SUBJECT: FY 1993/94 Redevelopment Agency Budget
SPECIFIC REQUEST(S) OR RECOMMENDATIONS (S) & BACKGROUND AND JUSTIFICATION
RECOMMENDATIONS
ADOPT the attached annual Redevelopment Agency budget for fiscal year
1993-94 in compliance with California Community Redevelopment Law.
FISCAL IMPACT
This budget provides for no General Fund subvention of the Agency (see
below) .
BACKGROUND/REASONS FOR RECOMMENDATIONS
California Community Redevelopment Law (Health & Safety Code Section
33606) requires in part that the Redevelopment Agency adopt an annual
budget containing specific information. The attached report fulfills
the requirements of Redevelopment Law and establishes a framework for
implementation of the Contra Costa County Redevelopment Agency budget
for fiscal year 1993-94 . This budget has been reviewed by local
Project Area Committees.
CONTINUED ON ATTACHMENT: YES SIGNATURE: �/ r
RECOMMENDATION OF EXECUTIVE DIRECTOR RECOMMENDVON ON OF AhZENCY CO TTER
APPROVE OTHER
SIGNATURE(S) :
ACTION OF AGENCY ON October 5 , 1993 APPROVED AS RECOMMENDED x OTHER
VOTE OF COMMISSIONERS
I HEREBY CERTIFY THAT THIS IS A
UNANIMOUS (ABSENT ) TRUE AND CORRECT COPY OF AN
AYES: NOES: ACTION TAKEN AND ENTERED ON THE
ABSENT: ABSTAIN: MINUTES OF THE REDEVELOPMENT
AGENCY ON THE DATE SHOWN.
Contact: Jim Kennedy
646-4076
cc: Community Development
Redevelopment Agency
County Counsel
County Administrator ATTESTED October 5 , 1993
Auditor-Controller PHIL BATCHELOR,
SRA11/budgetl.bos AGENCY SECRETARY
BY d , DEPUTY
HIGHLIGHTS
• To comply with the 1993-94 State budget, $137, 000 in Agency
revenue must be redirected to the State for redistribution to
the schools;
• To assist the County in dealing with its fiscal constraints
the Agency will pay off its remaining loan balance to the
County General Fund (Pleasant Hill BART Station Area;
• Initiation of a First Time Homebuyer Mortgage Assistance
Program in three project areas - Oakley, Bay Point, and North
Richmond;
• Economic Development activities, including facade rehab-
ilitation, property acquisition/development, and downtown
plans, totaling over $900, 000 in four project areas - North
Richmond, Bay Point, Oakley, and Rodeo;
• Major infrastructure improvements including:
1. Southern Pacific arterial preliminary engineering and
environmental documentation - Pleasant Hill BART;
2 . Brookside Drive realignment - North Richmond;
3 . Willow Pass Road improvements - Bay Point;
4. Flood control improvements - Bay Point;
5. Highway 4 improvements - Oakley;
6. Park improvements - Oakley;
7 . Gateway improvements - Rodeo.
• Major housing development financial assistance, including:
1. Area 4 residential site assemblage - Pleasant Hill BART;
2 . Parkway Estates - North Richmond";
3 . Alves Lane Housing Reconstruction - Bay Point;
4 . Golden Oak Senior Manor - Oakley.
CONTRA COSTA COUNTY REDEVELOPMENT AGENCY
BUDGET AND WORK PROGRAM FOR
FISCAL YEAR 1993-94
INTRODUCTION
California Community Redevelopment Law (Health & Safety Code
Section 33606) requires the Redevelopment Agency to adopt an annual
budget containing the following:
Proposed expenditures of the Agency;
Proposed indebtedness to be incurred by the Agency;
A work program for the coming year, including goals; and
An examination of the previous year's achievements.
I. PLEASANT HILL BART STATION AREA
A. REVENUES/REVENUES
Total FY 1993-94 revenues and budget expenditures are $13 ,496, 172 as
shown:
SOURCES AND USES
USES SOURCES
------------Tax Increments--------- ----------Bond Proceeds------------
Specific
Capital Funds Housinq Funds Capital Funds Housinq Funds Plan Fees Total
Payments to Other Agencies
- Fiscal Agreements $126,000 $126,000
-,ERAF Payment $100,000 $100,000
Capitol Projects
Bancroft Extension
- Prelim Eng & EIR $100,000 $100,000
- Construction Fund $6,032,000 $4,243,352 $10,275,352
Iron Horse Trail $148,000 $148,000
Del Hombre Repair $50,000 $50,000
Property Expenses
Area 4 Assembly $400,000 $400,000
Taxes/Misc $35,000 $35,000
Area 4 Housing Consultant $25,128 $25,128
Park Regency Financial Assistance $3,300 $596,700 $600,000
Debt Service
County Debt $440,000 $440,000
Bonded Indebtedness $993,000 $993,000
Administration
Salaries $5,000 $5,000
Services & Supplies $193,692 $193,692
Equipment $5,000 $5,000
TOTALS $2,376,120(a) $596,700(b) $6,032,000 $0 $4,491,352 $13,496,172
a: 1993-94 Tax Increment of $2,036,000; Carry-over of $313,000; and Interest Earnings of $27,120.
b: 1993-94 Tax Increment of $509,000; Carry-over of $76,000; and Interest Earnings of $11,700.
B. INDEBTEDNESS
As of .June 30, 1993, the Agency has approximately $27 . 84 million
in debt. The major elements of Agency debt for the Pleasant Hill
BART Station Area are:
• $22 . 68 million Tax Allocation Bonds issued in June, 1992 .
• $426, 000 due to County General Fund for property advances and
cash to the Agency.
• $1. 32 million due to Pleasant Hill BART TSM fund for an
advance .from transit fees.
• $2 . 1 million due to the County Affordable Housing Trust Fund
for property acquisition (Area 4) .
• $1. 20 million due Glendale Federal Savings for property
acquisition (Area 4) .
• $98, 000 due to State of California pursuant to the . State
budget bill.
II. NORTH RICHMOND RDEVELOPMENT PROJECT AREA
A. REVENUES/EXPENSES
Total 1993-94 revenues and budgeted expenditures are $1, 317, 060 as
shown below:
SOURCES AND USES
USES SOURCES
------------Tax Increments--------- ----------Bond Proceeds------------
Capital Funds Housing Funds Capital Funds Housing Funds Total
Payments to Other Agencies
- Fiscal Agreements $0 $0
- ERAF Payment $3,000 $3,000
Capitol Projects
- Brookside Drive Realignment $680,000 $680,000
- Set-aside for Capital Projects-
Unallocated $16,730 $16,730
Community Improvement Programs
- COMET Activities $15,000 $15,000
- OPEN Jobs Program $10,000 $10,000
Housing Projects
- Infill Housing $19,621 $19,621
- Parkway Estates II $150,000 $90,000 $240,000
- Set-aside for Housing Projects-
Unallocated $33,419 $33,419
- Mortgage Assistance Program � $109,000 $109,000
Debt Service
- Bonded Indebtedness $62,000 $16,000 $78,000
Administration
- Salaries $1,000 $1,000
- Services & Supplies $110,290 $110,290
- Equipment $1,000 $1,000
TOTALS $369,020(a) $69,040(b) $680,000 $199,000 $1,317,060
a: 1993-94 Tax Increment of $218,000; Carry-over of $145,000; and Interest Earnings of $6,020.
b: 1993-94 Tax Increment of $55,000; Carry-over of $13,000; and Interest Earnings of $1,040.
B. INDEBTEDNESS
The Agency has incurred approximately $1.44 million in debt as of
June 30, 1993 . The major elements include:
• $1. 13 million Tax Allocation Bonds issued in June, 1992;
•
$310, 000 to the County for advances from the County Affordable
Housing Trust Fund;
• $3, 000 due to the State of California pursuant to SB 617
budget bill.
III. BAY POINT REDEVELOPMENT PEOJECT AREA
A. REVENUES/EXPENSES
.Total 1993-94 revenues and budgeted expenditures are $3, 600,520 as
shown below:
SOURCES AND USES
USES SOURCES
------------Tax Increments--------- ----------Bond Proceeds------------
Capital Funds Housing Funds Capital Funds Housing Funds Total
Payments to Other Agencies
- Fiscal Agreements $131,000 $131,000
- ERAF Payment $23,000 $23,000
Capitol Projects
PRIDE Activities
- PCH/WP Rd. Sidewalk/Drainage $89,200 $89,200
- PCH/WP Rd. Landscaping $100,000 $100,000
- Code Enforcement $17,500 $17,500
- Facade Rehabilitation Program $32,500 $32,500
- WP Rd. Banner Program $20,000 $20,000
Willow Pass Rd. Improvements $862,577 $862,577
Flood Control Improvements . $175,000 $175,000
Set-aside for Capital Projects-
Unallocated $100,668 $220,423 $321,091
Housing Projects
- First Time Homebuyer Program $467,000 $467,000
- Alves Lane Housing $228,998 $149,940 $378,938
Debt Service
- Bonded Indebtedness $141,000 $35,000 $176,000
Economic Development Activities
- Commercial Enhancement $98,530 $98,530
- Non-Profit Land/Development Activities $500,000 $500,000
Planning Activities
- Bailey Rd./BART Specific Plan $50,000 $50,000
Administration
- Salaries $1,500 $1,500
- Services & Supplies $155,184 $155,184
- Equipment $1,500 $1,500
TOTALS $1,190,580(a) $184,940(b) $1,758,000 $467,000 $3,600,520
a: 1993-94 Tax Increment of $569,000; Carry-over of $601,000; and Interest Earnings of $20,580.
b: 1993-94 Tax Increment of $142,000; Carry-over of $40,000; and Interest Earnings of $2,940.
B. INDEBTEDNESS
The Agency has incurred approximately $4 . 1 million in debt as of
June 30, 1993 , including:
• $2 . 54 million in Tax Allocation Bonds issued in June, 1992.
• $1.5 million contractual obligation with the County for
infrastructure improvements.
• $23 , 000 to the State of California pursuant to budget bill.
IV. OAKLEY REDEVELOPMENT PROJECT AREA
A. REVENUES/EXPENDITURES
Total 1993-94 total revenues and budgeted expenditures are
$4, 258, 440 as shown below:
SOURCES AND USES
USES SOURCES
-------Tax Increments--------- ----------Bond Proceeds------------
Capital Funds Housing Funds Capital Funds Housing Funds Total
Payments to Other Agencies
- Fiscal Agreements $174,000 $174,000
- ERAF Payment $11,000 $11,000
Capitol Projects
- Road Improvements $189,790 $189,790
- Park Improvements $50,000 $50,000
- Park Acquisition $200,000 $200,000
- EBRPD Trails Project $150,000 $150,000
- Signal-Hwy 4 & Malicote $50,000 $50,000
- Oakley Rd./Empire Landscaping $17,600 $17,600
- Highway 4 Improvements $450,000 $450,000
- Library Renovation $250,000 $250,000
- Oakley Fire Hydrant Upgrade $75,000 $75,000
- Oakley Water Fire Hydrant Pgm. $10,000 $10,000
Housing Projects
- First Time Homebuyer Program $535,000 $535,000
- Golden Oak Senior Manor $347,448 $347,448
- Set-aside for Housing Projects-
Unallocated $86,052 $86,052
Debt Service
- Bonded Indebtedness $166,000 $41,000 $207,000
Economic Development Activities $0
- Downtown Improvements $105,116 .$1,132,000 $1,237,116
- Downtown Specific Plan $60,000 $60,000
Administration
- Salaries • $1,500 $1,500
- Services & Supplies $155,434 $155,434
- Equipment $1,500 $1,500
TOTALS $1,131,940(a) $474,500(b) $2,117,000 $535,000 $4,258,440
a: 1993-94 Tax,Increment of $777,000; Carry-over of $336,000; and Interest Earnings of $18,940.
b: 1993-94 Tax Increment of $194,000; Carry-over of $272,000; and Interest Earnings of $8,500
B. ' INDEBTEDNESS
The Agency has incurred approximately $3 . 52 million in debt as of
June 30, 1993 which include:
• $2 . 98 million in Tax Allocation Bonds issued in June, 1992 .
• $11, 000 to the State of California pursuant to budget bill.
• $280, 000 in contractual obligations to the County for
infrastructure improvements.
• $150, 000 in contractual obligations to the East Bay Regional
Park District.
• $100, 000 in contractual obligation to the Contra Costa
Mosquito Abatement District.
V. RODEO REDEVELOPMENT PROJECT AREA
A. REVENUES/EXPENDITURES
Total FY 1993-94 revenues and budgeted expenditures are $525, 300
as shown below:
SOURCES AND USES
USES SOURCES
-------Tax Increments--------- ----------Bond Proceeds------------
Capital Funds Housing Funds Capital Funds Housing Funds Total
Payments to Other Agencies
- Fiscal Agreements $65,000 $65,000
- ERAF Payment $0 $0
Capitol Projects
- San Pablo/Willow Entranceway $49,000 $49,000
- Set-aside for Capital Projects
Unallocated $7,408 $7,408
Housing Projects
Set-aside for Housing Projects-
Unallocated $151,980 $151,980
Debt Service
County Debt $25,850 $25,850
- Bonded Indebtedness $0 $0
Economic Development Activities $0
- Downtown Facade Rehabilitation $17,500 $17,500
- Downtown Specific Plan $30,000 $30,000
- Downtown Specific Plan EIR $75,000 $75,000
Administration
- Salaries $1,000 $1,000
- Services & Supplies $101,562 $101,562
- Equipment $1,000 $1,000
TOTALS $373,320(a) $151,980(b) $0 $0 $525,300
a: 1993-94 Tax Increment of $230,000; Carry-over of $136,000; and Interest Earnings of $7,320.
b: 1993-94 Tax Increment of $58,000; Carry-over of $91,000; and Interest Earnings of $2,980
B. INDEBTEDNESS
The Agency has incurred approximately $525, 000 as of June 30, 1993,
including:
• $25, 000 to the County's Housing Bond Trust Fund.
$500, 000 in contractual obligation for EBRPD improvements.
r
SRA 1 I AWbudgetl.bos
WORK PROGRAM FOR FISCAL YEAR 1993-94
The work program of the Contra Costa County Redevelopment Agency for Fiscal
Year 1993-94 is directed at continuing the implementation of the Pleasant
Hill BART Station Area Redevelopment Plan and Specific Plan, and the
Redevelopment Plans for North Richmond, Bay Point, Oakley and Rodeo.
Specific goals, objectives and tasks of the Agency for Fiscal Year 93-94 are
outlined below:
I. Pleasant Hill BART Station Redevelopment Project Area:
Goal 1: Secure necessary financing to implement the Plan.
A. Secure funds from developers under terms of Disposition
and Development Agreements (DDA's) .
B. Continue property transfers as appropriate to expedite
receipt of payments.
C. Continue to collect reimbursements from developers as
called for in DDA's and from utility companies as called
for in undergrounding agreements.
D. Continue, repayment of Agency debt to the County, as
financially feasible.
E. Continually evaluate the Agency's outstanding bonded
indebtedness for cost saving opportunities.
Goal 2 : Complete the Assemblage of Specific Plan Development Areas.
® A. Finalize amendments to Disposition and Development
Agreements (DDA's) for Development Areas 3 & 4.
B. Complete the acquisition of remaining parcels required to
complete development Area 4, and issue a Request for
Proposal for the development site.
C. Complete vacation and abandonment proceedings on County
rights-of-way held in fee and easement.
D. Secure property dedications as necessary for planned road
improvements.
Goal 3 : Continue access and infrastructure improvements necessary to
allow construction to begin and to serve completed buildings.
A. Continue to transfer property as necessary to facilitate
road and public improvements.
B. Secure property dedications as specified in DDA's or
development approvals.
C. Initiate condemnation action where necessary.
D. Evaluate need for new rights-of-way and, if necessary,
acquire either through dedication or condemnation.
E. Establishment of Iron Horse Trail along the former
Southern Pacific right-of-way.'
F. Provide for interior use of Agency property to further
facilitate transit of utilization during the construction
of regional traffic improvements.
G. Provide improvements to local streets to enhance
appearance and safety.
Goal 4: Continue to evaluate Specific Plan Implementation.
A. Continue to development Transportation Demand Management
(TDM) Program, in conjunction with the County TDM
Coordinator.
1. Coordinate with Contra Costa Centre Association for
program development.
2 . Coordinate the implementation of TDM with the
completion and occupancy of building.
3 . Explore and. evaluate new TDM measures.
B. Develop and initiate, with the Contra Costa Centre
Association, a Child Care Affordability Program.
C. Begin preliminary engineering and environmental
documentation for the Bancroft Extension.
Goal 5: Facilitate the Development of Affordable Housing:
A. Provide financial assistance, as provided for in DDA's,
to facilitate the delivery of affordable housing in the
Park Regency project, including working with the County
on tax-exempt multi-family financing.
B. Initiate a competitive developer selection process for
the development of Area 4 .
II. North Richmond Redevelopment Project Area
Goal 1: Implementation of the North Richmond Redevelopment Plan.
A. Monitor and provide support for private development
within the Project Area.
B. Continue to work with the Project Area Committee/
Municipal Advisory Committee in implementing the Plan.
C. Work with the County Administrator and the City of
Richmond staff in implementing the COMET Program, a
comprehensive County/City Neighborhood Improvement
program.
D. Work with the County Administrator and other County
department staff in implementing the North Richmond
Integrated Management Plan, a comprehensive County
Neighborhood Improvement program.
E. Work with County Public Works staff in establishing a
North Richmond Area of Benefit to include Project Area
road improvements and potential funding sources.
F. Work with Rubicon and County organizations to develop and
inititate an employment training and information
dissemination system.
G. Coordinate the rezoning of appropriate areas to eliminate
General Plan/zoning inconsistencies.
Goal 2 : Monitor related public improvements in the Project Area.
A. Continue to support the Richmond Parkway (Route 93) and
the work of the Route 93 committee.
B. Monitor progress of removing areas in North Richmond from
FEMA designated Flood Zones.
Goal 3 : Commence infrastructure improvements necessary to allow
construction to begin and to serve ecxisting structures.
A. Work with' County Public Works staff in completing the
design and subsequent implementation of the Brookside
Drive realignment project.
B. Complete environmental analysis where necessary.
C. Initiate property acquisition and disposition where
required to facilitate public improvements.
Goal 4 : Facilitate ,the development of affordable housing.
A. Continue to work with appropriate private, public, and
non-profit organizations and, when feasible, actively
participate in the development of affordable housing.
B. Undertake an evaluation of a First-Time Homebuyers
program to facilitate affordable home ownership
opportunities, and other housing initiatives/
opportunities.
C. Assist in the final marketing and sale of seven single
family homes developed with Agency assistance.
D. Facilitate the development of an affordable housing
subdivision (Parkway Estates) by the Community Housing
Development Corporation of North Richmond.
III. Bay Point Redevelopment Project Area
Goal 1: Implementation of the Bay Point Redevelopment Plan.
A. Continue to work with the. Project Area Committee in
implementing the Plan.
B. Monitor and provide support for private development
within the Project Area.
C. Participate in the funding of improvements to Willow Pass
Road/Port Chicago Highway intersection.
D. Facilitate and participate in providing improvements
along Willow Pass Road Corridor.
E. Facilitate and participate in the construction of flood
control improvements.
F. Work with the County Administrator, the Bay Point PRIDE
Committee, and the PAC in establishing and funding a .
neighborhood improvement program.
G. Work with appropriate non-profit and for-profit
organizations in developing affordable housing, and
actively participating in development activities where
able.
H. Undertake a commercial enhancement program, including
marketing and directed Agency assistance to a non-profit
economic development corporation, a facade rehabilitation
program, and a Willow Pass Road Banner program.
I. Undertake a First Time Homebuyers Program to facilitate '
affordable home ownership.
J. Facilitate and participate in a Specific Plan for the Bay
Point BART Station Area.
K. Work with the community and Contra Costa Water District
in developing a local program of water improvements,
including improvements to individual homes.
L. Manage other activities necessary to implement Bay Point
Redevelopment Bond Issue programs.
IV. Oakley Redevelopment Project Area
Goal 1: Implementation of the Oakley Redevelopment Plan..
A. Monitor and provide support as appropriate for private
development within the Project Area.
B. Work with County Public Works Staff in implementing the
East County Area of Benefit and identifying road
improvements that would likely promote development.
C. Assist in the funding of Highway 4 widening from Empire
to vintage.
D. Facilitate the development of the Golden Oak Senior Manor
by Ecumenical Association for Housing through the
provision of financial assistance.
E. Work with appropriate private, public and non-profit
organizations, as well as County Community Development
staff in developing affordable housing., and actively
participating in development activities where able.
F. Undertake a First Time Homebuyers Program to facilitate
affordable home ownership.
G. Work with the Advanced Planning staff, Public Works and
the Oakley Municipal Advisory Council to prepare and
implement a Specific Plan for downtown Oakley.
H. Work with community park and library interests to
determine an appropriate program of expenditures that
will improve the quality of such services to the Oakley
community.
I. Development with local water . and fire agencies an
improvement program that will enhance fire suppression
capabilities in the Project Area.
J. Manage other activities necessary to implement Oakley
. Redevelopment Bond Issue programs.
V. Rodeo Redevelopment Project Area
Goal 1: Implementation of the Rodeo Redevelopment Plan.
A. Monitor and provide support as appropriate for private
development within the Project Area.
B. Work with the County Public Works staff in implementing
the West County Area of Benefit and in identifying other
sources of funding for road improvements that would
promote the revitalization of Rodeo.
C. Work with County Service Area R-10 and the East Bay
Regional Park District to develop and begin park and
recreation plans and programs.
D. Complete a Specific Plan for the downtown and waterfront
areas.
E. Secure funding to undertake a facade rehabilitation
program in the downtown area.
F. Undertake Willow Avenue/San Pablo Avenue entranceway
improvements.
Goal 2 : Monitor related activities in the Project Area.
A. Continue active participate with the East Bay Regional
Park District/Contra Costa County Joint Powers Authority
West County Shoreline and Rodeo Waterfront program.
B. Review development proposals in adjacent jurisdictions
for compatibility with Rodeo interests.
7
Goal 3 Facilitate the development of affordable housing.
A. Work with appropriate private, public and non-profit.
organizations to identify appropriate housing
opportunities.
a
r
EXAMINATION OF ACHIEVEMENTS FOR
FISCAL YEAR 1992-93 '
The Redevelopment Agency during Fiscal Year 19.92-93 , continued to implement
its Redevelopment Plans.
I. Pleasant Hill BART Redevelopment Project Area
A. Development of an 892 unit apartment project was completed. A
4, 000 square foot child care center was .also completed. A major
child care mitigation program was formalized and partially funded
by area property owners. The Agency completed the assemblage of
privately-owner properties in Area 4 .
B. Property Acquisition - Private Assemblages: The acquisition of
-property necessary to create developable areas for the commercial
uses has been completed. Minor assemblage activity of one of the
two residential projects remains.
C. Infrastructure Improvements: Preliminary engineering to set the
basis for future EIR and project scoping was initiated for the
arterial in the former Southern Pacific right-of-way.
II. North Richmond Redevelopment Project Area
A. Development: Agency staff continues to work with private
developers interested in industrial development north of Wildcat
Creek. A 7-unit infill housing project was brought back on-line
and construction is complete; two units remain to be sold in FY 93-
94 . Agency staff worked with several private and non-profit
developers in facilitating infill housing on scattered sites, and
a major subdivision near the Richmond Parkway.
B. Infrastructure: The Agency continued to work with the City of
Richmond on the Richmond Parkway (Route 93) . The design, alignment
and environmental assessment of Sections 4, 5 and 6, which will
connect the North Richmond industrial area to I-80, is on-going.
The Agency, has committed funds towards the Brookside Drive
realignment project, and initiated preliminary engineering and
environmental studies.
C. General: The Agency continues its involvement in the COMET
Program, a joint County-City neighborhood improvement program. The
Agency has played an active role in the creation of the North
Richmond Integrated Management Plan, a comprehensive County
neighborhood revitalization program. A rezoning program for the
employment area of North Richmond was initiated. . The Agency
initiated a focused code enforcement program that is linked to
subsequent property improvements.
D. Economic Development: A grant from the Private Industry Council
to provide an innovative employment training program for area
residents was secured by Rubicon with Agency assistance.
III. Bay Point Redevelopment Project Area
A. Development: Agency staff continues to work with non-profit and
private developers interested in affordable housing development
throughout the Project Area. Two projects - Alves Lane housing
renovation, and Anchor Cove - secured funding from the Agency.
Staff ,also continues to work with private developers interested in
commercial or industrial development along Willow Pass Road and the
industrial area north of Willow Pass -Road. Development of a First
Time Homebuyer Program was initiated.
B. Infrastructure. The Agency provided funding for street
improvements along Willow Pass Road, west of Bailey. The Agency
also has allocated funding for landscaping improvements at the Port
Chicago Highway/Willow Pass Road intersection.
C. Economic Development: Staff assistance resulted in the successful
relocation of Concord Meat Company to Bay Point. Preparation of
a marketing brochure for Bay Point was initiated.
D. General: Agency staff has provided technical assistance to the Bay
Point PAC and the PRIDE Committee to institute a neighborhood
improvement program. Questionnaires were sent to all property
owners in the North Broadway residential section of Bay Point to
assess needs and willingness to participate in such a program. A
focused - code enforcement program that is linked to subsequent
property improvements was initiated.
IV. Oakley
A. Development: Development of a First Time Homebuyer Program was
initiated. Commitment of financing to a senior housing project-
Golden Oak Senior Manor - was provided to permit the project to
pursue federal construction funds. Agency staff continues to work
with non-profit and private developers interested in residential .
and commercial development within the project area.
B. Infrastructure: The Agency provided funding to widen a portion of
the Highway 4, and provide for frontage improvements.
C. General: Agency staff initiated a downtown Specific Plan process.
Agency staff worked with the Oakley Municipal Advisory Council, the
County Public Works Department, the County Advanced Planning staff,
and the Oakley Chamber of Commerce to prepare a Specific Plan for
downtown Oakley.
V. Rodeo
A. Development: The Agency initiated a downtown/waterfront Specific
Plan process. Agency staff continues to work with private
developers interested in residential, mixed-use, and commercial
development in the Project Area.
B. Infrastructure: The Agency provided a commitment of funding San
Pablo/Willow/Park Avenue interchange improvement plans, and Agency
staff assisted in the CalTrain commuter train depot siting process.
B. General: The Agency has been actively involved in the on-going
Rodeo Waterfront Study of the EBRPD, the County and the Coastal
Conservancy.
SRA]1/Ih/budgetl.bos