total FY 1994-95 revenues and budget expenditures are $14, 498, 152 as shown: PLEASANT HILL BART STATION AREA 10/28/94 SOURCES & USES ------------USES---------------- ----------------------------------------SOURCES----------------------------------------- ******Tax Increments******* *******Bond Proceeds******* Specific Other Capital Funds Housing Funds Capital Funds Housing Funds Plan Fees Revenues TOTAL Payments to Other Agencies *Fiscal Agreements $100,000 $100,000 *SRAF Payment $105,000 $105,000 capital Projects *Circulation Improvements -Frelim Eng/Traffic Studies/SIR $200,000 ;200,000 -construction Fund $6,239,000 ;4,259;432 ;10,498,432. *Iron Horse Trail $136,000 $136,000 *Del Sombre Repair $50,000 $50,000 *Unallocated $120,885 $120,885 Property Expenses *Takes/Misc $35,000 $35,000 *Area 4 Housing Consultant $25,000 $25,000 Park Regency Financial Assistance $200,900 $464,100 $665,000 Debt Service *County Debt $300,000 $300,000 *Bonded Indebtedness $1,141,000 $815,000 c ;1,956,000 *Glenfed Interest Payment $108,000 $108,000 Administration stration *Salaries $5,000 $5,000 *services & Supplies $190,710 $190,710 *Equipment $3,125 $3,125 TOTALS $2,384,620 a $464,100 b $6,239,000 $0 $4,595,432 $815,000 $14,498,152 a: 1994-95 Tax Increment of $1,821,000; Carry-Over of $351,000; Interest Earnings of $20,620; & Earnings on Real Estate of $192,000. b: 1993-94 Tax Increment of $455,000; Carry-Over of $0; & Interest Earnings of $9,100. c: Additional interest income on escrowed funds $484,000; & capitalized interest $331,000 5 B. PROJECT DESCRIPTION: PLEASANT HILL BART STATION AREA 1 . Fiscal Agreements: Pass-thru payments to Taxing Agencies pursuant. to approved Fiscal Agreements . 2 . ERAF (Educational Revenue Augmentation Fund) Payment: Mandated contribution to the State of California to alleviate the State' s budget crisis . 3. Circulation Improvements: Traffic studies and preliminary analyses of alternative circulation improvements in the area, including the North Main Realignment and Buskirk Avenue. Construction funds are reserved for future project (s) to be determined. 4 . Iron Horse Trail : Completion of Iron Horse Trail from Coggins to Treat Boulevard. 5. Del Hombre Repair: Conversion of a remnant portion of Del Hombre to a respite area to complement the Iron Horse Trail. 6. Property Taxes : Special assessments/special taxes on Agency held property. 7 . Area 4 Housing Consultant: Real estate consultant to assist the Agency in preparing and evaluating requests for development proposals for Area 4 . 8 . Park Regency Financial Assistance: Contractually obligated payment to Park Regency owner for affordable housing. 9. County Debt: Repayment of funds borrowed from County Assessment District 1983-1 . Repaid monies to fund Transportation Demand Management (TDM) Program at the Pleasant Hill BART Station. 10 . Bonded Indebtedness : Principal and interest due on outstanding bonded indebtedness . 11 . Glenfed Interest Payment: Payment on interest only note with Glendale Federal Savings for acquisition of Area 4 residential site. 12 . Administration: Salaries, services, supplies, and equipment in support of project implementation. C. INDEBTEDNESS - PLEASANT HILL BART STATION AREA As of June 30, 1994, the Agency has approximately $27 .51 million in debt . The major elements of Agency debt for the Pleasant Hill BART Station Area are: • $22 . 68 million Tax Allocation Bonds issued in June, 1992 . • $1 . 38 million due to Pleasant Hill BART TSM fund for an advance from transit fees . • $2 . 1 million due to the County Affordable Housing Trust Fund for property acquisition (Area 4) . • $1 .20 million due Glendale Federal Savings for property acquisition (Area 4) . • $105, 000 due to State of California pursuant to the State budget bill . 6 II . NORTH RICHMOND REDEVELOPMENT PROJECT AREA A. REVENUES/EXPENSES Total 1994-95 revenues and budgeted expenditures are $1, 562, 780 as shown below: NCRTH RICHMOND REDEVELOPMENT PROJECT AREA 10/25/94 SOURCES & USES ------------USES---------------- ----------------------------------SOURCES------------------------------------- ******Tax Increments******* *******Bond Proceeds******* Other Capital.Funds Housing Funds.Capital Funds Housing Funds Revenues TOTAL ------------- ------------- ------------- ------------- -------- --------- Payments to Other Agencies *Fiscal Agreements $0 $0 *ERAF Payment $3,000 $3,000 Capital Projects *Brookside Drive Realignment $638,000 $638,000 *Unallocated Capital Funds $62,963 $8,000 $70,963 Community Improvement Programa *COMET Activities $10,000 $10,000 *OPEN Jobs Program $10,000 $10,000 *P-1 Planning Facilitator $7,500 $7,500 Housing Projects *Infill Housing $15,000 $15,000 *Senior Housing Project $18,660 $63,000 $500,000 $581,660 *Unallocated Housing Funds $0 $0 *CHDC Capacity Building/Support $2,500 $15,000 $17,500 Debt Service *County Debt $0 *Bonded Indebtedness $77,300 $17,700 $95,000 Administration *Salariea $1,000 $1,000 *Services & Supplies $112,532 $112,532 *Equipment $625 $625 TOTALS $287,420 a $51,360 b $646,000 $63,000 $515,000 $1,562,780 a: 1994-95 Tax Increment of $206,300; Carry-Over of $77,000; & Interest Earnings of $4,120. b: 1994-95 Tax Increment of $50,700; Carry-Over of $0; & Interest Earnings of $660. 7 B. PROJECT DESCRIPTION: NORTH RICHMOND 1 . Fiscal Agreements: Pass-thru payments to Taxing Agencies pursuant to approved Fiscal Agreements . 2 . ERAF (Educational Revenue Augmentation Fund) Payment: Mandated contribution to the State of California to alleviate the State' s budget crisis . 3 . Brookside Drive Realignment: Project to eliminate two hazardous ninety degree turns on Brookside Drive, a major circulation corridor into the employment area of North Richmond. 4 . Unallocated Capital Funds : Capital Project funds reserved for future designation. 5. COMET Program: Redevelopment Agency contribution to a comprehensive County/City neighborhood improvement program. 6. OPEN Jobs Program: Continued funding of Rubicon' s program to link jobs being created in employment area of North Richmond to the local residents . 7 . P-1 Planning Facilitator: Planning consultant to work with the North Richmond Municipal Advisory Council, the County, and the Agency in fine tuning the North Richmond rezoning program. 8 . Infill Housing: Completion of repair work on 5th Street and Giaramita Street homes . 9. Senior Housing Project: Land acquisition/relocation for a 50-unit senior citizen housing project. Project in process of securing development approvals, and developing a plan of finance. 10 . Unallocated Housing Funds : Housing funds reserved for future designation. 11 . CHDC Capacity Building: Administrative support for a neighborhood based non-profit housing developer - Community Housing Development Corporation of North Richmond. 12 . County Debt: None. 13. Bonded Indebtedness: Principal and interest due on outstanding bonded indebtedness . 14 . Administration: Salaries, services, supplies, and equipment in support of project implementation. C. INDEBTEDNESS The Agency has incurred approximately $2 . 08 million in debt as of June 30, 1994 . The major elements include: • $1 . 13 million Tax Allocation Bonds issued in June, 1992; • $310, 000 to the County for advances from the County Affordable Housing Trust Fund; • $3, 000 due to the State of California pursuant to SB 617 budget bill . • $637, 000 contracted obligations with the County for road improvements . 8 III . SAY POINT REDEVELOPMENT PROJECT AREA A. REVENUES/EXPENSES Total 1994-95 revenues and budgeted expenditures are $3, 682, 140 as shown below: BAY POINT REDEVELOPMENT PROJECT AREA 10/25/94 SOURCES & USES ------------USES---------------- ----------------------------------SOURCES------------------------------------- ******Tax Increments******* *******Bond Proceeds"""* Other Capital Funds Housing Funds Capital Funds Housing Funds Revenues TOTAL ------- -------- ----- ------------- ------------- --------- --------- Payments to Other Agencies *Fiscal Agreements $135,000 $135,000 *ERAF Payment $32,000 $32,000 Capital Projects *PRIDE Activities -PCS/WP Rd Sidewalk/Drainage $89,200 $89,200 -PC8/WP Rd Landscaping $98,360 $98,360 -Code Enforcement $17,500 $17,500 -Facade Rehabilitation Program $32,500 $32,500 -WP Rd. Banner Program $11,130 $11,130 *Willow Pass Rd. Improvements $579,300 $579,300 *Flood Control Impvts-Bailey Rd. area $45,000 $45,000 *Anuta Park $60,000 $60,000 *Unallocated Capital Funds $137,405 $137,405 Housing Projects *First Time Homebuyer Program $395,000 $395,000 *Alves Lane Housing $228,998 $171,102 $400,100 *Unallocated Housing Funds $297,078 $297,078 Debt Service *County Debt $0 *Bonded Indebtedness $171,600 $39,400 $211,000 Economic Development Activities *Commercial Enhancement $0 $0 *Land/Development Activities $98,530 $914,700 $1,013,230 (Canal Road & Willow Pass/Hwy 4) Planning Activities *Bailey Rd./BART Specific Plan $0 $0 Administration *Salaries $1,500 $1,500 *services & Supplies $125,899 $125,899 *Equipment $938 $938 TOTALS $1,240,560 a $507,580 b $1,539,000 $395,000 $0 $3,682,140 a: 1994-95 Tax Increment of $653,600; Carry-Over of $566,000; & Interest Earnings of $20,960. b: 1994-95 Tax Increment of $164,400; Carry-Over of $334,000; & Interest Earnings of $9,180. 9 B. PROJECT DESCRIPTION: BAY POINT 1 . Fiscal Agreements: Pass-thru payments to Taxing Agencies pursuant to approved Fiscal Agreements . 2 . ERAF (Education Revenue Augmentation Fund) Payment: Mandated contribution to the State of California to alleviate the States' budget crisis . 3 . Sidewalk/Drainage: Willow Pass Road and Port Chicago Highway: These improvements include constructing sidewalks, and installing a collect and convey system for landscaping and median strips. 4 . Landscaping Willow Pass Road and Port Chicago Highway: Project involves installing landscaping and median islands in the "Gateway" area, from the intersection of Willow Pass Road and Port Chicago Highway. 5. Targeted Code Enforcement: A combined effort between the Redevelopment Agency and the Building Inspection Department to alleviate health and safety hazards north of Willow Pass Road in the North Broadway/Solano/Poinsettia Avenue area in Bay Point. It is the intent of the program to prioritize abatement proceedings with subsequent property acquisition and redevelopment of the properties . 6. Facade Rehabilitation Program: Financial assistance program to improve the exterior physical appearance of commercial properties in Bay Point. A revolving loan fund is to be paired with County Community Development Block Grant (CDBG) funds and a match from the property owner or business tenant. 7 . Willow Pass Banner Program: Design and install 28 banners on the north and south sides of Willow Pass Road from Port Chicago Highway to Bailey Road. The banners were designed by students at the Riverview Middle School . 8 . Willow Pass Road Improvements : Project to include widening and repaving Willow Pass Road, establishing a bicycle lane, installing curb, gutters and sidewalks from Bailey Road to Bay View Avenue. 9. Flood Control Improvements : The addition of improved pipe is to be made west and east of Bailey Road, and extend from the Atchison Topeka & Santa Fe Railroad tracks to State Route 4 . The project will be an incentive to residential and commercial development. 10. Anuta Park: Project is the purchase and installation of play equipment. 11 . Unallocated Capital Funds : Capital Project funds reserved for future designation. 12 . First Time Homebuyer Program: A program of permanent financing for second mortgages to assist low and moderate income households achieve home ownership. 13 . Alves Lane Housing: Construction of 14 rental units affordable to low and moderate income households . The project is located at Alves Lane and Water Street. 14 . Unallocated Housing Funds : Housing funds reserved for future designation. 15. Economic Development Activities: Acquisition of three parcels east of the Cheaper! store on Bailey Road, just north of the new realignment of Canal Road; and acquisition of a parcel of land created from the realignment of State Route 4 and Willow Pass Road. 10 16. Bailey Road/BART Specific Plan: Development of a Specific Plan for the area surrounding the Bailey Road interchange and the Bay Point BART Station. Program will be a joint planning effort of County, City of Pittsburg, and BART. Previously programmed funds - $50, 000 - are being rolled to Fiscal Year 1995-96, when this project is expected to be constructed. 17 . Administration: Salaries, services, supplies, and equipment in support of project implementation. 11 C. INDEBTEDNESS The Agency has incurred approximately $5.46 million in debt as of June 30, 1994, including: • $2 . 54 million in Tax Allocation Bonds issued in June, 1992 . • $2 . 6 million contractual obligation with the County for infrastructure improvements . • $32, 000 to the State of California pursuant to budget bill. 12 IV. OAKLEY REDEVELOPMENT PROJECT AREA A. REVENUES/EXPENDITURES Total 1994-95 total revenues and budgeted expenditures are $4, 719, 120 as shown below: OAKLEY REDEVELOPMENT PROJECT AREA 10/26/94 SOURCES & USES ------------USES---------------- ----------------------------------SOURCES------------------------------------- ******Tax Increments******* *******Bond PrOCeeds******* Other Capital Sands Housing Funds -Capital Funds Housing Funds Revenues TOTAL ------------- ------------- ------------- ------------- --------- --------- Payments to Other Agencies *Fiscal Agreements $209,000 $209,000 *BRAF Payment $9,000 $9,000 Capital Projects *Road Impvts-Empire to Vintage $189,790 $189,790 *Park Improvements $50,000 $50,000 *Park Acquisition $200,000 $200,000 *EBRPD Trails Project $150,000 $150,000 *Signal--Hwy 4 & Malicote $50,000 $50,000 *Oakley Rd/Empire Landscaping $25,000 $25,000 *Hwy 4 @ Big Break & Empire $280,600 $280,600 *Library $250,000 $250,000 *Oakley Fire Hydrant Upgrade $75,000 $75,000 *Sand Hill Infrastructure $565,600 $163,400 $729,000 *Unallocated Capital Funds $3,283 $3,283 Housing Projects *First Time Homebuyer Program $273,000 $273,000 *golden Oak Senior Manor $576,300 $576,300 Debt Service *Bonded Indebtedness $201,800 $46,200 $248,000 Economic Development Activities $0 *Downtown Improvements $105,116 $1,132,000 $1,237,116 *Downtown Specific Plan $35,900 $35,900 Administration *Salaries .. $1,500 $1,500 *Services & Supplies $125,693 $125,693 *Equipment $938 $938 TOTALS $1,722,620 a $622,500 b $2,101,000 $273,000 $0 $4,719,120 a: 1994-95 Tax Increment of $911,800; Carry-Wer of $781,000; & Interest Earnings of $29,820. b: 1994-95 Tax Increment of $228,200; Carry-Wer of 383,000; & Interest Earnings of $11,300. 13 B. PROJECT DESCRIPTION: OAKLEY 1 . Fiscal Agreements: Pass-thru payments to Taxing Agencies pursuant to approved Fiscal Agreements . 2 . ERAF (Educational Revenue Augmentation Fund) Payment: Mandated contribution to the State of California to alleviate the State' s budget crisis . 3. Road Improvements - Empire to Vintage Avenue: Along State Route 4, these improvements include landscaping, landscape irrigation facilities, median islands and sidewalk. 4 . Park Improvements : Funds to implement an Oakley Parks Master Plan. 5. Park Acquisition: Funds to implement an Oakley Parks Master Plan. 6. East Bay Regional Parks District (EBRPD) Trails Project: Assistance to the East Bay Regional Parks District for the construction of a portion of the Delta De Anza Trail. This portion is to be at the intersection of Cypress Avenue and State Route 4 . 7 . Signal - Highway 4 and Malicoat Avenue: A traffic signal is to be constructed at the intersection of Malicoat and State Route 4 . The signal is in response to the anticipated additional traffic as the result of a proposed subdivision east of Malicoat Avenue. The developer, Redevelopment Agency and Public Works Department will share the cost of the signal . 8 . Oakley Road/Empire Landscaping: Relandscaping of the median island on Empire Avenue, between State Route 4 and Oakley Road. 9. Highway 4 at Big Break: Improvements to State Route 4 at Big Break Road and Empire Avenue. 10. Library: Upgrade of library facilities is desired by the community. Monies reserved for this project may be used as seed money to find additional funding sources for an enhanced library. 11 . Fire hydrants: These hydrants are to replace existing hydrants and install new fire suppression equipment in downtown Oakley. 12 . Improvements to the Sand Hill Infrastructure: These improvements include the paving of streets, and the creation of curb, gutter and sidewalks as well as drainage and sewer system facilities in an older neighborhood. Agency funds will be used in conjunction with developer funding. 13 . First Time Homebuyer Program: A program of second mortgages to assist low and moderate income households achieve homeownership. 14 . Golden Oak Senior Manor: Financing for the construction and permanent loan for a 50 unit development for low and moderate income senior citizens . Agency funds are being used with Low Income Housing Tax Credits, CDBG, and County HOME funds . 15. Downtown Improvements: Funds dedicated for implementation of Old Town Oakley Specific Plan upon its adoption. 16. The Downtown Specific Plan: Completion of a Specific Plan for downtown Oakley. 14 C. INDEBTEDNESS The Agency has incurred approximately $3 .43 million in debt as of June 30, 1994 which include: • $2 . 98 million in Tax Allocation Bonds issued in June, 1992 . • $9, 000 to the State of California pursuant to budget bill. • $280, 000 in contractual obligations to the County for infrastructure improvements . • $150, 000 in contractual obligations to the East Bay Regional Park District. • $100, 000 in contractual obligation to the Contra Costa Mosquito Abatement District. 15 V. RODEO REDEVELOPMENT PROJECT AREA A. REVENUES/EXPENDITURES Total FY 1994-95 revenues and budgeted expenditures are $782, 340 as shown below: RODEO REDEVELOPMENT PROJECT AREA 11/7/94 SOURCES & USES ------------USES---------------- ----------------------------------SOURCES------------------------------------- ******Tax Increments******* *******Bond Proceeds******* Other Capital Funds Housing'Funds Capital Funds Housing Funds Revenues TOTAL ------------- ------------- ------------- ------------- --------- --------- Payments to Other Agencies *Fiscal Agreements $60,000 $60,000 *ERAF Payment $0 $0 Capital Projects *San Pablo/Willow Entranceway $78,500 $78,500 *Fire Station Renovation $194,223 $194,223 *Unallocated Capital Funds $0 $0 Housing Projects *Unallocated Housing Funds $235,620 $235,620 Debt Service *County Debt $0 $0 *Bonded Indebtedness $0 $0 Economic Development Activities *Downtown Facade Rehabilitation $17,500 $17,500 *Downtown Specific Plan $17,000 $17,000 *Downtown Specific Plan EIR $75,000 $75,000 Administration *Salaries $1,000 $1,000 *Services & Supplies $102,872 $102,872 *Equipment $625 $625 TOTALS $546,720 a $235,620 b $0 $0 $0 $782,340 a: 1994-95 Tax Increment of 294,000; Carry-Over of $242,000; & Interest Earnings of $10,720. b: 1994-95 Tax Increment of $73,000; Carry-Over of $158,000; & Interest Earnings of $4,620. 16 I B. PROJECT DESCRIPTION: RODEO 1 . Fiscal Agreements : Pass-thru to Taxing Agencies pursuant to approved Fiscal Agreements . 2 . ERAF (Educational Revenue Augmentation Fund) Payment: Mandated contribution to the State of California to alleviate the State' s budget crisis . 3 . San Pablo/Willow Entranceway: Development of landscaped feature at key community gateway. 4 . Fire Station Renovation: Loan of Redevelopment Agency funds to seismically upgrade the Rodeo Fire Station. Two year commitment totals $276, 000 . 5. Unallocated Capital Funds : Capital funds reserved for future designation. 6. Unallocated Housing Funds: Housing funds reserved for future designation. Sub-committee is evaluating alternative. 7 . County Debt: None. 8 . Bonded Indebtedness : None. 9. Downtown Facade Rehabilitation: Financial assistance to downtown businesses for facade improvements . 10 . Downtown Specific Plan: Payment of consultant for completion of Downtown/Waterfront Specific Plan. 11 . Downtown Specific Plan EIR: Reserve for EIR, if necessary, in support of Specific Plan. 12 . Administration: Salaries, services, supplies, and equipment in support of project implementation. 17 C. INDEBTEDNESS The Agency has incurred approximately $500, 000 as of June 30, 1994, including: $500, 000 in contractual obligation for EBRPD improvements. 18 WORK PROGRAM FOR FISCAL YEAR 1994-95 The work program of the Contra Costa County Redevelopment Agency for Fiscal Year 1994-95 is directed at continuing the implementation of the Pleasant Hill BART Station Area Redevelopment Plan and Specific Plan, and the Redevelopment Plans for North Richmond, Bay Point, Oakley and Rodeo. Specific goals, objectives and tasks of the Agency for Fiscal Year 93-94 are outlined below: I . Pleasant Hill BART Station Redevelopment Project Area: Goal 1 : Secure necessary financing to implement the Plan. A. Secure funds from developers under terms of Disposition and Development Agreements (DDA' s) . B. Facilitate property transfers as appropriate to expedite project/program implementation. C. Continue to collect reimbursements from developers as called for in DDA' s and from utility companies as called for in undergrounding agreements . D. Continue repayment of Agency debt to the County, as financially feasible. E. Continually evaluate the Agency' s outstanding bonded indebtedness for cost saving opportunities . Goal 2 : Complete the Assemblage of Specific Plan Development Areas. A. Issue a Request for Proposal for the Area 4 development site. B. Complete vacation and abandonment proceedings on County rights-of-way held in fee and easement. C. Secure property dedications as necessary for planned road improvements . Goal 3: Continue access and infrastructure improvements necessary to allow construction to begin and to serve completed buildings. A. Continue to transfer property as necessary to facilitate road and public improvements. B. Secure property dedications as specified in DDA' s or development approvals . C. Initiate condemnation action where necessary. D. Evaluate need for new rights-of-way and, if necessary, acquire either through dedication or .condemnation. E. Establishment of Iron Horse Trail along the former Southern Pacific right-of-way. F. Provide for interim use of Agency property to further facilitate transit of utilization during the construction of regional traffic improvements . G. Provide improvements to local streets to enhance appearance and safety. 19 Goal 4 : Continue to evaluate Specific Plan Implementation. A. Continue to development Transportation Demand Management (TDM) Program, in conjunction with the County TDM Coordinator. 1 . Coordinate with Contra Costa Centre Association for program development. 2 . Coordinate the implementation of TDM with the completion and occupancy of building. 3 . Explore and evaluate new TDM measures . B. Develop and initiate, with the Contra Costa Centre Association, a Child Care Affordability Program. C. Begin traffic studies for area benefiting circulation improvements. D. Initiate studies regarding changes in the Land Use Element of the Pleasant Hill BART Station Area Specific Plan. Goal 5: Facilitate the Development of Affordable Housing. A. Provide financial assistance, as provided for in DDA's, to facilitate the delivery of affordable housing in the Park Regency project. B. Initiate a competitive developer selection process for the development of Area 4 . II . North Richmond Redevelopment Project Area Goal 1 : Implementation of the North Richmond Redevelopment Plan. A. Monitor and provide support for private development within the Project Area. B. Continue to work with the North Richmond Municipal Advisory Council (MAC) in implementing the Plan. C. Work with the County Administrator and the City of Richmond staff in implementing the COMET Program, a comprehensive County/City Neighborhood Improvement program. D. Work with the County Administrator and other County department staff in implementing the North Richmond Integrated Management Plan, a comprehensive County Neighborhood Improvement program. E. Work with County Public Works staff in implementing a North Richmond Area of Benefit to include Project Area road improvements and potential funding sources. F. Work with Rubicon and County organizations to develop and initiate an employment training and information dissemination system. G. Complete a rezoning program to eliminate General Plan/zoning inconsistencies, and continue to work with the MAC in improving the program. 20 Goal 2 : Monitor related public improvements in the Project Area. A. Continue to support the Richmond Parkway (Route 93) and the work of the Route 93 committee. B. Monitor progress of removing areas in North Richmond from FEMA designated Flood Zones . Goal 3: Commence infrastructure improvements necessary to allow construction to begin and to serve existing structures. A. Work with County Public Works staff in completing the design and subsequent implementation of the Brookside Drive realignment project. B. Complete environmental analysis where necessary. C. Initiate property acquisition and disposition where required to facilitate public improvements. Goal 4 : Facilitate the development of affordable housing. A. Continue to work with appropriate private, public, and non-profit organizations and, when feasible, actively participate in the development of affordable housing. B. Facilitate affordable home ownership opportunities through the initiation of the Parkway Estates Project. C. Facilitate the development of an affordable housing senior housing project by the Community Housing Development Corporation of North Richmond and Eden Housing. D. Support the continued development of Community Housing Development Corporation of North Richmond by providing capacity building financial assistance. III . Bay Point Redevelopment Project Area Goal 1 : Implementation of the Bay Point Redevelopment Plan. A. Continue to work with the Project Area Committee in implementing the Plan. B. Monitor and provide support for private development within the Project Area. C. Participate in the funding of improvements to Willow Pass Road/Port Chicago Highway intersection. D. Facilitate and participate in providing improvements along Willow Pass Road Corridor. E. Facilitate and participate in the construction of flood control improvements . F. Work with the County Administrator, the Bay Point . PRIDE Committee, and the PAC in establishing and funding a neighborhood improvement program. G. Work with appropriate non-profit and for-profit organizations in developing affordable housing, and actively participating in development activities where able. H. Undertake a commercial enhancement program, including 21 marketing and directed Agency assistance to a non-profit economic development corporation, a facade rehabilitation program, and a Willow Pass Road Banner program. J I . Complete a First Time Homebuyers Program to facilitate affordable home ownership. J. Initiate a Specific Plan for the Bay Point BART Station Area. K. Manage other activities necessary to implement Bay Point Redevelopment Bond Issue programs. L. Initiate land acquisition activities to facilitate future economic development of the community. IV. Oakley Redevelopment Project Area Goal 1 : Implementation of the Oakley Redevelopment Plan. A. Monitor and provide support as appropriate for private development within the Project Area. B. Work with County Public Works Staff in implementing the East County Area of Benefit and identifying road improvements that would likely promote development. C. Assist in the funding of Highway 4 widening from Empire to Vintage. D. Facilitate the development of the Golden Oak Senior Manor by Ecumenical Association for Housing through the provision of financial assistance. E. Work with appropriate private, public and non-profit organizations, as well as County Community Development staff in developing affordable housing, and actively participating in development activities where able. F. Complete a First Time Homebuyers Program to facilitate affordable home ownership. G. Work with the Advanced Planning staff, Public Works and the Oakley Municipal Advisory Council to complete a Specific Plan for downtown Oakley. H. Work with community park and library interests , to determine an appropriate program of expenditures that will improve the quality of such services to the Oakley community. I . Development with local water and fire agencies an improvement program that will enhance fire suppression capabilities in the Project Area. J. Initiate a major program of street, drainage and sewer improvements in the Sand Hill area. K. Manage other activities necessary to implement Oakley Redevelopment Bond Issue programs . V. Rodeo Redevelopment Project Area Goal 1 : Implementation of the Rodeo Redevelopment Plan. A. Monitor and provide support as appropriate for private development within the Project Area. 22 B. Work with the County Public Works staff in implementing the West County Area of Benefit and in identifying other sources of funding for road improvements that would promote the revitalization of Rodeo. C. Work with County Service Area R-10 and the East Bay Regional Park District to develop and begin park and recreation plans and programs . D. Complete a Specific Plan for the downtown and waterfront areas . E. Initiate a facade rehabilitation program in the downtown area. F. Undertake Willow Avenue/San Pablo Avenue entranceway improvements . G. Assist in the seismic upgrading of the Rodeo Fire Station. Goal 2 : Monitor related activities in the Project Area. A. Continue active participate with the East Bay Regional Park District/Contra Costa County Joint Powers Authority West County Shoreline and Rodeo Waterfront program. B. Review development proposals in adjacent jurisdictions for compatibility with Rodeo interests . Goal 3 : Facilitate the development of affordable housing. A. Work with appropriate private, public and non-profit organizations to identify appropriate housing opportunities. 23 EXAMINATION OF ACHIEVEMENTS FOR FISCAL YEAR 1993-94 The Redevelopment Agency during Fiscal Year 1993-94, continued to implement its Redevelopment Plans. . I . Pleasant Hill BART Redevelopment Project Area A. The Agency completed the assemblage of privately-owned properties in Area 4 . B. Property Acquisition - Private Assemblages : The acquisition of property necessary to create developable areas for the commercial uses has been completed. Minor assemblage activity of one of the two residential projects was completed. C. Infrastructure Improvements : Preliminary engineering to set the basis for future EIR and project scoping was initiated for circulation improvements in the area. Planning and design work for the first element of a park/open space corridor was initiated. II . North Richmond Redevelopment Project Area A. Development: Agency staff continues to work with private developers interested in industrial development north of Wildcat Creek. A 7-unit infill housing project was completed and units sold. Agency staff worked with several private and non-profit developers in facilitating infill housing on scattered sites, and a major subdivision near the Richmond Parkway. Initial activity leading toward establishment of a senior housing project occurred. B. Infrastructure: The Agency continued to work with the City of Richmond on the Richmond Parkway (Route 93) . The design, alignment and environmental assessment of Sections 4, 5 and 6, which will connect the North Richmond industrial area to I-80, is on-going. The Agency has committed funds towards the Brookside Drive realignment project, and initiated preliminary engineering and environmental studies. The Agency committed future funds to facilitate completion of the final phase of North Richmond flood control improvements . C. General : The Agency continues its involvement in the COMET Program, a joint County-City neighborhood improvement program. The Agency has played an active role in the creation of the North Richmond Integrated Management Plan, a comprehensive County neighborhood revitalization program. A rezoning program for the employment area of North Richmond was initiated. The Agency initiated a focused code enforcement program that is linked to subsequent property improvements . D. Economic Development: A grant from the Private Industry Council to provide an innovative employment training program for area residents was secured by Rubicon with Agency assistance. The Agency assisted in financing the job linkage program. III . Bay Point Redevelopment Project Area A. Development: Agency staff continues to work with non-profit and private developers interested in affordable housing development throughout the Project Area. The Alves Lane housing project was prepared to start construction as the fiscal year ended. The Agency completed the acquisition of the former Anchor Cove property as part of a construction loan agreement . Staff also continues to work with private developers interested in commercial or industrial development along Willow Pass Road and the industrial area north of Willow Pass Road. Development of a First Time Homebuyer Program was initiated. 24 B. Infrastructure. The Agency provided funding for street improvements along Willow Pass Road, west of Bailey, and initiated design of landscaping improvements at the Port Chicago Highway/Willow Pass Road intersection. C. Economic Development: Preparation of a marketing brochure for Bay Point was initiated. Initiated discussions relative to future property acquisitions for economic development purposes . D. General: Agency staff has provided technical assistance to the Bay Point PAC and the PRIDE Committee to institute a neighborhood improvement program. A focused code enforcement program that is linked to subsequent property improvements was initiated. IV. Oakley A. Development: Development of a First Time Homebuyer Program was initiated. Commitment of financing to a senior housing project - Golden Oak Senior-,--Manor - was provided to permit the project to successfully pursue federal tax credits for construction funds. Agency staff continues to work with non-profit and private . developers interested in residential and commercial development within the project area to implement the Agency' s affordable housing obligation. B. Infrastructure: The Agency provided funding to widen a portion of the Highway 4, and provide for frontage improvements . C. General: Agency staff completed a circulation draft of a downtown Specific Plan process. Agency staff worked with the Oakley Municipal Advisory Council, the County Public Works Department, the County Advanced Planning staff, and the Oakley Chamber of Commerce to prepare a Specific Plan for downtown Oakley. V. Rodeo A. Development: The Agency continued in the development of a downtown/waterfront Specific Plan process . Agency staff continues to work with private developers interested in residential, mixed- use, and commercial development in the Project Area. A sub- committee of the Rodeo Redevelopment Advisory Committee was established to begin the process of evaluating affordable housing alternatives and priorities . B. Infrastructure: The Agency completed the design of San Pablo/Willow/Parker Avenue landscaping improvements for construction in FY 1994-95. B. General : The Agency has been actively involved in the on-going Rodeo Waterfront Study of the EBRPD, the County and the Coastal Conservancy. sra16/1h/budget.rpt 25