Loading...
HomeMy WebLinkAboutMINUTES - 10191993 - 1.24 0 _ TO: BOARD OF SUPERVISORS FROM: J. MICHAEL WALFORD, PUBLIC WORKS DIRECTOR DATE: October 19, 1993 SUBJECT: Approve Contract Change Order No. 3 to AIP 3-06-0050-07 for Tracor Applied Sciences, Inc. for Airport Noise Monitoring System, Phase II at Buchanan Field Airport, Concord Area SPECIFIC REQUEST(S) OR RECOMMENDATION(S) &BACKGROUND AND JUSTIFICATION I. Recommended Action: APPROVE contract Change Order No.3 for Tracor Applied Sciences, Inc. and Auth6rize the Public Works Director or his designee to sign the contract Change Order. This change order relates to Noise Monitoring Site No. 1 on the golf course which required some 600 feet of additional trenching and conduit and related installation work beyond the contract requirement of 100 feet for such work at Noise Monitoring sites. II. Financial Impact This Change Order requires an adjustment of $13,483 which consists of the subcontractor;'s work in the amount of$11,402 plus Tracor's loading of 18.25 percent. 90% of the project will be funded by the Federal. Aviation Administration. The local 10% share will be paid out of the Airport Enterprise Fund. III. Reasons for Recommendations and Background: The demonstration and acceptance test for the airport Noise Monitoring System (NMS) was completed on July 2, 1993, without NMS site #1 operation. At the time of installation, access to NMS #1 was not possible due to golf course construction. This site required some 600 feet of additional trenching, conduit and related installation work beyond the contract requirement of 100 feet of work at the NMS site. NMS #1 was fully operational and accepted as of September 30, 1993. Continued on Attachment: SIGNATURE: 19argmegs=—109!f —RECOMMENDATION OF COUNTY ADMINISTRATOR RECOMMENDATION OF-BOr COMMITTEE APPROVE _OTHER SIGNATURE(S): ACTION OF BOARD ON q f 3 APPROVED AS RECOMMENDED�_OTHER VOTE OF SUPERVISORS UNANIMOUS (ABSENT ) AYES: NOES: ABSENT: ABSTAIN: i ii reby certify that this is a true and correct copy of an action taken and entered on the minutes of the JMW:TW:rs Board of Superviso�on the date shown. c:19.t 10 ATTESTED: !' �' u /z l 9 -3 — PHIL BATCHELOR,Clerk of the Board Orig Div: Airport - Contact T. Williams (510) 646-5722 of Supervisor;and County Administrator cc: County Administrator Public Works Director Sj - -- ,Deputy Public Works Accounting Auditor/Controller Aviation Advisory Committee (Via Wiv6r) Federal Aviation Administration iv,a Tracor Applied Sciences (vii TRACOR Tracor Applied Sciences, Inc. 6500 Tracor Lane Austin,TX 78725-2050 512 926-2800 September 23, 1993 HCM-93-070 Tracy Williams, Assistant Manager Contra Costa County Airports 510 Sally Ride Drive Concord, CA 94520-5550 Subject: Proposed Change Order No. 3 to AIP Project 3-06-0050-07 Airport Noise Monitoring System P4A',C- IT- Dear Ms. Williams: As you know, NMS Site 1 on the Golf Course required some 600 feet of additional trenching and conduit and related installation work beyond the contract requirement of 100 feet for such work at NMS sites. The price for the additional work is $13,483 which consists of the subcontractor's work in the amount of $11,402 (per his invoice attached) plus Tracor's loading of 18.25 percent. If you concur in the above, please indicate County approval in the space provided below and return an original to me for our files. Sincerely yours, TRACOR APPLIED SCIENCES, INC. CONTRA COSTA COUNTY By: CJ . By: Harold C. Malloy J. Michael Walford Contracts Department Public Works Director